Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $237,000 for a total estimated cost of these projects being $4,676,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Cover Letter, 2. Fiscal note, 3. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
6/1/20101 MAYOR SIGNED   Action details Meeting details Not available
5/25/20101 COMMON COUNCIL ADOPTEDPass14:0 Action details Meeting details Not available
5/12/20101 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Individual present: Mary Dziewiontkowski , Dept. of Public Works, Infrastructure Services
Pass4:0 Action details Meeting details Not available
5/7/20101 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
5/7/20100 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
5/4/20100 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

100011

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $237,000 for a total estimated cost of these projects being $4,676,000.

Analysis

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $237,000 with the total cost estimated to be $4,676,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

2nd Aldermanic District

 

W. Perkins Pl. - W. Beckett Ave. to W. Appleton Ave. (ST211100119):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2010 construction season.

 

4th Aldermanic District

 

E. Erie St. - A point 600 feet west of N. Jackson St. to N. Jackson St. (ST211080128):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Assessable Reconstruction Paving Fund -- $55,000, Additional Funds).  The total estimated cost for this project including the requested amount is $537,000.  This project is anticipated to be completed during the 2010 construction season.

 

5th Aldermanic District

 

W. Bobolink Ave. - W. Appleton Ave. to N. Lovers Lane Rd. (ST211060140):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $208,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Townsend St. - N. 84th St. to N. 86th St. (ST211060149):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $143,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. 119th St. - W. Hampton Ave. to a point 1,700 feet m/l north of W. Hampton Ave. (ST211080113):  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $405,000.  This project is anticipated to be completed during the 2010 construction season.

 

6th Aldermanic District

 

E./W. Wright St. - N. Palmer St. to N. 2nd St. (ST211100146):  Install traffic calming speed hump(s).  (Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $5,000.  This project is anticipated to be completed during the 2010 construction season.

 

8th Aldermanic District

 

S. 31st St. - W. Cleveland Ave. to a point 40 feet m/l south of W. Forest Home Ave. (ST21100109):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $188,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 37th St. - W. Mitchell St. to W. Lapham St. (ST211070144):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2011 construction season.

 

11th Aldermanic District

 

S. 63rd St. - W. Eden Pl. to W. Morgan Ave. (ST211100102):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 82nd St. - W. Wilbur Ave. to W. Morgan Ave. (ST211060101):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $199,000.  This project is anticipated to be completed during the 2011 construction season.

 

12th Aldermanic District

 

S. 10th St. - W. Greenfield Ave. to W. Washington St. (ST211060117):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $239,000.  This project is anticipated to be completed during the 2010 construction season.

 

14th Aldermanic District

 

S. Carferry Dr. - E. Lincoln Ave. to a point 500 feet north of E. Lincoln Ave. (ST211120144):  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $40,000).  The total estimated cost for this project including the requested amount is $1,085,000.  This project is anticipated to be completed during the 2012 construction season.

 

S. Lincoln Memorial Dr. - E. Lincoln Ave. to a point 4,300 feet m/l north of E. Lincoln Ave. (ST211110147):  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $40,000).  The total estimated cost for this project including the requested amount is $968,000.  This project is anticipated to be completed during the 2011 construction season.

 

E. Warnimont Ave. - S. Brust Ave. to S. Clement Ave. (ST211100113):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $215,000.  This project is anticipated to be completed during the 2010 construction season.

 

15th Aldermanic District

 

N. 37th St. - W. Meinecke Ave. to W. Clarke St. (ST211050113):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $195,000.  This project is anticipated to be completed during the 2011 construction season.

 

Alley between W. Garfield Ave., W. Lloyd St., N. 37th St., and N. 38th St. (ST21210113):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $79,000.  This project is anticipated to be completed during the 2011 construction season.

 

; and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

MLD:dr

Apr 12

05/07/10