powered help
header-left header-center header-right
File #: 081393    Version:
Type: Resolution Status: Passed
File created: 2/10/2009 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 3/3/2009
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $792,544 for a total estimated cost of $5,199,807.88.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Cover Letter.pdf, 2. Fiscal note, 3. Official Notice Number 84, 4. Official Notice Number 84 committee actions, 5. Comptroller's Certification, 6. Hearing Notice List, 7. Notice Published on 3-19-09
Number
081393
Version
SUBSTITUTE 1
Reference
07082
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $792,544 for a total estimated cost of $5,199,807.88.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $792,544. The total estimated cost of these projects is $5,199,807.88.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

1st Aldermanic District

N. 34th St. - A point 500 feet m/l south of W. Thurston Ave. to W. Thurston Ave. (ST211090102) File Number 070782: Asphalt pavement resurfacing, replace sidewalk where necessary, sodding (15-foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $100 ; Nonassessable Reconstruction Paving Fund -- $40,000). The total estimated cost for this project including the requested amount is $65,100. This project is anticipated to be completed during the 2009 construction season.

2nd and 5th Aldermanic District

W. Silver Spring Dr. (CTH ā€œEā€) - N. 90th St. to N. 124th St. (ST320082201) (2090-13-70) File Number 081111: Asphalt Pavement Resurfacing; rubble existing roadway, resurface with asphalt pavement. (City Share Non-Assessable Paving Fund -- $90,809, City Share Assessable Paving Fund -- $49,635). The total estimated cost for this project in...