7/25/2011 | 0 |
HISTORIC PRESERVATION COMMISSION
| ADOPTED
Minutes note: Mr. Jakubovich gave a PowerPoint presentation (Exhibit 1) and spoke about the proposed performance stage structure. The proposal was modified from a year ago. It would be a new stage that is small in scale with wood columns, roof, and concrete steps in the park. It would not be visible to houses on Lake Dr. Mr. Jakubovich added that the new stage was a good fit that would replace an existing stage.
Individuals appearing in support:
Kevin Haley, Milwaukee County Parks Department, 9480 Watertown Plank Rd., Wauwatosa, WI 53226
Sandra Wiegand, Lake Park Friends, 2824 N. Farwell Ave., Milwaukee, WI 53211
Mr. Haley said the new stage would serve performance events, gatherings, and picnics.
Ms. Wiegand submitted pictures, a program of events, and stage information. (Exhibit 2) She said the structure would be made from high quality wood material, have hidden fasteners, and consist of metal or asphalt roofing.
Mr. Jarosz moved approval of a certificate of appropriateness for construction of a Lake Park performance structure and for the applicant to submit details depicting the connection of the columns to concrete and roof material to staff at the Historic Preservation Commission. Seconded by Ms. Ackerman. There were no objections. | Pass | 4:0 |
Action details
|
Meeting details
|
Not available
|