File #: 091623    Version:
Type: Resolution Status: Passed
File created: 4/13/2010 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 5/4/2010
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,485,000 for a total estimated cost of these projects being $13,800,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Fiscal Note, 2. Cover Letter, 3. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
5/10/20101 MAYOR SIGNED   Action details Meeting details Not available
5/4/20101 COMMON COUNCIL ADOPTEDPass13:0 Action details Meeting details Not available
4/21/20101 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Individual present: Clark Wantoch, Dept. of Public Works, Infrastructure Services
Pass5:0 Action details Meeting details Not available
4/16/20101 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
4/15/20100 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
4/13/20100 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

091623

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,485,000 for a total estimated cost of these projects being $13,800,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $1,485,000 with the total cost estimated to be $13,800,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

1st Aldermanic District

 

W. Birch Ave. - N. Milwaukee River Pkwy. to N. 11th St. (WT410110638):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Custer Ave. - N. 27th St. to 300 feet west of N. 27th St. (WT410110647):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. Milwaukee River Pkwy. - 900 feet south of W. Lawn Ave. to 730 feet south of W. Lawn Ave. (WT410110639):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $30,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Oriole Dr. - N. 33rd St. to N. 35th St. (WT410110623):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Rochelle Ave. - N. 37th St. to N. 38th St. (WT410110640):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Silver Spring Dr. - N. 27th St. to 600 feet west of N. 27th St. (WT410110622):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. 28th St. - 400 feet north of W. Villard Ave. to 900 feet north of W. Villard Ave. (WT410110648):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. 29th St. - 675 feet north of W. Villard Ave. to 900 feet north of W. Villard Ave. (WT410110649):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $40,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. 37th St. - W. Kiley Ave. to N. 38th St. (WT410110641):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $190,000.  This project is anticipated to be completed during the 2011 construction season.

 

2nd Aldermanic District

 

W. Bender Ave. - N. 80th St. to 660 feet west of N. 80th St. (WT410110655):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. 80th St. - W. Bender Ave. to W. Winfield Ave. (WT410110654):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2011 construction season.

 

3rd Aldermanic District

 

E. Hartford Ave. - N. Shepard Ave. to N. Marietta Ave. (WT410110642):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $65,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. Shepard Ave. - E. Hartford Ave. to E. Newport Ave. (WT410110643):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $135,000.  This project is anticipated to be completed during the 2011 construction season.

 

5th Aldermanic District

 

W. Appleton Ave. - W. Glendale Ave. to W. Derby Pl. (WT410110002):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $12,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $310,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Appleton Ave. - W. Hope Ave. to W. Congress St. (WT410110001):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $15,000; Nonassessable Water Fund Budget Line 6410 -- $15,000).  The total estimated cost for this project including the requested amount is $460,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Auer Ave. - N. 84th St. to N. 85th St. (WT410110006):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Fiebrantz Ave. - N. 79th St. to N. 80th St. (WT410110613):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $180,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Grantosa Ct. - N. 100th St. to W. Fiebrantz Ave. (WT410110663):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Hampton Ave. - W. Beckett Ave. to N. 84th St. (WT410110003):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. 80th St. - W. Fiebrantz Ave. to W. Hope Ave. (WT410110614):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $180,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. 81st St. - W. Fiebrantz Ave. to W. Hope Ave. (WT410110615):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $120,000.  This project is anticipated to be completed during the 2011 construction season.

 

6th Aldermanic District

 

N. Booth St. - E. Lloyd St. to E. Garfield Ave. (WT410110617):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2011 construction season.

 

Easement WE232 - E. Nash St. and N. Palmer St. to N. Hubbard St. north of E. Keefe Ave. (WT410110616):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $20,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. 10th St. at W. Ring St. (WT410110629):  Water main alteration.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $20,000.  This project is anticipated to be completed during the 2011 construction season.

 

7th Aldermanic District

 

W. Chambers St. - N. 24th Pl. to N. 25th St. (WT410110650):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Locust St. - N. 20th St. to N. 24th St. (WT410110651):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $280,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Locust St. - N. 24th Pl. to N. 25th St. (WT410110652):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2011 construction season.

 

8th Aldermanic District

 

S. Pearl St./S. 21st St. - W. Mitchell St. to W. Rogers St. (WT410110628):  Water main alteration.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $25,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 36th St. - W. Burnham St. to W. Rogers St. (WT410110004):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2011 construction season.

 

9th Aldermanic District

 

W. Bobolink Ave. - N. 60th St. to N. 61st St. (WT410110620):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Brentwood Ave. - N. 80th St. to N. 82nd St. (WT410110627):  Relaying water main. 

(Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $120,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Carmen Ave. - N. 62nd St. to N. 63rd St. (WT410110618):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. 60th St. - W. Silver Spring Dr. to W. Douglas Ave. (WT410110619):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $34,000; Nonassessable Water Fund Budget Line 6410 -- $36,000).  The total estimated cost for this project including the requested amount is $1,280,000.  This project is anticipated to be completed during the 2011 construction season.

 

10th Aldermanic District

 

S. 88th St. - 300 feet south of W. Adler St. to W. Adler St. (WT410101048):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2010 construction season.

