powered help
header-left header-center header-right
File #: 180869    Version:
Type: Ordinance Status: Passed
File created: 9/25/2018 In control: COMMON COUNCIL
On agenda: Final action: 10/16/2018
Effective date:    
Title: A substitute ordinance relating to surveys of water supply cross-connections.
Sponsors: THE CHAIR
Indexes: BUILDING-REGULATION, WATER WORKS
Attachments: 1. Notice Published on 11-1-18

Number

180869

Version

SUBSTITUTE 1

Reference

 

Sponsor

THE CHAIR

Title

A substitute ordinance relating to surveys of water supply cross-connections.

Sections

97-12-6-b                     rc

97-12-9.5                     cr

Analysis

This ordinance changes the required frequency for surveys of commercial premises to identify possible water supply cross-connections from a minimum of once every 10 years to a minimum of once every 2 years.  Two exceptions to this required survey frequency are provided:

 

1.  For a commercial premises with a risk of cross-connection similar to or less than a residential premises, the survey shall be conducted a minimum of once every 20 years.

 

2.  For a multi-family residential or condominium premises, except a premises heated by a boiler, the survey shall be conducted a minimum of once every 5 years.

 

This ordinance also authorizes the water works to delegate its inspection, survey, and enforcement authority and duties related the cross-connection control program to the department of neighborhood services pursuant to a memorandum of understanding.

Body

The Mayor and Common Council of the City of Milwaukee do ordain as follows:

 

Part 1.  Section 97-12-6-b of the code is repealed and recreated to read:

 

97-12.  Cross-Connection Control Regulations.

 

6.  CROSS-CONNECTION CONTROL PROGRAM.

 

b.  Conducting a survey of each commercial premises and each public authority a minimum of once every 2 years, subject to the following exceptions:

 

b-1.  For a commercial premises with a risk of cross-connection similar to or less than a residential premises, the survey schedule may be the same as described in par. a.

 

b-2.  For a multi-family residential or condominium premises, except a premises heated by a boiler, the survey shall be conducted a minimum of once every 5 years.

 

Part 2,  Section 97-12-9.5 of the code is created to read:

 

9.5.  DELEGATION OF AUTHORITY.  The water works may delegate the inspection, survey, and enforcement authority and duties established in this section to the department of neighborhood services pursuant to a memorandum of understanding.

LRB

APPROVED AS TO FORM

 

 

__________________________

Legislative Reference Bureau

Date:______________________

Attorney

IT IS OUR OPINION THAT THE ORDINANCE

IS LEGAL AND ENFORCEABLE

 

 

__________________________

Office of the City Attorney

Date:______________________

Requestor

DPW - Water Works

Drafter

LRB172230-2

Jeff Osterman

10/01/2018