File #: 231828    Version:
Type: Resolution Status: Passed
File created: 3/19/2024 In control: COMMON COUNCIL
On agenda: Final action: 4/9/2024
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,824,000 for a total estimated cost of these projects being $15,617,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS

Number

231828

Version

Substitute 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,824,000 for a total estimated cost of these projects being $15,617,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $1,824,000 with the total cost estimated to be $15,617,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

1st Aldermanic District

 

W. Villard Ave. (North Side) - N. Hopkins St. to N. Sherman Blvd. (WT410250626) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $270,000. This project is anticipated to be completed during the 2025 construction season.

 

2nd Aldermanic District

 

N. 76th St. - W. Bobolink Pl. to 120’ North of W. Florist Ave. (WT410250601) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $160,000. This project is anticipated to be completed during the 2025 construction season.

 

W. Florist Ave. - N. 76th St. to N. 77th St. (WT410250602) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $115,000. This project is anticipated to be completed during the 2025 construction season.

 

5th Aldermanic District

 

N. 90th St. - W. Locust St. to W. Burleigh St. (WT410250618) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $34,000). The total estimated cost of this project including the requested amount is $450,000. This project is anticipated to be completed during the 2025 construction season.

 

N. 91st St. - W. Locust St. to W. Burleigh St. (WT410250619) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $34,000). The total estimated cost of this project including the requested amount is $450,000. This project is anticipated to be completed during the 2025 construction season.

 

N. 92nd St. - W. Chambers St. to W. Burleigh St. (WT410250620) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $250,000. This project is anticipated to be completed during the 2025 construction season.

 

W. Chambers St. - N. 88th St. to N. 92nd St. (WT410250622) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $34,000). The total estimated cost of this project including the requested amount is $475,000. This project is anticipated to be completed during the 2025 construction season.

 

W. Locust St. - N. 89th St. (East Line) to N. 92nd St. (WT410250621) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $29,000). The total estimated cost of this project including the requested amount is $365,000. This project is anticipated to be completed during the 2025 construction season.

 

W. Lorraine Pl. - N. 82nd St. to N. 84th St. (WT410250623) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $240,000. This project is anticipated to be completed during the 2025 construction season.

 

5th and 10th Aldermanic Districts

 

W. Lisbon Ave. - N. 100th St. to W. Burleigh St. (SM499240025) Installing bioswales. (Nonassessable Water Quality Fund -- $50,000). The total estimated cost of this project is $250,000. This project is anticipated to be completed during the 2024 construction season.

 

6th Aldermanic District

 

N. 11th St. - W. Brown St. to W. Lloyd St. (WT410250607) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $170,000. This project is anticipated to be completed during the 2025 construction season.

 

N. 12th St. - 200’ South of W. Walnut St. to W. Lloyd St. (WT410250605) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $49,000). The total estimated cost of this project including the requested amount is $775,000. This project is anticipated to be completed during the 2025 construction season.

 

N. 25th St. - W. Keefe Ave. to W. Vienna Ave. (WT410250609) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $34,000). The total estimated cost of this project including the requested amount is $475,000. This project is anticipated to be completed during the 2025 construction season.

 

W. Brown St. - N. 11th St. to N. 13th St. (WT410250606) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $260,000. This project is anticipated to be completed during the 2025 construction season.

 

E. Burleigh St. - N. Achilles St. to N. Palmer St. (WT410250604) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $120,000. This project is anticipated to be completed during the 2025 construction season.

 

W. Nash St. - N. 25th St. to N. 26th St. (WT410250610) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $90,000. This project is anticipated to be completed during the 2025 construction season.

 

7th Aldermanic District

 

N. 48th St. - W. Marion St. to W. Congress St. (WT410250613) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $240,000. This project is anticipated to be completed during the 2025 construction season.

 

W. Chambers St. - N. 28th St. to 130’ +/- West of N. 30th St. (SM495240018) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $239,000. This project is anticipated to be completed during the 2024 construction season.

 

N. Sherman Blvd. - W. Burleigh St. to W. Capitol Dr. (SM499240024) Installing bioswales. (Nonassessable Water Quality Fund -- $50,000). The total estimated cost of this project is $250,000. This project is anticipated to be completed during the 2024 construction season.

 

7th and 15th Aldermanic Districts

 

N. Sherman Blvd. - W. North Ave. to W. Burleigh St. (SM499240023) Installing bioswales. (Nonassessable Water Quality Fund -- $50,000). The total estimated cost of this project is $250,000. This project is anticipated to be completed during the 2024 construction season.

 

10th Aldermanic District

 

N. 51st St. - W. Vliet St. to W. Washington Blvd. (SM495240012) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $20,000). The total estimated cost of this project including the requested amount is $508,000. This project is anticipated to be completed during the 2024 construction season.

 

N. 51st St. - W. Washington Blvd. to W. Vine St. (SM495240019) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $247,000. This project is anticipated to be completed during the 2024 construction season.

 

N. 52nd St. - W. Washington Blvd. to W. Lloyd St. (SM495240010) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $20,000). The total estimated cost of this project including the requested amount is $461,000. This project is anticipated to be completed during the 2024 construction season.

 

N. 53rd St. - W. Washington Blvd. to W. Vine St. (SM495240011) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $245,000. This project is anticipated to be completed during the 2024 construction season.

 

W. Michigan Ave. - N. 35th St. to N. 36th St. (SM499240021) Installing bioswales. (Nonassessable Water Quality Fund -- $30,000). The total estimated cost of this project is $250,000. This project is anticipated to be completed during the 2024 construction season.

