powered help
header-left header-center header-right
File #: 110924    Version:
Type: Resolution Status: Passed
File created: 11/2/2011 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 11/30/2011
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $710,000 for a total estimated cost of these projects being $9,788,340.
Sponsors: THE CHAIR
Indexes: BRIDGES, PUBLIC IMPROVEMENTS, SEWERS
Attachments: 1. Proposed Substitute A, 2. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
12/1/20111 MAYOR SIGNED   Action details Meeting details Not available
11/30/20111 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
11/16/20110 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Individual appearing: Mary Dziewiontkoski, DPW-Infrastructure Services Proposed Substitute B is accepted.
Pass4:0 Action details Meeting details Not available
11/16/20111 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass4:0 Action details Meeting details Not available
11/11/20110 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
11/11/20110 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
11/2/20110 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
110924
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $710,000 for a total estimated cost of these projects being $9,788,340.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $660,000 with the total cost estimated to be $9,788,340.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

3rd and 6th Aldermanic Districts

Pleasant Street Lift Bridge over the Milwaukee River (BR100070104): Engineering for major movable bridge rehabilitation. (City Share Non-assessable Structure Fund -- $600,000, Additional Funds). The total estimated cost for this project including the requested amount is $7,700,000. This project is anticipated to be completed during the 2012-2013 construction season.

4th Aldermanic District

N. 35th St. at W. Juneau Av. (ST211110186): Replace concrete curb and gutter and sidewalk as necessary. (Non-assessable Reconstruction Paving Fund -- $50,000). The total estimated cost of this project including the request is $50,000. This project is anticipated to be completed during the 2011 construction season.

10th Aldermanic District

North 45th Street Bridge over the Menomonee River (BR320062201) (ST320062201): Consultant Design Services for right-of-way plat preparation, hazardous material assessment, and environmental documentation. (City Share Non-assessable Paving Fund -- $25,000, Additional Funds). The total estimated cost for this...

Click here for full text