File #: 221939    Version:
Type: Resolution Status: Passed
File created: 4/18/2023 In control: COMMON COUNCIL
On agenda: Final action: 5/9/2023
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $606,535 for a total estimated cost of $969,900.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. AD Proof.pdf, 2. Signed LTR.pdf, 3. Signed AD.pdf, 4. Notice published 5/26/2023
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
5/26/20231 CITY CLERK PUBLISHED   Action details Meeting details Not available
5/16/20231 MAYOR SIGNED   Action details Meeting details Not available
5/9/20231 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
4/26/20231 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Holly Rutenbeck - DPW Ald. Stamper explained that the speed humps requests start with a signed petition from neighbors, that a survey with a letter is mailed out to the entire block. He added that if the office does not receive the post card survey back, it is counted as in favor like it is specified on the same post card. 1st Aldermanic District N. 19th Pl. - W. Olive st. to W. Congress St. (ST211180237) Installing traffic calming speed hump(s). Ms. Rutenbeck said that there was not an elected official when the survey was conducted and that out of 46 properties surveyed only 2 opposed. Ald. Westmoreland move approval. There were no objections. N. 19th st. - W. Fiebrantz Ave. to W. Olive St. (ST211220255) Installing traffic calming speed hump(s). Ms. Rutenbeck said that the survey results were in favor. Ald. Zamarripa moved approval. There were no objections. N. 44th st. - W. Villard Ave. to W. Custer Ave. (S 1 211220243) Installing traffic calming speed hump(s). Ms. Rutenbeck said that a total of 43 properties were surveyed with 2 in favor and 1 opposed. Ald. Westmoreland moved approval. There were no objections. N. 45th St. — W. Eggert Pl. to W. Villard Ave. (ST211220248) Installing traffic calming speed hump(s). Ms. Rutenbeck said that 10 properties were surveyed and that 2 are in favor a none in opposition. Ald. Brostoff moved approval. There were no objections. 5th Aldermanic District N. 99th st. - W. Good Hope Rd. to W. Everts St. (ST211220103) Installing traffic calming speed hump(s). Ald. Westmoreland moved approval. There were no objections. 6th Aldermanic District N. 14th st. - W. Melvina st. to W. Capitol Dr. (ST211220246) Installing traffic calming speed hump(s). Ms. Rutenbeck said that the alderwoman is in support based on the survey results. N. 16th St. — W. Vienna Ave. to W. Atkinson Ave. (ST211230111) Installing traffic calming speed hump(s). Ms. Rutenbeck said that the alderwoman is in support based on the survey results. Ald. Westmoreland move approval. There were no objections. N. 21st st. - W. Townsend St. to W. Keefe Ave. (ST211220247) Installing traffic calming speed hump(s). Ms. Rutenbeck said that the alderwoman is in support based on the survey results. Ald. Zamarripa moved approval. There were no objections. W. Wright St. — N. 1st St. to N. 2nd St. (ST211230112) Installing traffic calming speed hump(s). Ms. Rutenbenck said that 5 privately owned properties were surveyed: 3 in favor and 1 opposed and that the Alderwoman leaves the decision to the committee. Neighbors present: Tara Ferguson - 2505 N 1st St - she said that she has lived there for 20 years, that she has bought a second property because she likes the houses, the area, the neighbors and that slowing traffic is desperately needed due the reckless driving. Ms. Smith - 116 W Wright St - she said that she is in objection and wonders what happens on emergency situations with all of those speed humps. She also said that she requested a speed study and that she hopes that the results be shared because she wants to know how many accidents have happened during the last 13 years. She also said that she was supposed to receive the letter with the names and telephone numbers from the people that was surveyed Shirley Ferguson - 117 W Wright St - she said that she has owned her home for 35 years and that she spent a lot of time outdoors (gardening, fencing, etc) and that she has seen the speeding and reckless driving increasing and that it is important to slow the traffic down because there are families with young children on the street. Ald. Brostoff moved approval. There were no objections. 7th Aldermanic District N. 40th st. - W. Ruby Ave. to W. Glendale Ave. (ST211230114) Installing traffic calming speed hump(s). Ms. Rutenbeck said that the alderman is in support of the project based on the survey results: 31 properties were surveyed with 1 in favor and 2 opposed. Neighbors present: Mr. Felton Benton - 4511 N 40th St - said that he and his wife collected the signatures for the speed hump because there are families with young children and that the neighborhood wants the children to play outside. Ald. Westmoreland moved approval. There were no objections. N. 46th St. — W. Auer Ave. to W. Concordia Ave. (ST211230115) Installing traffic calming speed hump(s). Neighbors present: Jack Dills- 3276 N 46th St - he said that he has lived in that block for 22 years which has been quiet until lately that they have had speeding and reckless driving issues because the block is like a runway. He added that they have a lot of retirees. Ms. Rutenbeck said that the alderman supports the project based on the survey results: 34 properties were surveyed with 4 in favor 2 opposed. Ald. Zamarripa moved approval. There were no objections. N. 50th St. — W. Nash St. to W. Vienna Ave. (ST211230113) Installing traffic calming speed hump(s). Ms. Rutenbeck said that 30 properties were surveyed with 5 in favor 2 opposed. Neighbors present: Mark Rider - 3744-3746 N 50th St - he said that City means well but that he is in opposition and that speed humps are a hammer for the solution because they stress everything in the vehicle. He added that speed tables are a much better solution (take care of the problem and do not stress the vehicles) and, that he did not see that option on the survey. He also said that we need to hit the traffic violators in the wallet. Ms. Rutenbeck said that speed tables are used more on arterials ways where they need to keep the traffic speed under 30 miles p/hour and that they are made out of concrete which doubles the cost. Timothy Smith - 3728 N 50th St - he said that the problem is getting worse even after reducing lanes and that he is in support because people do not slow down even if you are getting in/out of the vehicle. He also said that he is willing to pay for the total. Ald. Stamper moved approval. There were no objections. 