powered help
header-left header-center header-right
File #: 100721    Version:
Type: Resolution Status: Passed
File created: 10/12/2010 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 11/3/2010
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $95,000 for a total estimated cost of these projects being $1,220,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, STREET IMPROVEMENTS
Attachments: 1. Fiscal Impact Statement, 2. Hearing Notice List

Number

100721

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $95,000 for a total estimated cost of these projects being $1,220,000.

Analysis

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $95,000 with the total cost estimated to be $1,220,000.

Body

Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

1st Aldermanic District

 

W. Lawn Ave. - N. 13th St. to N. Green Bay Ave. (ST211090114):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $55,000, Additional Funds).  The total estimated cost for this project including the requested amount is $450,000.  This project is anticipated to be completed during the 2010 construction season.

 

3rd Aldermanic District

 

N. Marietta Ave. - E. Locust St. to E. Kenwood Blvd. (ST211020144):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $287,000.  This project is anticipated to be completed during the 2011 construction season.

 

8th Aldermanic District

 

W. Lapham St. - S. Layton Blvd. to S. 29th St. (ST211110132):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2011 construction season.

 

11th Aldermanic District

 

W. Tripoli Ave. - S. 78th St. to S. 80th St. (ST211120157):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $16,000).  The total estimated cost for this project including the requested amount is $199,000.  This project is anticipated to be completed during the 2012 construction season.

 

13th Aldermanic District

 

W. Euclid Ave. - S. 16th St. to S. 20th St. (ST211110129):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $135,000.  This project is anticipated to be completed during the 2011 construction season.

 

14th Aldermanic District

 

S. 15th Pl. - A point south of W. Cleveland Ave. to W. Cleveland Ave. (ST211110156):  Install traffic calming devices.  (Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $8,000.  This project is anticipated to be completed during the 2011 construction season.

 

15th Aldermanic District

 

N. 15th St. - W. Lloyd St. to W. North Ave. (ST211110153):  Install traffic calming devices.  (Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $16,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. 37th St. - W. State St. to W. Highland Blvd. (ST211120158):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $7,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2012 construction season.

 

; and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

MLD:dr

Apr 3

10/05/2010