File #: 100633    Version: 0
Type: Resolution Status: Passed
File created: 10/12/2010 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 11/3/2010
Effective date:    
Title: Resolution authorizing the Commissioner of Public Works to execute an agreement with the Wisconsin Department of Transportation for the programming and installation of fiber optic interconnect along STH 100 (Brown Deer Corridor) between USH 45 and North Green Bay Road (STH 57), with the portion from North 124th Street to North 68th Street located within the City of Milwaukee, and STH 181 (North 76th Street Corridor) between West Florist Avenue and West County Line Road and to set up plan review costs, with Federal/State aid under the State Trunk Highway Program, with an estimated cost of $10,000 for plan review, 100% City funded.
Sponsors: THE CHAIR
Indexes: AGREEMENTS, STREET IMPROVEMENTS, WISCONSIN DEPARTMENT OF TRANSPORTATION
Attachments: 1. Cover Letter, 2. Agreement, 3. Comptroller's Certificate, 4. Hearing Notice List
Number
100633
Version
ORIGINAL
Reference
Sponsor
THE CHAIR
Title
Resolution authorizing the Commissioner of Public Works to execute an agreement with the Wisconsin Department of Transportation for the programming and installation of fiber optic interconnect along STH 100 (Brown Deer Corridor) between USH 45 and North Green Bay Road (STH 57), with the portion from North 124th Street to North 68th Street located within the City of Milwaukee, and STH 181 (North 76th Street Corridor) between West Florist Avenue and West County Line Road and to set up plan review costs, with Federal/State aid under the State Trunk Highway Program, with an estimated cost of $10,000 for plan review, 100% City funded.
Analysis
This resolution directs the Commissioner of Public Works to execute a project agreement with the Wisconsin Department of Transportation for programming and installation of fiber optic interconnect along STH 100 (Brown Deer Corridor) between USH 45 and North Green Bay Road (STH 57), with the portion from North 124th Street and North 68th Street located within the City of Milwaukee and STH 181 (North 76th Street Corridor) between West Florist Avenue and West County Line Road, under the State Trunk Highway Program.  Approval of the agreement with the WisDOT will enable the project to be undertaken using 100 percent Federal/State aid for preliminary engineering and construction costs.  The estimated total cost of the project is $2,563,750 of which the City of Milwaukee's construction share for non-participating items is estimated to be $25,000 and the grantor share is $2,538,750.  Approval for construction costs will be in a future resolution.  City of Milwaukee costs for plan review, which will be funded 100 percent by the City of Milwaukee, are estimated to be $10,000.
Body
Whereas STH 100 (Brown Deer Corridor) between USH 45 and North Green Bay Road (STH 57), with the portion from North 124th Street and North 68th Street located within the City of Milwaukee and STH 181 (North 76th Street Corridor) between West Florist Avenue and West County Line Road, is scheduled for improvement in 2011 as part of the Wisconsin Department of Transportation's (WisDOT) State Trunk Highway Program; and
 
Whereas, The WisDOT will undertake the necessary preliminary engineering and plan preparation for the improvement; and
 
Whereas, The WisDOT has submitted an agreement to the City of Milwaukee for the programming and construction of the project with Federal/State aid under the State Trunk Highway Program; and
 
Whereas, Approval of the agreement by the WisDOT will enable the project to be undertaken with 100 percent Federal/State aid for preliminary engineering and construction costs, the City's share of the construction cost is related to items such as water and sanitary sewer adjustments being non-participating and funded 100 percent by the City of Milwaukee; and
 
Whereas, The state cannot proceed with any project cost overruns and/or changes in scope of more than five percent without prior Department of Public Works (DPW) approval; and
 
Whereas, The DPW shall notify the Common Council of the City of Milwaukee at the next scheduled meeting of any such project cost overruns and/or changes in scope approved by DPW; and
 
Whereas, The Common Council of the City of Milwaukee recognizes that the City may be 100 percent liable for any such project cost overruns and/or changes in scope as approved by the DPW; and
 
Whereas, The Common Council of the City of Milwaukee recognizes that the City may be liable for any cost incurred by the State should the City decide to withdraw from the project; now, therefore, be it
 
Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works (CPW) is hereby authorized to execute the agreement for programming and installation of fiber optic interconnect along STH 100 (Brown Deer Corridor) between USH 45 and North Green Bay Road, with the portion from North 124th Street and North 63rd Street located within the City of Milwaukee and STH 181 (North 76th Street Corridor) between West Florist Avenue and West County Line Road, with Federal/State aid under the State Trunk Highway Improvement Program, a copy of which is attached to Common Council File No.  100633 and is incorporated in this resolution by reference as though set forth in full; and, be it
 
Further Resolved, By the Common Council of the City of Milwaukee that the Comptroller is hereby authorized to create within the Capital Improvement Fund, Grant and Aid Projects the necessary Project/Grant Chartfield Values for the plan review (State I.D. 1693-49-00) and transfer to this account the amount required under the grant agreement and City Accounting Policy but not to exceed a 10 percent increase of the total amounts reserved for grantor's share and local share of $25,000, which ever is greater as follows:
 
Infrastructure Services Division Accounts
 
Project I.D. 1693-49-00
City Share
Account No. ST320100000
Fund 0333
$10,000
 
Previously authorized for preliminary engineering -0-
 
Current estimated costs of the total project (including current resolution) $2,536,750
 
Original estimated costs of the total project $2,563,750
 
; and, be it
 
Further Resolved, That the City Engineer is hereby authorized to approve and make periodic payments to the WisDOT upon receipt of invoices for the City's share of the costs for the above project.
Requestor
Department of Public Works
Drafter
Infrastructure Services Division
LCG:amh
September 20, 2010
Reso STH (Brwn Dee Corrdr) I-43 - N 124th 091610.rtf