Title: Communication from the Department of Public Works relating to the status of Traffic-Calming and Complete Streets projects to address reckless driving and to provide a safer infrastructure for bicyclists and pedestrians.
Sponsors: ALD. BAUMAN
Attachments: 1. Presentation, 2. 2020 Milwaukee Complete Streets Health and Equity Report, 3. Reckless Driving Projects 9-08-22 Report
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
12/4/20240 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Kevin Muhs (and Rebecca Rabatin (Independence First).
Pass4:0 Action details Meeting details Video Video
11/13/20240 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIRPass5:0 Action details Meeting details Video Video
10/23/20240 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIRPass5:0 Action details Meeting details Video Video
10/2/20240 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIRPass5:0 Action details Meeting details Video Video
9/11/20240 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Appearing: Mike Amsden, DPW Ald. JoCasta Zamarripa, 8th Ald. Dist. Mr. Amsden said that trees would be added to the concrete installations on Wells St., scope and scale of all projects vary, additional measures were added to Van Buren St. to address concerns, intent was to continue bikeways on S. 6th St., and caution signs on bump outs on Capital Dr. were being address.
Pass5:0 Action details Meeting details Video Video
7/10/20240 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Appearing: Kevin Muhs, DPW DPW succeeded in completing traffic calming installations for the RNC downtown. DPW contracted out 11 raised crosswalks throughout the City to be constructed before school starts in the fall. DPW launched its speed reduction campaign recently, and the campaign was a portion of allocated ARPA funds.
Pass5:0 Action details Meeting details Video Video
6/20/20240 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Kevin Muhs - City Engineer, Dept. of Public Works Mr. Muhs gave a brief update: -Progressing with many of the projects under construction (Van Buren, Wells, Howard Ave, Walnut and Pleasant, Locust, 28th St, Hampton). -Started a resurfacing project on Montana Av. last week (the future of street local projects). -The bike boulevard on Washington and Scott will start today or tomorrow (depending on the rain) with utility work along the corridor. -Won two congestion mitigation and air quality awards related to the bikeway efforts across the city. Designs still to come.
Pass5:0 Action details Meeting details Video Video
5/30/20240 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Kevin Muhs and Jerrel Kruschke - DPW Mr. Muhs gave the following report: -The TID Project for Burnham Park public meeting was held on May 21st. -The Sherman Blvd. project: is moving to the deign phase after the 3rd round of public meetings being held. Ald. Bauman asked if there is any progress on Highland Blvd. with the DOT. Mr. Muhs said that Highland Blvd. between 25th and 20th is one of the projects that is targeted for ARPA funds for Traffic Calming and that it is the last corridor for those funds. He added that they are working with the DOT to follow up the state requirements process to remap where the state highway goes because there is a conflict between the type of traffic calming that they wish to do and the state expectations for traffic flow. He added that they will be reducing to one lane on each direction and that there will be a public meeting for that remapping.
Pass5:0 Action details Meeting details Not available
5/8/20240 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Jerrel Kruschke (DPW)
Pass5:0 Action details Meeting details Video Video
3/27/20240 PUBLIC WORKS COMMITTEE  

