Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $193,000 for a total estimated cost of these projects being $3,710,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Cover Letter, 2. Fiscal Note, 3. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
3/9/20101 MAYOR SIGNED   Action details Meeting details Not available
3/2/20101 COMMON COUNCIL ADOPTEDPass14:0 Action details Meeting details Not available
2/18/20101 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Individual present: Mary Dziewiontkowski, Dept. of Public Works, Infra. Services
Pass4:0 Action details Meeting details Not available
2/12/20100 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
2/12/20100 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
2/9/20100 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

091341

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $193,000 for a total estimated cost of these projects being $3,710,000.

Analysis

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $193,000 with the total cost estimated to be $3,710,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

3rd Aldermanic District

 

Alley between E. Belleview Pl., N. Downer Ave., N. Stowell Ave., and E. Webster Pl. (ST212060101): Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2011 construction season.

 

4th Aldermanic District

 

N. Plankinton Ave. - W. Wisconsin Ave. to W. Wells St. (ST211090122): Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2011 construction season.

 

5th Aldermanic District

 

N. Granville Rd. (relocated) - W. Good Hope Rd. to a point 1,000 feet m/l north of W. Good Hope Rd. (ST211110141): Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $30,000).  The total estimated cost for this project including the requested amount is $300,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Keefe Ave. - N. 84th St. to W. Lisbon Ave. (ST211020131): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $8,000, Additional Funds).  The total estimated cost for this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2010-2011 construction season.

 

N. 89th St. - W. Burleigh St. to W. Lisbon Ave. (ST211020108): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $8,000, Additional Funds).  The total estimated cost for this project including the requested amount is $470,000.  This project is anticipated to be completed during the 2010-2011 construction season.

 

Alley W. Butler Pl., W. Grantosa Dr., W. Palmetto Ave., and N. 92nd St. (west half) (ST212060102): Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2011 construction season.

 

6th Aldermanic District

 

N. 6th St. - W. Garfield Ave. to W. North Ave. (ST211020102): Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $120,000.  This project is anticipated to be completed during the 2010-2011 construction season.

 

7th Aldermanic District

 

N. 41st St. - W. Burleigh St. to W. Auer Ave. (ST211020126): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2010-2011 construction season.

 

N. 42nd St. - W. Burleigh St. to W. Townsend St. (ST211050117): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $360,000.  This project is anticipated to be completed during the 2010-2011 construction season.

 

8th Aldermanic District

 

W. Hayes Ave. - S. 27th St. to S. 29th St. (ST211100106): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2010 construction season.

 

S. 32nd St. - W. Drury Ln. to W. Oklahoma Ave. (ST211050104): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $141,000.  This project is anticipated to be completed during the 2010 construction season.

 

Alley W. Cleveland Ave., W. Montana St., S. 49th St., and S. 50th St. (ST212060106): Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2011 construction season.

 

Alley W. Grant St., W. Lincoln Ave., S. 20th St., and S. 21st St. (northerly east-west leg) (ST212060125): Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2011 construction season.

 

8th and 12th Aldermanic Districts

 

S. 21st St. - W. Greenfield Ave. to W. Scott St. (ST211100148): Install traffic calming devices. (Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $9,000.  This project is anticipated to be completed during the 2010 construction season.

 

9th Aldermanic District

 

N. Burbank Ave. - W. Casper St. to W. Spokane St. (ST211060125): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $240,000.  This project is anticipated to be completed during the 2010 construction season.

 

N. 82nd St. - A point south of W. Clovernook St. to W. Clovernook St. (ST211020107): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $7,000, Additional Funds).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2010 construction season.

 

10th Aldermanic District

 

W. Main St. - S. 70th St. to S. 76th St. (ST211080108): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $20,000, Additional Funds).  The total estimated cost for this project including the requested amount is $230,000.  This project is anticipated to be completed during the 2010 construction season.

 

N. 58th St. - W. Phillip Pl. to W. Keefe Ave. (ST211060123): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $8,000, Additional Funds).  The total estimated cost for this project including the requested amount is $300,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 76th St. - South City Limits (south of W. Main St.) to W. Kearney St. (ST211030105): Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $400,000.  This project is anticipated to be completed during the 2011 construction season.

 

14th Aldermanic District

 

S. Logan Ave. (including S. Logan Ct.) - A point south of E. Norwich St. to E. Howard Ave. (ST21110124): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000, Additional Funds).  The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2010 construction season.

 

15th Aldermanic District

 

Alley between W. Garfield Ave., N. Hi Mount Blvd., W. Lloyd St., and N. 49th St. (ST212050146): Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $55,000.  This project is anticipated to be completed during the 2010 construction season.

 

; and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 