File #: 110831    Version:
Type: Resolution Status: Passed
File created: 10/11/2011 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 11/2/2011
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $383,000 for a total estimated cost of these projects being $4,431,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, STREET IMPROVEMENTS
Attachments: 1. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
11/7/20111 MAYOR SIGNED   Action details Meeting details Not available
11/2/20111 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
10/19/20111 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
10/19/20110 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Individual appearing: Clark Wantoch, DPW-Infrastructure Services Mary Dziewiontkoski, DPW-Infrastructure Services Proposed Substitute A is accepted.
Pass5:0 Action details Meeting details Not available
10/19/20111 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass5:0 Action details Meeting details Not available
10/17/20110 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
10/17/20110 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
10/17/20110 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
10/17/20110 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
10/11/20110 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

110831

Version

Substitute 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $383,000 for a total estimated cost of these projects being $4,431,000.

Analysis

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $383,000 with the total cost estimated to be $4,431,000.

Body

Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

1st Aldermanic District

 

N. 37th St. - W. Florist Ave. to W. Douglas Ave. (ST211130123):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $235,000.  This project is anticipated to be completed during the 2013 construction season.

 

N. 38th St. - W. Florist Ave. to W. Douglas Ave. (ST211130124):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $245,000.  This project is anticipated to be completed during the 2013 construction season.

 

2nd Aldermanic District

 

W. Hope Ave. - N. 60th St. to N. 62nd St. (ST211110144):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $107,000.  This project is anticipated to be completed during the 2012 construction season.

 

5th Aldermanic District

 

N. 117th St. - W. Carmen Ave. to W. Florist Ave. (ST211120129):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $173,000.  This project is anticipated to be completed during the 2012 construction season.

 

N. 122nd St. - W. Florist Ave. to W. Lynx Ave. (ST211110146):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $50,000, Additional Funds).  The total estimated cost for this project including the requested amount is $300,000.  This project is anticipated to be completed during the 2011 construction season.

 

8th Aldermanic District

 

W. Scott St. - S. Layton Blvd. to S. 35th St. (ST211130122):  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $50,000).  The total estimated cost for this project including the requested amount is $700,000.  This project is anticipated to be completed during the 2013 construction season.

 

S. 26th St. - W. Scott St. to W. Pierce St. (ST211130125):  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $36,000).  The total estimated cost for this project including the requested amount is $500,000.  This project is anticipated to be completed during the 2013 construction season.

 

9th Aldermanic District

 

W. Calumet Rd. - N. 51st Blvd. to N. 60th St. (ST21100156):  Paving the roadway with asphalt.  Rural cross section.  Replace driveways as necessary.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $50,000, Additional Funds).  The total estimated cost for this project including the requested amount is $305,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. 70th St. - W. Brown Deer Rd. to W. Glenbrook Dr. (ST211130110):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $45,000).  The total estimated cost for this project including the requested amount is $650,000.  This project is anticipated to be completed during the 2013 construction season.

 

11th Aldermanic District

 

W. Wedgewood Dr. - S. Honey Creek Dr. to S. 76th St. (Including W. Wedgewood Ct.) (ST211120136):  (Nonassessable Reconstruction Paving Fund -- $20,000, Additional Funds).  The total estimated cost for this project including the requested amount is $358,000.  This project is anticipated to be completed during the 2012 construction season.

 

12th Aldermanic District

 

S. Pearl St. - W. Mitchell St. to S. Cesar E. Chavez Dr. (Including W. Bow St. - S. Cesar E. Chavez Dr. to S. Pearl St.) (ST211130127):  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $35,000).  The total estimated cost for this project including the requested amount is $450,000.  This project is anticipated to be completed during the 2013 construction season.

 

S. 18th St. - W. Burnham St. to S. Pearl St. (ST211130128):  Laying a concrete curb and gutter.  (Nonassessable Reconstruction Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2013 construction season.

 

13th Aldermanic District

 

W. Zellman Ct. - S. 13th St. to a point 550 feet m/l west of S. 13th St. (ST211130113):  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2013 construction season.

 

14th Aldermanic District

 

S. Clement Ave. - E. Russell Ave. to E. Otjen St. (ST211130126):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $12,000).  The total estimated cost for this project including the requested amount is $158,000.  This project is anticipated to be completed during the 2013 construction season.

 

; and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

MLD:dr

Apr 3

10/14/2011

Technical Correction 10-17-2011/dr