Minutes note: Kevin Muhs - DPW Construction season has started on Locust and Howard Av Van Buren and Michigan St will start next week
   Not available Meeting details Video Video
3/6/20240 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Kevin Muhs - City Engineer He said that Van Buren and Walnut projects have a contract on the way.
Pass5:0 Action details Meeting details Video Video
2/14/20240 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Kevin Muhs - City Engineer
Pass4:0 Action details Meeting details Video Video
1/24/20240 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Kevin Muhs (City Engineer) gave the following updates: -The map is going to be released next week -The Van Buren project will be advertised this week -Received a $4M Safe Streets Grant from the US DOT -Speed Limit Reduction (just held a meeting, the official lunch will be done this year) -Street Lighting (just awarded the first contract for circuit replacement)
Pass4:0 Action details Meeting details Video Video
1/4/20240 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Kevin Muhs (City Engineer) He said that they are mostly getting positive feedbacks about the traffic calming projects already implemented but also complaints that they are and will be reviewing as they come in. About the speed reduction project he said that it is moving forward, that they are collecting data about what the speed limit should be along commercial corridors and that it would be presented to the Common Council for approval. The map with the projects done by district will be distributed next week among the council members.
Pass4:0 Action details Meeting details Video Video
11/29/20230 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Kevin Muhs (City Engineer) said that they have reached the end of the construction season; reports will be done to be presented.
Pass4:0 Action details Meeting details Not available
10/18/20230 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Kevin Muhs - City Engineer Ald. Bauman said that following up with Capital Improvements asked Mr. Muhs if there is a list of funded and unfunded projects for budget amendments because some of the council members would like to put more money on these on the assumption that the funds will be used. Mr. Muhs said that they are working on an actual estimate and what would be the dictating factor of the capacity to utilize the funds at any given calendar year. He added that traffic calming needs are strong citywide. He said that they are going to get an estimate of additional funds that could be utilized based on staffing, consulting and contractor capacity. Ald. Bauman said that the deadline is tomorrow. He also said that 5 year backlog for sidewalks makes the city looks bad. Traffic Calming Update: -Near the end of the construction season. Rapid Implementation Projects: -Almost all concrete and striping pavement marking works are done. -Still working on installing signage on Burleigh, on the Sherman Park area and around UWM campus. He added that those orange barrels will stay out until the signage is up. ARPA Funded Projects: -Nearing the end of the city funds that went for reckless driving initiative for physical infrastructure. -Concrete is done except for the W Galena project that will be done next week. -Pavement marking done and working on signage or plastic delineators (depending on the project). -There is one ARPA project (last one) that will let for construction on 2024 (reduction lanes and protected bike lanes) on Highland Av between 35th St and 20th St. Safe Routes to School: -That work is largely complete and just as the other projects, still working on signage. TID Work: -There is only one work outstanding on construction on the Brewers Hill area. -The neighborhood traffic calming is complete. -Working right now on Walnut St between 10th and Phillips and; on 6th St between Walnut and Brown (it will be done by December 1st). -Some other works that are on design for construction next year: Van Buren, Michigan St, downtown west of the river (2024-2025 construction), by the stadium (west side of the city) and N 60th between Mill and Bradley. -There are other TIDS that design has not started yet but there is funding for those.
Pass3:0 Action details Meeting details Video Video
9/27/20230 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Kevin Muhs - DPW Traffic Calming Update: -Nearly the end of the construction season. -They had a bit of an issue with 2 projects (supply issue) that has been solved and will be done early next week. -Major constructions will be completed next year. Mr. Muhs said that the public can use the click for action to report delineators that need to be replaced. Mr. Muhs said that an update for next year's is coming up to inform the committee about their plans.
Pass5:0 Action details Meeting details Video Video
9/7/20230 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Mike Amsden - DPW
Pass5:0 Action details Meeting details Video Video
7/19/20230 PUBLIC WORKS COMMITTEE  

