File #: 101541    Version:
Type: Resolution Status: Passed
File created: 4/12/2011 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 5/3/2011
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $175,000 for a total estimated cost of these projects being $1,835,000.
Sponsors: THE CHAIR
Indexes: STREET IMPROVEMENTS
Attachments: 1. Hearing Notice List

Number

101541

Version

Substitute 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $175,000 for a total estimated cost of these projects being $1,835,000.

Analysis

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $175,000 with the total cost estimated to be $1,835,000.

Body

Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

8th Aldermanic District

 

Area bounded by W. Greenfield Ave., W. Burnham St., S. 35th St., and West City Limits (ST230060128):  Remove and replace concrete walk.  (Nonassessable Sidewalk Funds -- $60,000, Additional Funds).  The total estimated cost for this project including the requested amount is $305,000.  This work is completed.

 

S. 50th St. - W. Oklahoma Ave. to W. Cleveland Ave. (ST211110106):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $365,000.  This project is anticipated to be completed during the 2012 construction season.

 

9th Aldermanic District

 

Area bounded by W. Bradley Rd., W. Brown Deer Rd., N. 91st St., and N. 107th St. (ST230060127):  Remove and replace concrete walk.  (Nonassessable Sidewalk Funds -- $35,000, Additional Funds).  The total estimated cost for this project including the requested amount is $235,000.  This work is completed.

 

N. Joseph Ave. - W. Tower Ave. to N. Pingree Ave. (ST211130105):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2013 construction season.

 

N. Servite Dr. - W. Dean Rd. to a point north of W. Donna Ct. (Including W. Dean Rd.) (ST211130106):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $21,000).  The total estimated cost for this project including the requested amount is $300,000.  This project is anticipated to be completed during the 2013 construction season.

 

W. Tower Ave. - W. Terra Ave. to N. 105th St. (ST211130108):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2013 construction season.

 

W. Tower Ave. - N. 87th St. to N. Faulkner Rd. (ST211130107):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $135,000.  This project is anticipated to be completed during the 2013 construction season.

 

N. 105th St. - W. Bradley Rd. to W. Sylvia St. (ST211130104):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2013 construction season.

 

10th Aldermanic District

 

Alley between W. Auer Ave., W. Concordia Ave., N. 53rd St., and N. 54th St. (ST212110107):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $9,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2011-2012 construction season.

 

; and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 