File #: 230242    Version: 0
Type: Resolution Status: Passed
File created: 6/20/2023 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 7/11/2023
Effective date:    
Title: Resolution directing the Commissioner of Public Works to execute a document titled “Master Contract Work Order” with the Wisconsin Department of Transportation for the design of temporary and permanent street lighting and underground conduit plan sheets, quantities, miscellaneous quantity sheets, construction details and special provisions due to the impacts on City of Milwaukee street lighting facilities as part of the WisDOT project that proposes the resurfacing of West Forest Home Avenue roadway and reconstruction of pedestrian curb ramps between USH 45 to 45th Street, and to set up funds for design engineering at an estimated total cost of $27,573.43 with 100% grantor share.
Sponsors: THE CHAIR
Indexes: CONTRACTS, STREET LIGHTING, WISCONSIN DEPARTMENT OF TRANSPORTATION
Attachments: 1. Master Contract Work Order, 2. Resolution Certification Comptroller's Office
Number
230242
Version
ORIGINAL
Reference
Sponsor
THE CHAIR
Title
Resolution directing the Commissioner of Public Works to execute a document titled “Master Contract Work Order” with the Wisconsin Department of Transportation for the design of temporary and permanent street lighting and underground conduit plan sheets, quantities, miscellaneous quantity sheets, construction details and special provisions due to the impacts on City of Milwaukee street lighting facilities as part of the WisDOT project that proposes the resurfacing of West Forest Home Avenue roadway and reconstruction of pedestrian curb ramps between USH 45 to 45th Street, and to set up funds for design engineering at an estimated total cost of $27,573.43 with 100% grantor share.
Analysis
This resolution directs the Commissioner of Public Works to execute a document titled “Master Contract Work Order” with the Wisconsin Department of Transportation for the design of temporary and permanent street lighting and underground conduit plan sheets, quantities, miscellaneous quantity sheets, construction details and special provisions due to the impacts on City of Milwaukee street lighting facilities as part of the WisDOT project that proposes the resurfacing of West Forest Home Avenue roadway and reconstruction of pedestrian curb ramps between USH 45 to 45th Street, and to set up funds for design engineering at an estimated total cost of $27,573.43 with 100% grantor share. This resolution also directs the City Comptroller to transfer funds for design at an estimated cost of $27,573.43 with 100% grantor share.
Body
Whereas, A Master Contract Work Order has been requested and received from the Wisconsin Department of Transportation (WisDOT) to be executed by the City of Milwaukee for the design of temporary and permanent street lighting and underground conduit plan sheets, quantities, miscellaneous quantity sheets, construction details and special provisions for West Forest Home Avenue (USH 45 t...

Click here for full text