Minutes note: Mr. Muhs said that It is construction season, that a lot is happening out there. Ald, Brostoff asked to give a brief update on the reckless driving reduction initiative. Mr. Muhs said that measuring the progress is a difficult thing to do, that they will be looking in the future for death, fatality rate, life changing injuries rate, serious injuries rate and that those numbers will go down consistent with the zero vision piece. He added that they have seen progress and effectiveness in decreasing speeds particularly on drivers going 10 mph over the speed limit. Ald. Brostoff said that it is important to share that data with the public. Mr. Muhs said that they will share and promote the new data on speed reduction with the constituents.
   Not available Meeting details Not available
6/28/20230 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Kevin Muhs - DPW gave the following report: -The contract is in the process of being executed for the Rapid Implementation Projects for this year (pinned posts projects) on the Sherman Park area, around UWM and protecting bike lanes on North Av. (east of the river). -The work have started on the last portion of the ARPA traffic calming projects (there are 8 projects and work have started on the first one which is on North Av from 20th to 34th). -TID Projects: engaging a consultant to start with the design phase around the Stadium Business District and slightly western-south part of the city. -Finalize contract and kick off for the Speed Reduction Initiative this weekend.
Pass5:0 Action details Meeting details Video Video
6/7/20230 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Kevin Muhs - DPW - gave the following report on the street traffic calming and reckless driving mitigation infrastructure: -They have advertised for rapid implementation on three locations (pinned posts) and that they are exploring other options as well. The bid opens on June 14, 2023. -They are adding some pinned bump ups around UWM on Kenwood and Downer. -Another rapid implementation on North Av. will get started (mostly pinned posts). ARPA Funding Constructions: -The remaining four projects from 2022 are complete (N 35th both on the near west side and Capitol, N 27th near Capitol and N 60th near Hampton). -Moving forward with 2023 advertisement and finalizing the contract. TID Work: -The curbside extensions on Midtown Center (51st , 60th, Congress, Capitol and Fond Du Lac) are wrapping up. -Van Buren - there was a public meeting on May 23rd, and that there is another meeting on June 8th with residents and stakeholders. Interim Plaza Program: -4 pre-applications were awarded: 16th and Forest Home, Metcalf/Butterfly Park, Ivanhoe Plaza and 5th St south of Washington.
Pass5:0 Action details Meeting details Video Video
5/17/20230 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Kate Riordan - Senior Transportation Planner DPW - said that no major updates since the last meeting: -The 2023 advertisement: they are finalizing the contract with the lower bid for those 9 additional projects and that they will work on the construction schedule after. -The Safe Routes to School project will happen once the school year ends. -TID 42 Midtown Construction got some media news coverage. -Two another TID projects are in design phase and that they will have a public meeting for the Van Buren project (May 23rd) to show the two design alternatives and available online as well. The other project is the Michigan St. to redesign the bike lane and that they are meeting with the consultant. -For infrastructure projects (federal jobs) she said that many are under construction or in design phase. She added that 2 big updates are: - Interim Plaza Program - she said that they have developed the permit and have also released the grant opportunities to make sure that those plazas are available to community groups throughout the city and that they have received 4 applications. She added that the applications will be reviewed on May 24th. -Speed Limit Reduction Initiative - she said that they are working on finalizing the contract with the selected consultant and that hopefully it will be announced at the next meeting once the contract is signed. She added that another component will be safe speeds in general to respond to what the committee and residents have been asking for.
Pass5:0 Action details Meeting details Video Video
4/26/20230 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Ald. Bauman said that he and Ald. Brostoff received an extensive e-mail from a constituent who said that nothing has happened after the meeting that he made reference on the same document. Kevin Muhs - DPW - talked about the actions taken regarding the e-mail received. He also said that they are working on a plan and that a draft will be shared in about 6 weeks. Mike Amsdem - DPW reported the following: - Construction work have started on 9 jobs across the city - 7 additional jobs were advertised on early spring (ideally will be completed this year) - Work around schools will start on June to not interfere with the school year. - Substantial work is happening Ald. Brostoff said that he received very positive feedback from the project on Oakland and Newberry.
Pass5:0 Action details Meeting details Video Video
4/3/20230 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Appearing: Kevin Muhs - City Engineer
Pass5:0 Action details Meeting details Video Video
