powered help
header-left header-center header-right
File #: 091632    Version: 0
Type: Resolution Status: Passed
File created: 4/13/2010 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 5/4/2010
Effective date:    
Title: Resolution directing the City Engineer to apply for 2011 Urban Nonpoint Source and Stormwater Construction and Planning grants from the State of Wisconsin, Department of Natural Resources.
Sponsors: THE CHAIR
Indexes: CITY ENGINEER, STATE GRANTS, STORM SEWERS, WISCONSIN DEPARTMENT OF NATURAL RESOURCES
Attachments: 1. Fiscal Note, 2. Cover Letter.pdf, 3. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
5/10/20100 MAYOR SIGNED   Action details Meeting details Not available
5/4/20100 COMMON COUNCIL ADOPTEDPass13:0 Action details Meeting details Not available
4/21/20100 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Individual present: Tim Thur, Dept. of Public Works, Infrastructure Services
Pass5:0 Action details Meeting details Not available
4/15/20100 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
4/13/20100 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
091632
Version
ORIGINAL
Reference
Sponsor
THE CHAIR
Title
Resolution directing the City Engineer to apply for 2011 Urban Nonpoint Source and Stormwater Construction and Planning grants from the State of Wisconsin, Department of Natural Resources.
Analysis
This resolution directs the City Engineer to apply for a 2011 UNPS &SW construction grant from the Department of Natural Resources (DNR) in the amount of $650,000 with a City share of $500,000 and a grantor share of $150,000. This resolution also designates the City Engineer as the authorized agent for the City of Milwaukee for the purpose of entering into the 2011 Urban Nonpoint Source and Stormwater construction and planning grant agreements between the City of Milwaukee and the DNR.
Body
Whereas, Stormwater pollution control is an important component of the City of Milwaukee’s (City) storm water management regulation and the City’s permit with the DNR; and

Whereas, The Department of Natural Resources (DNR), per NR 151.13 (2) of the Wis. Adm. Code, requires all municipalities subject to its storm water discharge permit to implement, to the maximum extent practicable, a 40% reduction in Total Suspended Solids (TSS); and

Whereas, Wet detention ponds are one of the established and cost effective methods that can be implemented to remove sediments from large tributary areas and will aid the City in reaching the required TSS reduction goal; and

Whereas, The City is proposing to construct a wet detention pond at North 91st Street and West Calumet Avenue located within the municipal separate storm sewer system (MS4) portion of the city; and

Whereas, The wet detention pond will be sufficiently designed to treat storm water discharge from the entire 329 acre tributary area of storm sewer system number 2057; and

Whereas, The City Engineer will submit a signed Environmental Hazard Assessment form; and

Whereas, The operation of these grants begins on January 1, 2011 and ends on December 3...

Click here for full text