8th Aldermanic District S. 23rd st. - W. Mitchell st. to W. Lapham st. (ST211230116) Installing traffic calming speed hump(s). Ald. Zamarripa moved approval. There were no objections. S. 24th st. - W. Mitchell st. to W. Lapham st. (ST211230117) Installing traffic calming speed hump(s). Ald. Zamarripa moved approval. There were no objections. S. 33rd st. - W. Pabst Ave. to W. Arthur Ave. (ST211220249) Installing traffic calming speed hump(s). Ald. Zamarripa moved approval. There were no objections. W. Lapham st. - S. 22nd st. to S. 25th st. (ST211230118) Installing traffic calming speed hump(s). Ald. Zamarripa moved approval. There were no objections. W. Orchard st. - S. 37th st. to S. 38th st. (ST211230119) Installing traffic calming speed hump(s). Ald. Zamarripa moved approval. There were no objections. W. Rogers st. - S. 24th st. to S. 25th st. (ST211220227) Installing traffic calming speed hump(s).18. Ald. Zamarripa said that MPS is working on a big project and requested that this item to be held. There were no objections. 10th Aldermanic District N. 48th st. - W. Washington Blvd. to W. Lloyd st. (ST211220260) Installing traffic calming speed hump(s). Ms. Rutenbeck said that the alderperson is in favor of the project based on the survey results: 63 properties were surveyed with 19 in support and 4 opposed. Neighbors present: Mary Campbell - 1721 N 48th St - she said that she has lived there for 40 years and that they do not have speeding problems even being so close to the express way and that she does not want the speed hump in front of her house. Ald. Brostoff moved approval. There were no objections. N. 57th st. - W. North Ave. to W. Meinecke Ave. (ST211220239) Installing traffic calming speed hump(s). Ms. Rutenbeck said that the alderman supports the project based on the survey results: 24 properties were surveyed with 6 in favor and 3 opposed. Ald. Stamper moved approval. There were no objections. N. 58th st. - W. Center St. to W. Hadley St. (ST211180287) Installing traffic calming speed hump(s). Ms. Rutenbeck said that the alderman supports the project based on the survey results: 21 properties were surveyed with 3 in favor and 2 opposed. Neighbors present: Kimberly Carrington - (over the phone) - she said that she has lived there for 10 years and that they have no issues on her block. She added that this is the second attempt and that she knows that some neighbors did not send the postcards back. She added that her block is safe. Ald. Stamper moved approval. There were no objections. N. 61st st. - W. Clarke st. to W. Center st. (ST211220240) Installing traffic calming speed hump(s). Ms. Rutenbeck said that the alderman supports the project based on the survey results: 26 properties were surveyed with 8 in favor and 4 opposed. Ald. Westmoreland moved approval. There were no objections. N. Hartung Ave. — N. 67th St. to W. Lisbon Ave. (ST 211220241) Installing traffic calming speed hump(s). Ms. Rutenbeck said that the alderman supports the project based on the survey results: 33 properties were surveyed with 11 in support and 4 opposed. Ald. Westmoreland moved approval. There were no objections. 13th Aldermanic District W. Van Norman Ave. — S. Howell Ave. to S. 1st St. (ST21 1220250) Installing traffic calming speed hump(s). Ms. Rutenbeck said that the alderman supports the project and that she was not provided with the results but that a total of 5 properties were surveyed. Ald. Stamper moved approval. There were no objections. 14th Aldermanic District Alley between W. Euclid Ave., W. Oklahoma Ave., S. 7th St., and S. 8th St. (ST212210105) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary. Ald. Dimitrijevic said that she is support of the project and requested a clarification from Ms. Rutenbeck. Ms. Rutenbeck said that the letter was sent out in English and Spanish with the proper explanation of the projects. Ald. Dimitrijevic confirmed that 27 properties were surveyed with 2 in favor and 7 opposed. Ald. Westmoreland moved approval. There were no objections. S. 14th st. - W. Manitoba st. to W. Dakota st. (ST211230122) Installing traffic calming speed hump(s). Ald. Dimitrijevic said that 7 neighbors are in support and 2 in opposition and that she also supports the project. Ald. Brostoff moved approval. There were no objections. E. Montana St. — S. Quincy Ave. to S. Howell Ave. (ST211220229) Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (5.5' width of tree border area) and grading. Ald. Dimitrijevic said that she is in support of this project. Ald. Westmoreland moved approval. There were no objections. 15th Aldermanic District N. 15th st. - W. North Ave. to W. Meinecke Ave. (ST211220252) Installing traffic calming speed hump(s). 28. Neighbors present: Caroline and Joseph Bell - 2351 N 15th St- said that this item was held at the previous meeting because they requested 2 speed humps instead. Ald. Stamper moved approval. There no objections. Ald. Brostoff moved approval of the file 221939 as amended. There were no objections. (Prevailed 5-0)
Pass5:0 Roll call Meeting details Video Video
4/18/20230 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