3/8/20230 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Mike Amsden - DPW; gave the following report: -Construction will start on several projects (a couple of projects that started last fall were held during the winter): The first 9 ARPA projects: 5 were completed last year and the 4 remaining will start on April if weather permits. Ald. Stamper asked Mr. Amsden to provide a brief overview of the program for the people that don't know much about it. Mr. Amsden said that on 2018 The City of Milwaukee passed a Complete Streets Policy which says that our streets are places for everyone (people walking, biking, taking transit, using mobility devices, pushing strollers and not for people driving cars only) and; that the streets must be safe and able to accommodate all sort of users and people of all ages and abilities. He added that they have been focusing on reducing the speed, preventing behaviors like passing on the right. He also said that they would love to move into a more proactive approach around redesigning the streets for better walking and biking conditions. He added that they have adopted Vision Cero thanks to the Mayor's leadership. Mr. Amsden continued with the report: -Last fall started the Safe Routes to Schools project on eight schools with federal funding improvements that will continue in May and that they are coordinating with each individual school to avoid impacting drop off and pick up times. -Several new projects that will be kicking of 2023. -The remaining 7 ARPA projects that were not advertised last year, will be advertised in April and to start short after. -Lots of TID funded work: TID 42 is scheduled to start March 20th, TID 41 will start the first week of April. -Full reconstruction projects will be kicking off this year. -Speed Limit Reduction Program is moving slowly. -A file for the residential speed limit reduction will be presented to the Public Safety and Health Committee.
Pass5:0 Action details Meeting details Video Video
2/15/20230 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Kevin Muhs - DPW Potholes He said that the challenge is not the extreme cold temperatures but the changes back and forth between freeze and thaw and that this spring conditions are showing up earlier this year. He added that for this 2023 they have about 850 requests, that the average response time is 2 days with a backlog of 150 as today. He said that to catch up with a backlog like this, people from the Street Maintenance Division gets pulled off and on to work on potholes. He also said that they are going to initiate weekend overtime on potholes. Ald. Bauman pointed out that not all the potholes are reported and that there are potholes almost on every street. Mr. Muhs said that he understand the frustration and that there is a huge increase on the reports. He said that 11,500 requests were received on 2022 which was an increase of almost 3,000 versus 2021. He also asked the public to use the tools that are available (286-CITY, click for action and mobile action app) to report the potholes. He said that the street crews are being proactive and taking care and/or reporting potholes on the go. He added that the staffing challenges across the department is the mayor challenge and that they are doing what they can. Ald. Rainey asked what happened with the creation of the dashboard that was approved about 6 years ago. Mr. Muhs said that he cannot comment anything about this project but that he will talk to the DPW Commissioner to prepare a report. Reckless Driving He said that there was a resolution to shift $500,000 away from the Speed Limit Reduction Initiative (for more speed humps at the reduced rate) which impacts the time spent on communication, advertising and other promotional efforts to make the public aware of the speed limit. He said that only 3 months of public outreach education is possible now instead on 6 months. He added that they are replacing the speed limits signs on residential streets and that individual commercial corridors require a different analysis to determine the correct speed. He also said that moving forward, a resolution file was introduced last Tuesday. Van Buren Project near Downtown He said that the design work is happening and that it will be done on the 2024 contract season. Ald. Stamper asked about the street light program. Mr. Muhs said that they are working on the design phase of the circuits and hoping to start the construction of some of them soon and that he will report back on it. Ald. Zamarripa asked if decreasing the speed limits will help to curve the reckless driving and speeding. Mr. Muhs said that it will be effective for saving lives and reducing fatalities. He mentioned that the City of Madison announced this morning that they have had two successful years in reducing fatalities and serious injuries by decreasing speed limits and letting the public to know about it. He added that the plan is to reduce the speed limit to 20 mph on residential areas and to 30-25 mph on commercial streets.
Pass5:0 Action details Meeting details Video Video
1/25/20230 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Kevin Muhs - DPW •Rapid Implementation Coordinating with the Burleigh BID, East Side BID, and UWM on potential projects, but final plans and maintenance agreements aren’t yet finalized. •ARPA Construction 2022 Advertisement -5 of the 9 projects completed (Locust near Sherman Park, Oklahoma near Humboldt Park, Butterfly Park, and S 35th near Jackson Park, Oakland at Newberry). -Remaining 4 will begin construction this spring when weather breaks (N 35th on near west side, N 35th near Capitol, N 27th near Capitol, N 60th near Hampton). 2023 Advertisement -5-7 additional projects will be advertised in early February (27th/FDL/Center, Lapham east of Chavez, North east of 30th, 40th and Galena near Washington Park, Locust at Cambridge, Lincoln Ave through Lincoln Village). -One additional project, Highland Blvd, will be advertised later this spring as we're developing a more complex design (bus islands, protected bike lanes) and are required to coordinate with MCTS and WisDOT. •Safe Routes to School – various locations -Pavement markings complete. -Concrete going in spring-didn’t want to disrupt paths to school in case we couldn’t get concrete. •TID Work -TID 85 – concrete work along 6th in Walkers Point is complete. TIDs (Midtown let for spring construction, Stadium about to enter design and outreach.
