Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $43,513 for a total estimated cost of these projects being $1,223,513.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. Prop Sub A (now substitute 1)
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
8/3/20261 MAYOR SIGNED   Action details Meeting details Not available
7/31/20261 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
7/22/20260 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Appeared Holly Rutenbeck (DPW)
Pass5:0 Action details Meeting details Video Video
7/22/20261 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Appeared Holly Rutenbeck (DPW)
Pass5:0 Action details Meeting details Not available
7/14/20260 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number
260439
Version
SUBSTITUTE 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $43,513 for a total estimated cost of these projects being $1,223,513.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction. The City cost for engineering these projects is estimated to be $43,513 with the total cost estimated to be $1,223,513.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

6th Aldermanic District

Alley between W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. (ST212220116) File Number 251879: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary. (Nonassessable Alley Paving Fund -- $30,000, additional funds). The total estimated cost for this project including the requested amount is $470,000. This project is anticipated to be completed during the 2026 construction season.

7th Aldermanic District

W. Vienna Ave. - N. 35th St. to N. 41st St. (ST211140134) File Number 201063: Concrete pavement reconstruction and asphalt pavement resurfacing, replace all cu...

Click here for full text