221939

Version

SUBSTITUTE 1

Reference

211198

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $606,535 for a total estimated cost of $969,900.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $606,535.  The total estimated cost of these projects is $969,900.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

1st Aldermanic District

 

N. 19th Pl. - W. Olive St. to W. Congress St. (ST211180237) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $3,940; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $11,700. This project is anticipated to be completed during the 2023 construction season.

 

N. 19th St. - W. Fiebrantz Ave. to W. Olive St. (ST211220255) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,770; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $11,700. This project is anticipated to be completed during the 2023 construction season.

 

N. 44th St. - W. Villard Ave. to W. Custer Ave. (ST211220243) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $4,000; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $11,700. This project is anticipated to be completed during the 2023 construction season.

 

N. 45th St. - W. Eggert Pl. to W. Villard Ave. (ST211220248) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,040; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $6,900. This project is anticipated to be completed during the 2023 construction season.

 

5th Aldermanic District

 

N. 99th St. - W. Good Hope Rd. to W. Everts St. (ST211220103) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $5,420; Nonassessable Reconstruction Paving Fund -- $1,500).  The total estimated cost for this project including the requested amount is $31,700. This project is anticipated to be completed during the 2023 construction season.

 

6th Aldermanic District

 

N. 14th St. - W. Melvina St. to W. Capitol Dr. (ST211220246) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,065; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $6,900. This project is anticipated to be completed during the 2023 construction season.

 

N. 16th St. - W. Vienna Ave. to W. Atkinson Ave. (ST211230111) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,525; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $6,900. This project is anticipated to be completed during the 2023 construction season.