Pass4:0 Action details Meeting details Not available
1/5/20230 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Kevin Muhs - City Engineer Regarding the speed limit reduction: he said that a file must be created because the process was done through the bugdet in order to complete the process and move forward.
Pass5:0 Action details Meeting details Video Video
11/30/20220 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Mr. Kevin Muhs - DPW provided the following report: -Fully completed those pinned down bump outs placed on some medians (placed on top of the road's surface) across the city despite the supply issues with the signage brackets. -There are four similar efforts that will be completed on late spring of 2023. -The concrete work around 8 school across the city has been delayed (pavement markings and signage have been completed) due concrete related supply challenges. This work will be also completed on the spring of 2023. -The concrete work related TID 85 - is complete and working on landscaping details. -Other TID work like Midtown and Stadium Business District will go next year. -Speed humps: The fourth contract went out and that there are 13 speed humps left to do (excepted to be done on the next couple of weeks). -The speed hump money from ARPA will be taken care of before the end of the calendar year.
Pass5:0 Action details Meeting details Video Video
11/10/20220 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Jerrel Kruschke - DPW Commissioner - he said that this file will be handed off to Kevin Muhs - City Engineer. ARPA Projects: Oklahoma - just added Locust and Cambridge - complete Galena and Washington - complete Lapham and N Lincoln - going on now Appleton Av - complete (meeting coming up soon) 4 remaining projects (with more difficult design) that will be done next year: N 35th St, N 60th St, N 35th St and N 27th St. Safe School Program: Pavement markings have been completed at this point, there is concrete work starting next week and that they will continue to push as much as they can before the winter season is here. TID Work: TID85 - along 6th St on the south side (underway). Most of the other TID that they made amendments with the Department of City Development will go on next year. Van Buren: they have 4 consultants on board and the proposals will be reviewed on the 18th. Speed Hump Program with 4 contracts this year: 2 contracts are completed 3rd contract is on the way 4th will be done at the end of the year Speed Limit Reduction Program: It will be recalibrated and it will be presented on the next meetings. City Hall Foundation Work: It is finalizing, final touches at the exterior but the foundation work continues (inside) and no work at the tower. Market St.: Plan to make it a pedestrian area.
Pass3:0 Action details Meeting details Video Video
10/19/20220 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Mike Amsdem - DPW
Pass4:0 Action details Meeting details Video Video
9/28/20220 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Mr. Jerrel Kruschke - DPW - talked about the report that was added to this file.
Pass4:0 Action details Meeting details Video Video
9/26/20220 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
9/8/20220 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Jerrel Kruschke - DPW - the report will be added to the file.
Pass5:0 Action details Meeting details Video Video
7/20/20220 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Mike Amsdem - DPW- said that several projects that are on the works and gave the following report: The ARPA funded for reckless driving initiative said that 9 projects are advertised now and that the bids open on July 28th (next week) and that the construction will start this year. -Advertizing traffic calming work around Midtown and that bids open earlier in August. -Advertizing traffic calming work near the Manpower campus. He added that he does not know if these two projects will start this year but the contracts will be awarded this year. -8 school projects around the city - the contract have been awarded and the work will start early August. -Speedhumps (the last batch was approved today) -Speed limit RP (it was released and proposals are due on July 29th) with 2 prompts: one for city wide marketing and awareness campaign and the other piece for speed limit on the streets. He added that there is no schedule yet. Scooter program: The proposals were due and received 4 proposals that are being reviewed right now. Van Buren St. Project: the design consultants will be selected on the coming weeks. Water St - Third Ward - there is no funding in place to hire a consultant yet. Bike Route on Jefferson - this is coming after the Van Buren St to connect it with the Beerline as well and probably on the works over the winter next year.
Pass4:0 Action details Meeting details Video Video
