Title: Resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $575,000 for a total estimated cost of these projects being $4,753,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Number
231464
Version
ORIGINAL
Sponsor
THE CHAIR
Title
Resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $575,000 for a total estimated cost of these projects being $4,753,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $575,000 with the total cost estimated to be $4,753,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

1st Aldermanic District

Meaux Park (W. Villard Ave - N. 22nd St. to N. Green Bay Ave.) (SM499240007) Installing Bioswales. (Nonassessable Water Quality Fund -- $30,000). The total estimated cost of this project is $230,000. This project is anticipated to be completed during the 2024 construction season.

N. 31st St. - W. Capitol Dr. to 250’ North of W. Capitol Dr. (SM497240301) Stormwater pond. (Nonassessable Flood Mitigation Fund -- $55,000). The total estimated cost of this project is $1,433,000. This project is anticipated to be completed during the 2024 construction season.

1st and 7th Aldermanic Districts

Harriet Tubman Park (N. 48th St. - W. Glendale Ave. to W. Hampton Ave.) (SM499240008) Installing Bioswales. (Nonassessable Water Quality Fund -- $30,000). The total estimated cost of this project is $140,000. This project is anticipated to be completed during the 2024 construction season.

5th Aldermanic District

Lindsay Park (W. Marion St., W. Congress St., N. 84th St., N. 87th St.) (SM499240009) Installing Bioswales. (Nonassessable Water Quality Fund -- $30,000). The total ...