Number
091362
Version
SUBSTITUTE 1
Reference
Sponsor
THE CHAIR
Title
A substitute ordinance relating to depositing construction waste at city area sanitation yards and the size of trailers used to transport such waste.
Sections
79-1-12-c rc
79-14.5 rc
81-35.9 rc
Analysis
Beginning in April 2010, the department of public works intends to charge for depositing construction waste at city area sanitation yards. Under the ordinance implementing various provisions for the 2010 city budget, construction waste charges range from $10 to $20, depending on the type of vehicle used for transporting the waste. This ordinance modifies these charges and establishes a standard charge of $15 per load and limits the size of a construction waste load to more than 8 cubic yards. This ordinance also clarifies the definition of construction waste.
Body
The Mayor and Common Council of the City of Milwaukee do ordain as follows:
Part 1. Section 79-1-12-c of the code is repealed and recreated to read:
79-1. Definitions. 12. SOLID WASTE consists of the following categories:
c. Construction waste is waste resulting from construction or demolition, alteration or repair, including excavated material. This includes, but is not limited to, roofing material, brick, stones, concrete, lumber, drywall, paneling and other construction material and is exclusive of any waste resulting from a fire, any painted bricks, blocks or concrete, any asphalt, or any concrete containing iron rods.
Part 2. Section 79-14.5 of the code is repealed and recreated to read:
79-14.5 Depositing of Construction Waste in Area Sanitation Yards.
Any person that deposits or causes to be deposited, dropped, dumped, discharged or left any construction waste, as defined in s. 79-1-12-c, in or about the area sanitation yards of the city shall be assessed a construction waste charge as provided in s. 81-35.9.
Part 3. Section 81-35.9 of the code is repealed and recreated to read:
81- 35.9. Construction Waste Charge.
1. The construction waste charge charged under s. 79-14.5 shall be based on a load size not exceeding 8 cubic yards.
2. The construction waste charge shall be $15 per load.
LRB:
APPROVED AS TO FORM
______________________
Legislative Reference Bureau
Date: ___________________
ATTORNEY
IT IS OUR OPINION THAT THE ORDINANCE
IS LEGAL AND ENFORCEABLE
_____________________________
Office of the City Attorney
Date: _________________________
Department
Requestor
DPW-Operations Division
Drafter
LRB10054-3
JWC
3/3/10