powered help
header-left header-center header-right
File #: 191359    Version:
Type: Resolution Status: Passed
File created: 12/17/2019 In control: COMMON COUNCIL
On agenda: Final action: 1/21/2020
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $302,800 for a total estimated cost of $316,800.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. signed letter 6.pdf, 2. Official Ad Cycle 6.pdf, 3. Signed Ad.pdf
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
1/30/20201 MAYOR SIGNED   Action details Meeting details Not available
1/21/20201 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
1/8/20201 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 5th Aldermanic District N. 97th Pl. – W. Keefe Ave. to W. Metcalf Pl. (ST211150175). Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding ( 8’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 5-0) 10th Aldermanic District N. 72nd St. – W. Locust St. to W. Chambers St. (ST211180248). Install traffic calming speed hump(s). Tim Resonde stated the speed hump seems excessive. Ald. Murphy moved approval. (Prevailed 5-0) 12th Aldermanic District S. 17th St. – W. Greenfield Ave. to W. Scott St. (ST211190122). Install traffic calming speed hump(s). Jeff 1200 S 17th St stated people are driving 130 mph and they don't need speed humps they need stronger penalties. Ald. Kovac moved approval. (Prevailed 5-0) 15th Aldermanic District N. 37th St. – W. Cherry St. to W. Galena St. (ST211190196). Install traffic calming speed hump(s). Ald. Johnson moved approval. (Prevailed 5-0) W. Cherry St. – N. 35th St. to N. 37th St. (ST211190191). Install traffic calming speed hump(s). Ald. Borkowski moved approval. (Prevailed 5-0) W. Galena St. – N. 35th St. to N. 37th St. (ST211190192). Install traffic calming speed hump(s). Ald. Kovac moved approval. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
12/17/20190 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
191359
Version
SUBSTITUTE 1
Reference
140703
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $302,800 for a total estimated cost of $316,800.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $302,800. The total estimated cost of these projects is $316,800.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

5th Aldermanic District

N. 97th Pl. - W. Keefe Ave. to W. Metcalf Pl. (ST211150175). File Number 140703: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding ( 8’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $26,000; Nonassessable Reconstruction Paving Fund -- $220,000). The total estimated cost for this project including the requested amount is $260,000. This project is anticipated to be completed during the 2020 construction season.

10th Aldermanic District

N. 72nd St. - W. Locust St. to W. Chambers St. (ST211180248). Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $8,500; Nonassessable Reconstruction Paving Fund -- $2,100). The total estimated cost for this project including the requested amount is $10,600. This project is anticipated to be completed du...

Click here for full text