File #: 191359    Version:
Type: Resolution Status: Passed
File created: 12/17/2019 In control: COMMON COUNCIL
On agenda: Final action: 1/21/2020
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $302,800 for a total estimated cost of $316,800.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. signed letter 6.pdf, 2. Official Ad Cycle 6.pdf, 3. Signed Ad.pdf
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
1/30/20201 MAYOR SIGNED   Action details Meeting details Not available
1/21/20201 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
1/8/20201 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 5th Aldermanic District N. 97th Pl. – W. Keefe Ave. to W. Metcalf Pl. (ST211150175). Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding ( 8’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 5-0) 10th Aldermanic District N. 72nd St. – W. Locust St. to W. Chambers St. (ST211180248). Install traffic calming speed hump(s). Tim Resonde stated the speed hump seems excessive. Ald. Murphy moved approval. (Prevailed 5-0) 12th Aldermanic District S. 17th St. – W. Greenfield Ave. to W. Scott St. (ST211190122). Install traffic calming speed hump(s). Jeff 1200 S 17th St stated people are driving 130 mph and they don't need speed humps they need stronger penalties. Ald. Kovac moved approval. (Prevailed 5-0) 15th Aldermanic District N. 37th St. – W. Cherry St. to W. Galena St. (ST211190196). Install traffic calming speed hump(s). Ald. Johnson moved approval. (Prevailed 5-0) W. Cherry St. – N. 35th St. to N. 37th St. (ST211190191). Install traffic calming speed hump(s). Ald. Borkowski moved approval. (Prevailed 5-0) W. Galena St. – N. 35th St. to N. 37th St. (ST211190192). Install traffic calming speed hump(s). Ald. Kovac moved approval. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
12/17/20190 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

191359

Version

SUBSTITUTE 1

Reference

140703

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $302,800 for a total estimated cost of $316,800.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $302,800.  The total estimated cost of these projects is $316,800.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

5th Aldermanic District

 

N. 97th Pl. - W. Keefe Ave. to W. Metcalf Pl. (ST211150175). File Number 140703:             Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding ( 8’  width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $26,000; Nonassessable Reconstruction Paving Fund -- $220,000). The total estimated cost for this project including the requested amount is $260,000.  This project is anticipated to be completed during the 2020 construction season.

 

10th Aldermanic District

 

N. 72nd St. - W. Locust St. to W. Chambers St. (ST211180248).  Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $8,500; Nonassessable Reconstruction Paving Fund -- $2,100). The total estimated cost for this project including the requested amount is $10,600.  This project is anticipated to be completed during the 2020 construction season.

 

12th Aldermanic District

S. 17th St. - W. Greenfield Ave. to W. Scott St. (ST211190122).  File Number 191360:

 Install traffic calming speed hump(s). Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $8,900; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $10,900.  This project is anticipated to be completed during the 2020 construction season.

 

15th Aldermanic District

 

N. 37th St. - W. Cherry St. to W. Galena St. (ST211190196).  Install traffic calming speed hump(s). Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $2,200; Nonassessable Reconstruction Paving Fund -- $4,800). The total estimated cost for this project including the requested amount is $7,000.  This project is anticipated to be completed during the 2020 construction season.

 

W. Cherry St. - N. 35th St. to N. 37th St. (ST211190191).  Install traffic calming speed hump(s). Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $1,800; Nonassessable Reconstruction Paving Fund -- $11,700). The total estimated cost for this project including the requested amount is $13,500.  This project is anticipated to be completed during the 2020 construction season.

 

W. Galena St. - N. 35th St. to N. 37th St. (ST211190192). Install traffic calming speed hump(s).  Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $2,200; Nonassessable Reconstruction Paving Fund -- $12,600). The total estimated cost for this project including the requested amount is $14,800.  This project is anticipated to be completed during the 2020 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That projects N. 97th Pl. (ST211150175); N. 72nd St. (ST211180248); S. 17th St. (ST211190122); N. 37th St. (ST211190196);  W. Cherry St. (ST211190191); W. Galena St. (ST211190192) will be billed after January 1, 2022, but not before 12 months after the project contract has been completed;

 

 

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/dl

Afr 6

01/06/2020