File #: 081393    Version:
Type: Resolution Status: Passed
File created: 2/10/2009 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 3/3/2009
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $792,544 for a total estimated cost of $5,199,807.88.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Cover Letter.pdf, 2. Fiscal note, 3. Official Notice Number 84, 4. Official Notice Number 84 committee actions, 5. Comptroller's Certification, 6. Hearing Notice List, 7. Notice Published on 3-19-09

Number

081393

Version

SUBSTITUTE 1

Reference

07082

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $792,544 for a total estimated cost of $5,199,807.88.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $792,544.  The total estimated cost of these projects is $5,199,807.88.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

1st Aldermanic District

 

N. 34th St. - A point 500 feet m/l south of W. Thurston Ave. to W. Thurston Ave. (ST211090102)  File Number 070782: Asphalt pavement resurfacing, replace sidewalk where necessary, sodding (15-foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $100 ; Nonassessable Reconstruction Paving Fund -- $40,000).  The total estimated cost for this project including the requested amount is $65,100.  This project is anticipated to be completed during the 2009 construction season.

 

2nd and 5th Aldermanic District

 

W. Silver Spring Dr. (CTH “E”) - N. 90th St. to N. 124th St. (ST320082201) (2090-13-70) File Number 081111: Asphalt Pavement Resurfacing; rubble existing roadway, resurface with asphalt pavement.  (City Share Non-Assessable Paving Fund -- $90,809, City Share Assessable Paving Fund -- $49,635). The total estimated cost for this project including the requested amount is $3.8 million. This project is anticipated to be completed during the 2009 construction season.

 

These funds are to be transferred to the construction account (ST3200822XX)

(2090-13-70).

 

Previously authorized for road construction: $0.00

 

Current estimated cost of the total project including this resolution: $4,447,707.88

 

Original estimated cost of the total project: $3,800,000.00.  (Milwaukee County is the lead contracting agent)

 

This project is anticipated to be completed during the 2009 construction season.

 

5th Aldermanic District

 

N. 79th St. - W. Fiebrantz Ave. to N. 78th St. (ST211060106) File Number 040945: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (9-foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $2,000; Nonassessable Reconstruction Paving Fund -- $60,000).  The total estimated cost for this project including the requested amount is $73,000.  This project is anticipated to be completed during the 2009 construction season.

 

10th Aldermanic District

 

N. 91st St. - W. Blue Mound Rd. to W. Wisconsin Ave. (ST21110123) File Number 080004: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8.6-foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $12,000; Nonassessable Reconstruction Paving Fund -- $170,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2009 construction season.

 

11th Aldermanic District

 

W. Nebraska Ave. - S. 52nd St. to S. 54th St. (ST211060164) File Number 051083: Asphalt pavement overlay. (Assessable Reconstruction Paving Fund -- $2,000; Nonassessable Reconstruction Paving Fund -- $25,000).  The total estimated cost for this project including the requested amount is $30,000.  This project is anticipated to be completed during the 2009 construction season.

 

S. Utah Ave. - W. Forest Home Ave. to W. Nebraska Ave. (ST211060165) File Number 051083: Asphalt pavement overlay. (Assessable Reconstruction Paving Fund -- $2,000; Nonassessable Reconstruction Paving Fund -- $25,000).  The total estimated cost for this project including the requested amount is $29,000.  This project is anticipated to be completed during the 2009 construction season.

 

S. 52nd St. - W. Nebraska Ave. to a point 400 feet m/l north of W. Nebraska Ave. (ST211060162) File Number 051083:  Asphalt pavement overlay.  (Assessable Reconstruction Paving Fund -- $2,000; Nonassessable Reconstruction Paving Fund -- $30,000).  The total estimated cost for this project including the requested amount is $35,000.  This project is anticipated to be completed during the 2009 construction season.

 

S. 54th St. - W. Nebraska Ave. to W. Ohio Ave. (ST211060163) File Number 051083:  Asphalt pavement overlay. (Assessable Reconstruction Paving Fund -- $2,000; Nonassessable Reconstruction Paving Fund -- $60,000).  The total estimated cost for this project including the requested amount is $69,000.  This project is anticipated to be completed during the 2009 construction season.

 

Alley between W. Cleveland Ave., W. Harrison Ave., S. 71st St., S. 72nd St., (Portions in the City of West Allis) (ST212020103/ST214090106) File Number 080808:

Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. (Assessable Alley Paving Fund -- $25,000 ; Nonassessable Alley Paving Fund -- $25,000: Developer Paving fund -- $50,000).  The total estimated cost for this project including the requested amount is $112,000.  This project is anticipated to be completed during the 2009 construction season.

 

15th Aldermanic District

 

Alley between W. Lisbon Ave., W. Roberts St., N. 39th St. and N. 40th St. (ST212060122) File Number 060138: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. (Assessable Alley Paving Fund -- $ 40,000 ; Nonassessable Alley Paving Fund -- $80,000).  The total estimated cost for this project including the requested amount is $139,000.  This project is anticipated to be completed during the 2009 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That projects N. 34th St. (ST211090102); W. Silver Spring (ST320082201): N. 79th St. (ST211060106); N. 91st St. (ST21110123); W. Nebraska Av. (ST211060164); S. Utah Av. (ST211060165); S. 52nd St. (ST211060162); S. 54th St. (ST211060163); Alley W. Cleveland Av. (ST212020103); and Alley W. Lisbon Av. (ST212060122) will be billed after January 1, 2011, but not before 12 months after the project contract has been completed; and, be it

 

Further Resolved, That the following project be deleted from the 2009 Paving Program:

Alley between W. Center St., W. Ridge Ct., N. Swan Rd., N. 92nd St., N. 93rd St., City Limits (Portions in the City of Wauwatosa) (ST212090108).

 

Requestor

Infrastructure Services Division

Drafter

MLD:dr

Afr 8

02/19/2009