powered help
header-left header-center header-right
File #: 110690    Version:
Type: Resolution Status: Passed
File created: 9/20/2011 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 10/11/2011
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $68,000 for a total estimated cost of these projects being $674,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, WATER MAINS
Attachments: 1. Hearing Notice List

Number

110690

Version

Substitute 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $68,000 for a total estimated cost of these projects being $674,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $68,000 with the total cost estimated to be $674,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

5th Aldermanic District

 

W. Townsend St. - N. 76th St. to N. 82nd St. (SM495110540):  Sewer work prior to paving.  (Nonassessable Sewer Maintenance Relay Fund -- $17,300, Additional Funds).  The total estimated cost for this project including the requested amount is $37,300.  This project is anticipated to be completed during the 2011 construction season.

 

10th Aldermanic District

 

S. 60th St. - W. Dickinson St. to W. Main St. (SM495110528):  Sewer work prior to paving.  (Nonassessable Sewer Maintenance Relay Fund -- $3,000, Additional Funds).  The total estimated cost for this project including the requested amount is $20,000.  This project is anticipated to be completed during the 2011 construction season.

 

11th Aldermanic District

 

W. Wedgewood Dr. - S. Sunset Dr. to S. Massachusetts Ave. (WT410120001):  Relay water main.  (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $280,000.  This project is anticipated to be completed during the 2012 construction season.

 

12th Aldermanic District

 

E. Washington St. - S. Water St. to S. 1st St. (WT410120002):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2012 construction season.

 

15th Aldermanic District

 

W. North Ave. - N. 8th St. to N. 9th St. (SM495110537):  Sewer work prior to paving.  (Nonassessable Sewer Maintenance Relay Fund -- $11,700, Additional Funds).  The total estimated cost for this project including the requested amount is $21,700.  This project is anticipated to be completed during the 2011 construction season.

 

Various Locations

 

Bridge Safety Inspection (BR100090102):  (City Share Nonassessable Structure Fund -- $1,000, Additional Funds).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2011 construction season.

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

MLD:dr

Npr 2

09/22/2011