powered help
header-left header-center header-right
File #: 231826    Version: 0
Type: Resolution Status: Passed
File created: 3/19/2024 In control: COMMON COUNCIL
On agenda: Final action: 4/9/2024
Effective date:    
Title: Resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $4,015 for a total estimated cost of these projects being $305,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Number
231826
Version
ORIGINAL
Sponsor
THE CHAIR
Title
Resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $4,015 for a total estimated cost of these projects being $305,000.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction. The City cost for engineering these projects is estimated to be $4,015 with the total cost estimated to be $305,000.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

10th Aldermanic District

N. 60th St. - W. McKinley to W. Vliet St. (Sponsored by the City of Wauwatosa) (ST211190106) File Number 201137: Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (8’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $2,900 additional funding). The total estimated cost of this project including the requested amount is $200,000. These funds are to close out the contract.

N. 60th St. - W. Wells St. to W. Valley Forge Dr. (Sponsored by the City of Wauwatosa) (ST211190101) File Number 201137: Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approac...

Click here for full text