powered help
header-left header-center header-right
File #: 100311    Version:
Type: Resolution Status: Passed
File created: 7/7/2010 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 7/27/2010
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $30,000 for a total estimated cost of these projects being $464,500.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Cover Letter, 2. Fiscal Note, 3. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
8/5/20101 MAYOR SIGNED   Action details Meeting details Not available
7/27/20101 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
7/14/20101 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Individual present: Clark Wantoch, Department of Public Works-Infrastructure Services
Pass5:0 Action details Meeting details Not available
7/12/20100 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
7/12/20100 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
7/9/20101 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
7/7/20100 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number
100311
Version
SUBSTITUTE 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $30,000 for a total estimated cost of these projects being $464,500.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $30,000 with the total cost estimated to be $464,500.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

6th Aldermanic District

N. Fratney St. (Elimination of Railroad Crossing) - A point north of E. Nash St. (ST211100159): Paving the roadway with concrete. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $10,000). The total estimated cost for this project including the requested amount is $64,500. This project is anticipated to be completed during the 2010 construction season.

City of Greenfield

W. Leroy Ave. - S. 61st St. to 165 feet east of S. 68th St. (WT410101018): Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000). The total estimated cost for this project including the requested amount is $400,000. This project is anticipated to be completed during the 2011 construction season.

;and, be it

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

Further Resolved...

Click here for full text