6/29/20220 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Mr. Jerell Kruschke - DPW - Said that the speed hump requests for this year is about to end with the 60 speeds humps coming up on July 20th. He reported that a total of 270 speed humps will be approved and built this year. He added that any coming requests will be for the 2023 season at a cost of $6.50 per lineal foot since the ARPA funds have been used. Mr. Kruschke said that speed humps are popular because they are requested by the residents and that traffic circles are assessable projects as well at a cost of $4.60 per lineal foot. He said that the department is actively applying for grants and that the whole campaign to reduce the speed limits is about to come out.
Pass5:0 Action details Meeting details Video Video
6/8/20220 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Mr. Kruschke said that 83 different projects have been approved so far and that the first contract will start on the week of the 4th of July. He added that 2nd contract will be advertise on July as well and the 3rd contract after that. Mr. Kruschke explained that once the project is advertised, it takes about 2 months to get started and that residents will see a full impact in August.
Pass5:0 Action details Meeting details Video Video
5/18/20220 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Mike Amsden - DPW - said that the 8 traffic calming projects are completed for advertisement and that they will be constructed this year. Added that seven other projects are on the analysis phase (engineering). As for the speed humps Mr. Amsden said that the queue is down to zero and 87 requests are out for survey. Added that new calming traffic proposals from the common council members can be send to Jerrel Kruschke. Mr. Amsden stated that speed limit project is coming out soon.
Pass5:0 Action details Meeting details Video Video
4/27/20220 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Jerell Kruschke - Acting DPW Commissioner said that there were 109 speed humps in the queue and that it is down to 16. Added that the first contract will be advertised two weeks from now. Mike Amsden - DPW - talked about the nine (9) ARPA projects that have been pushed forward package will be advertised in May $3.8 M for reckless driving and that they are intended to slow down the speeds, prevent from passing on the right and get things out quickly and effectively.
Pass4:0 Action details Meeting details Video Video
4/7/20220 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Jerell Kruschke - DPW - gave a report of the speed humps as follows: 193 requests 26 in the queue 81 in survey process 31 approved today Added that contracts have been broken up in small batches to be right on target.
Pass5:0 Action details Meeting details Video Video
3/9/20220 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Jerrel Kruschke - City Engineer
Pass5:0 Action details Meeting details Video Video
2/17/20220 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Jerrell Kruschke - DPW - gave the following speed humps report: -171 requests have been received -70 requests in the queue (129 on the last cycle) -56 requests are out in survey, -10 were approved today -5 already approved (last cycle) -12 requests have been rejected due negative postcard survey or because did not meet the criteria. Ald. Stamper asked for a clarification of the cost. Mr. Kruschke explained that the assessment rate is $2.00 per lineal foot vs $6.50 per lineal foot that used to be in the past and that the new assessment fee is listed on all of the notifications that are mailed out.
Pass4:0 Action details Meeting details Video Video
1/26/20220 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Jerrel Kruschke - DPW City Engineer said that the ARPA dollars have been received and that 160 speed humps have been requested with 109 sitting in the queue and that hey have started to schedule them like we have seen on item 1 this morning.
Pass5:0 Action details Meeting details Video Video
1/6/20220 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Jerrell Kruschke - DPW said that there are not a lot of updates except for the speed humps requests that will start to come through. Added that they have received 159 requests so far. Ald. Stamper asked how those requests were made. Mr. Kruschke said that they came from different sources: the aldermanic offices referring people to them, the tv news, and that the website will be updated. Ald. Perez if these 159 requests are already in the queue. Mr. Kruschke said that they are in the queue and just waiting for the assessable rate to drop to start to send the notices and that there was delay because of the change on the assessable rate and did not want to confuse the constituents by sending two different notices. Ald. Perez asked how much further we can go with the ARPA dollars for the speed humps. Mr. Kuschke said that about 300-320 speed humps estimated assessment value. Ald. Perez asked if after these 300-320 speed humps we will go back to the prior cost of $6.50 Mr. Kruschke said that we will need to come back to committee for that matter.
Pass5:0 Action details Meeting details Video Video
12/1/20210 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Jeff Polenske - Commissioner of Public Works Jerrell Kruschke - Coordination Manager DPW
Pass5:0 Action details Meeting details Not available
11/10/20210 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIR

Minutes note: Jeff Polenske, Jerrell Kruschke - DPW
Pass5:0 Action details Meeting details Video Video
11/2/20210 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

211119

Version

ORIGINAL

Reference

 

Sponsor

ALD. BAUMAN

Title

Communication from the Department of Public Works relating to the status of Traffic-Calming and Complete Streets projects to address reckless driving and to provide a safer infrastructure for bicyclists and pedestrians.

Requestor

 

Drafter

K. Broadnax

11.02.2021

LRB177081-1