powered help
header-left header-center header-right
File #: 180869    Version:
Type: Ordinance Status: Passed
File created: 9/25/2018 In control: COMMON COUNCIL
On agenda: Final action: 10/16/2018
Effective date:    
Title: A substitute ordinance relating to surveys of water supply cross-connections.
Sponsors: THE CHAIR
Indexes: BUILDING-REGULATION, WATER WORKS
Attachments: 1. Notice Published on 11-1-18
Number
180869
Version
SUBSTITUTE 1
Reference

Sponsor
THE CHAIR
Title
A substitute ordinance relating to surveys of water supply cross-connections.
Sections
97-12-6-b rc
97-12-9.5 cr
Analysis
This ordinance changes the required frequency for surveys of commercial premises to identify possible water supply cross-connections from a minimum of once every 10 years to a minimum of once every 2 years. Two exceptions to this required survey frequency are provided:

1. For a commercial premises with a risk of cross-connection similar to or less than a residential premises, the survey shall be conducted a minimum of once every 20 years.

2. For a multi-family residential or condominium premises, except a premises heated by a boiler, the survey shall be conducted a minimum of once every 5 years.

This ordinance also authorizes the water works to delegate its inspection, survey, and enforcement authority and duties related the cross-connection control program to the department of neighborhood services pursuant to a memorandum of understanding.
Body
The Mayor and Common Council of the City of Milwaukee do ordain as follows:

Part 1. Section 97-12-6-b of the code is repealed and recreated to read:

97-12. Cross-Connection Control Regulations.

6. CROSS-CONNECTION CONTROL PROGRAM.

b. Conducting a survey of each commercial premises and each public authority a minimum of once every 2 years, subject to the following exceptions:

b-1. For a commercial premises with a risk of cross-connection similar to or less than a residential premises, the survey schedule may be the same as described in par. a.

b-2. For a multi-family residential or condominium premises, except a premises heated by a boiler, the survey shall be conducted a minimum of once every 5 years.

Part 2, Section 97-12-9.5 of the code is created to read:

9.5. DELEGATION OF AUTHORITY. The water works may delegate the inspection, survey, and enforcement authority and duties established in this ...

Click here for full text