 

Retaining Wall Replacement (4600 West State Street) (BR100240108): Preliminary engineering for replacement of wall along Menomonee River. (City Share Non-assessable Structure Fund - $500,000 Additional Funds).  The total estimated cost for this project is $600,000. This project is anticipated to be completed during the 2024 construction season.

 

11th Aldermanic District

 

S. 28th St. - W. Oklahoma Ave. to W. Euclid Ave. (SM495240023) Relaying storm sewer. Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $20,000). The total estimated cost of this project including the requested amount is $360,000. This project is anticipated to be completed during the 2024 construction season.

 

S. 29th St. - W. Oklahoma Ave. to 120’ South of W. Euclid Ave. (SM495240020) Relaying storm sewer. Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $20,000). The total estimated cost of this project including the requested amount is $427,000. This project is anticipated to be completed during the 2024 construction season.

 

S. 49th St. - W. Montana St. to W. Oklahoma Ave. (WT410250611) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $49,000). The total estimated cost of this project including the requested amount is $700,000. This project is anticipated to be completed during the 2025 construction season.

 

S. 89th St. - 500’ North of W. Burdick Ave. to W. Burdick Ave. (WT410250616) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $185,000. This project is anticipated to be completed during the 2025 construction season.

 

S. 91st St. - 525’ North of W. Burdick Ave. to W. Burdick Ave. (WT410250615) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $185,000. This project is anticipated to be completed during the 2025 construction season.

 

W. Beloit Rd. - W. Oklahoma Ave. to S. 92nd St. (WT410250614) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $29,000). The total estimated cost of this project including the requested amount is $350,000. This project is anticipated to be completed during the 2025 construction season.

 

W. Euclid Ave. - S. 27th St. to S. 31st St. (SM495240026) Relaying storm sewer. Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $20,000). The total estimated cost of this project including the requested amount is $383,000. This project is anticipated to be completed during the 2024 construction season.

 

W. Holt Ave. - S. 91st St. to S. 92nd St. (WT410250617) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $155,000. This project is anticipated to be completed during the 2025 construction season.

 

W. Oklahoma Ave. - S. 27th St. to S. 31st St. (SM495240024) Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost of this project including the requested amount is $90,000. This project is anticipated to be completed during the 2024 construction season.

 

12th Aldermanic District

 

W. Becher St. - S. 5th Pl. to S. 8th St. (WT410250629) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $29,000). The total estimated cost of this project including the requested amount is $335,000. This project is anticipated to be completed during the 2025 construction season.

 

W. Pierce St. - S. 4th St. to S. 9th St. (WT410250608) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $44,000). The total estimated cost of this project including the requested amount is $655,000. This project is anticipated to be completed during the 2025 construction season.

 

13th Aldermanic District

 

S. 18th St. - 640’ North of W. Wilbur Ave. (Pedestrian Way) to W. Wilbur Ave. (WT410250612) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $225,000. This project is anticipated to be completed during the 2025 construction season.

 

S. 20th St. - 300’ South of W. Kinnickinnic River Pkwy. To W. Oklahoma Ave. (SM495240022) Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $102,000. This project is anticipated to be completed during the 2024 construction season.

 

S. 24th St. - W. Euclid Ave. to W. Ohio Ave. (SM495240025) Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $158,000. This project is anticipated to be completed during the 2024 construction season.

 

S. Logan Ave. - E. Whitaker Ct. to E. Layton Ave. (SM499240022) Installing bioswales. (Nonassessable Water Quality Fund -- $10,000). The total estimated cost of this project is $100,000. This project is anticipated to be completed during the 2024 construction season.

 

W. Oklahoma Ave. - S. 20th St. to S. 22nd St. (SM495240021) Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost of this project including the requested amount is $72,000. This project is anticipated to be completed during the 2024 construction season.

 

14th Aldermanic District

 

S. Ellen St. - S. Kinnickinnic Ave. to E. Rusk Ave. (SM495240016) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $246,000. This project is anticipated to be completed during the 2024 construction season.

 

E. Rusk Ave. - 40’ +/- West of S. Linebarger Ter. To S. Ellen St. (SM495240017) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $159,000. This project is anticipated to be completed during the 2024 construction season.

 

15th Aldermanic District

 

N. 21st St. - W. Vine St. to W. North Ave. (WT410250627) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $49,000). The total estimated cost of this project including the requested amount is $700,000. This project is anticipated to be completed during the 2025 construction season.

 

N. 30th St. - W. Brown St. to W. Lloyd St. (North Line) (WT410250624) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $205,000. This project is anticipated to be completed during the 2025 construction season.

 

N. 30th St. - W. Wright St. to W. Clarke St. (WT410250625) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $240,000. This project is anticipated to be completed during the 2025 construction season.

 

W. North Ave. (North Side) - N. Teutonia Ave. to N. 18th St. (WT410250628) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $49,000). The total estimated cost of this project including the requested amount is $790,000. This project is anticipated to be completed during the 2025 construction season.

 

City of St. Francis

 

S. Brook Pl. - E. Elizabeth Ave. to E. Crawford Ave. (WT410250632) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $100,000. This project is anticipated to be completed during the 2025 construction season.

 

E. Elizabeth Ave. - S. Kinnickinnic Ave. to S. Brook Pl. (WT410250631) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $215,000. This project is anticipated to be completed during the 2025 construction season.

 

E. Koenig Ave. - S. Vermont Ave. to S. Barland Ave. (WT410250630) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $275,000. This project is anticipated to be completed during the 2025 construction season.

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Holly Rutenbeck

NPR 10 Sub

3/22/2024