 

11th Aldermanic District

 

W. Beloit Rd. (South side) - S. 92nd St. to S. 96th St. (WT410110661):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $12,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $330,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Beloit Rd. (South side) - S. 98th St. to S. 100th St. (WT410110660):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $260,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Fernwood Cr. at W. Honey Creek Dr. (WT410110632):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $210,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Jerelyn Pl. - S. 51st St. to 200 feet west of S. 51st St. (WT410110621):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. Honey Creek Dr. - W. River Bend Dr. to W. Morgan Ave. (WT410110633):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $12,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $340,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Lakefield Dr. - S. 72nd St. to W. Oklahoma Ave. (WT410110635):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Montrose Ave. - W. Sumac Pl. to W. Fillmore Dr. (WT410110624):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. New Jersey Ave. - S. 81st St. to S. 83rd St. (WT410110609):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Ohio Ave. - W. River Bend Dr. to S. 76th St. (WT410110634):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $190,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Tripoli Ave. - S. 77th St. to S. 78th St. (WT410110602):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Tripoli Ave. - S. 85th St. to S. 87th St. (WT410110645):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Warnimont Ave. - S. 77th St. to S. 78th St. (WT410110610):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Wilbur Ave. - S. 76th St. to S. 78th St. (WT410110603):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000.  The total estimated cost for this project including the requested amount is $120,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Wilbur Ave. - S. 79th St. to S. 80th St. (WT410110604):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $65,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Wilbur Ave. - S. 83rd St. to S. 92nd St. (WT410110605):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $20,000; Nonassessable Water Fund Budget Line 6410 -- $20,000).  The total estimated cost for this project including the requested amount is $600,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 69th St. - W. Euclid Ave. to W. Ohio Ave. (WT410110637):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 71st St. - W. Lakefield Dr. to W. Burdick Ave. (WT410110636):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 77th St. - W. Warnimont Ave. to W. Tripoli Ave. (WT410110601):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $12,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $335,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 78th St. - W. Ohio Ave. to W. Verona Ct. (WT410110005):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 81st St. - W. Wilbur Ave. to W. New Jersey Ave. (WT410110606):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 82nd St. - W. Warnimont Ave. to W. Wilbur Ave. (WT410110607):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 83rd St. - W. Warnimont Ave. to W. New Jersey Ave. (WT410110608):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $190,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 85th St. - W. Crawford Ave. to W. Howard Ave. (WT410110644):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $120,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 91st St. - W. Eden Pl. to W. Wilbur Ave. (WT410110646):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $190,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 92nd St. - W. Beloit Rd. to W. Howard Ave. (WT410110701):  Water main extension.  (Nonassessable Water Fund Budget Line 5010 -- $44,000; Nonassessable Water Fund Budget Line 6410 -- $46,000).  The total estimated cost for this project including the requested amount is $1,700,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 97th St. - W. Oklahoma Ave. to W. Beloit Rd. (WT410110662):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $12,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $360,000.  This project is anticipated to be completed during the 2011 construction season.

 

12th Aldermanic District

 

W. Lapham Blvd. - S. 12th St. to S. 15th St. (WT410110630):  Abandon water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 14th St. (vacated) - W. Lapham Blvd. to W. Mitchell St. (WT410110631):  Abandon water main and install hydrant.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $30,000.  This project is anticipated to be completed during the 2011 construction season.

 

13th Aldermanic District

 

W. Green Ave. - S. Marilyn St. to W. Ramsey Ave. (WT410110657):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $240,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Iona Terr. - S. 31st St. to S. Melinda St. (WT410110658):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $180,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Mangold Ave. - S. 20th St. to S. 27th St. (WT410110611):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $17,000; Nonassessable Water Fund Budget Line 6410 -- $18,000).  The total estimated cost for this project including the requested amount is $500,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. Marilyn St. - W. Birchwood Ave. to W. Green Ave. (WT410110656):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $55,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Saveland Ave. - S. 5th St. to S. 6th St. (WT410110625):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Wanda Ave. - S. 34th St. to S. Lorene Ave. (WT410110659):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 5th St. - W. Warnimont Ave. to W. Saveland Ave. (WT410110626):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 13th St. - 340 feet south of W. Howard Ave. to W. Waterford Ave. (WT410110653):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 26th St. - W. Mangold Ave. to W. Alvina Ave. (WT410110612):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2011 construction season.

 

Various

 

Alterations by Milwaukee Water Works Distribution Section prior to paving (WT410110730):  Water main alteration.  (Nonassessable Water Fund Budget Line 6410 -- $15,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2011 construction season.

 

Water Main Alteration by Private Contractor prior to paving (WT410110750):  Water main alteration.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2011 construction season.

 

Water Main Alterations by Private Contractor prior to sewer construction (WT410110770):  Water main alteration.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2011 construction season.

 

Water Main Material Inspection (WT410110880):  Inspection.  (Nonassessable Water Fund Budget Line 6410 -- $30,000).  The total estimated cost for this project is $30,000.  This project is anticipated to be completed during the 2011 construction season.

 

Post Guarantee Inspections on Water Main Projects (WT440110850):  Inspection.  (Nonassessable Water Fund Budget Line 5010 -- $5,000).  The total estimated cost for this project is $5,000.  This project is anticipated to be completed during the 2011 construction season.

 

Suburbs

 

Review of Consultant Prepared Suburban Construction Plans (WT440110800):  Plan review.  (Nonassessable Water Fund Budget Line 5010 -- $30,000; Nonassessable Water Fund Budget Line 6410 -- $30,000).  The total estimated cost for this project is $60,000.  This project is anticipated to be completed during the 2011 construction season.

 

; and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

MLD:dr

Npr 11

04/16/10