File #: 200576    Version: 0
Type: Resolution Status: Passed
File created: 9/1/2020 In control: COMMON COUNCIL
On agenda: Final action: 9/22/2020
Effective date:    
Title: Resolution directing the Commissioner of Public Works to execute documents titled “State/Municipal Agreement for a State-Let Highway Project” for various streets; and a “State/Municipal Agreement for a State-Let Local Bridge Project” with the Wisconsin Department of Transportation for the rehabilitation of the North Holton Street Bridge over the Milwaukee River in three phases; and to set up funds for design engineering at an estimated total cost of $4,471,828 with an estimated City share of $979,084 and a grantor share of $3,492,744.
Sponsors: THE CHAIR
Indexes: AGREEMENTS, BRIDGES, WISCONSIN DEPARTMENT OF TRANSPORTATION
Attachments: 1. 2455-07-00_70Locust.pdf, 2. 2545-09-01_71Hampton.pdf, 3. 2590-04-01Lisbon.pdf, 4. 2674-02-00_70Walnut.pdf, 5. 2984-12-04-74 HoltonStPh2 CMilwaukee.pdf, 6. 2984-12-05-75 HoltonStPh3 CMilwaukee.pdf, 7. 2984-12-03-73 HoltonStPh1 CMilwaukee.pdf, 8. 2455-07-00.pdf, 9. 2545-09-01.pdf, 10. 2590-04-01.pdf, 11. 2674-02-00.pdf, 12. 2984-12-03.pdf, 13. 2984-12-04.pdf, 14. 2984-12-05.pdf, 15. Multi SMA Resolution 08212020.pdf
Number
200576
Version
ORIGINAL
Reference
Sponsor
THE CHAIR
Title
Resolution directing the Commissioner of Public Works to execute documents titled “State/Municipal Agreement for a State-Let Highway Project” for various streets; and a “State/Municipal Agreement for a State-Let Local Bridge Project” with the Wisconsin Department of Transportation for the rehabilitation of the North Holton Street Bridge over the Milwaukee River in three phases; and to set up funds for design engineering at an estimated total cost of $4,471,828 with an estimated City share of $979,084 and a grantor share of $3,492,744.
Analysis
This resolution authorizes and directs the Commissioner of Public Works to execute State/Municipal Agreements with the Wisconsin Department of Transportation for the programming, design, and construction of local arterial streets with 80 percent Federal and State aid under the Surface Transportation Program. This Resolution also authorizes the Commissioner of Public Works to execute a Project Agreement with the WisDOT for rehabilitation of the North Holton Street Bridge over the Milwaukee River with Federal and/or State aid. This resolution also directs the City Comptroller to transfer funds for preliminary engineering for these projects. The estimated total cost of the projects is $19,510,562 with an estimated City share of $4,045,472 and a grantor share of $15,465,090. The estimated preliminary engineering costs for these projects are $4,471,828 with an estimated City share of $979,084 and a grantor share of $3,492,744. Construction funds for these projects will be included in future resolutions.
Body
Whereas, A project agreement has been requested and received from the Wisconsin Department of Transportation (WisDOT) to be executed by the City of Milwaukee for the programming, design, and construction of the following paving projects with Street with Federal and State aid under the Surface Transportation Program:

State I.D. 2455-07-00, 70...