 

N. 21st St. - W. Townsend St. to W. Keefe Ave. (ST211220247) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,330; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $6,900. This project is anticipated to be completed during the 2023 construction season.

 

W. Wright St. - N. 1st St. to N. 2nd St. (ST211230112) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $640; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $7,000. This project is anticipated to be completed during the 2023 construction season.

 

7th Aldermanic District

 

N. 40th St. - W. Ruby Ave. to W. Glendale Ave. (ST211230114) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,405; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $6,900. This project is anticipated to be completed during the 2023 construction season.

 

N. 46th St. - W. Auer Ave. to W. Concordia Ave. (ST211230115) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,730; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $10,900. This project is anticipated to be completed during the 2023 construction season.

 

N. 50th St. - W. Nash St. to W. Vienna Ave. (ST211230113) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,320; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $6,900. This project is anticipated to be completed during the 2023 construction season.

 

8th Aldermanic District

 

S. 23rd St. - W. Mitchell St. to W. Lapham St. (ST211230116) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $650; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $7,800. This project is anticipated to be completed during the 2023 construction season.

 

S. 24th St. - W. Mitchell St. to W. Lapham St. (ST211230117) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $565; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $7,800. This project is anticipated to be completed during the 2023 construction season.

 

S. 33rd St. - W. Pabst Ave. to W. Arthur Ave. (ST211220249) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $3,245; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $9,900. This project is anticipated to be completed during the 2023 construction season.

 

W. Lapham St. - S. 22nd St. to S. 25th St. (ST211230118) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,595; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $21,500. This project is anticipated to be completed during the 2023 construction season.

 

W. Orchard St. - S. 37th St. to S. 38th St. (ST211230119) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,110; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $6,900. This project is anticipated to be completed during the 2023 construction season.

 

10th Aldermanic District

 

N. 48th St. - W. Washington Blvd. to W. Lloyd St. (ST211220260) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $5,220; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $10,900. This project is anticipated to be completed during the 2023 construction season.

 

N. 57th St. - W. North Ave. to W. Meinecke Ave. (ST211220239) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,265; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $6,900. This project is anticipated to be completed during the 2023 construction season.

 

N. 58th St. - W. Center St. to W. Hadley St. (ST211180287) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,920; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $6,900. This project is anticipated to be completed during the 2023 construction season.

 

N. 61st St. - W. Clarke St. to W. Center St. (ST211220240) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,160; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $6,900. This project is anticipated to be completed during the 2023 construction season.

 

N. Hartung Ave. - N. 67th St. to W. Lisbon Ave. (ST211220241) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,995; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $13,000. This project is anticipated to be completed during the 2023 construction season.

 

13th Aldermanic District

 

W. Van Norman Ave. - S. Howell Ave. to S. 1st St. (ST211220250) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $730; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $6,900. This project is anticipated to be completed during the 2023 construction season.

 

14th Aldermanic District

 

Alley between W. Euclid Ave., W. Oklahoma Ave., S. 7th St., and S. 8th St. (ST212210105) File Number 211198: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary. (Assessable Alley Paving Fund - $57,190; Nonassessable Alley Paving Fund -- $129,000). The total estimated cost for this project including the requested amount is $360,000. This project is anticipated to be completed during the 2023 construction season.

 

S. 14th St. - W. Manitoba St. to W. Dakota St. (ST211230122) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,385; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $6,900. This project is anticipated to be completed during the 2023 construction season.

 

E. Montana St. - S. Quincy Ave. to S. Howell Ave. (ST211220229) File Number 221598: Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (5.5’ width of tree border area) and grading. (Assessable Reconstruction Paving Fund - $20,160; Nonassessable Reconstruction Paving Fund -- $319,000).  The total estimated cost for this project including the requested amount is $360,000. This project is anticipated to be completed during the 2023 construction season.

 

15th Aldermanic District

 

N. 15th St. - W. North Ave. to W. Meinecke Ave. (ST211220252) Installing traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,660; Nonassessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $11,500. This project is anticipated to be completed during the 2023 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved That a portion of the speed hump projects will be utilizing ARPA (American Rescue Plan Act) funds:  The project/grant number is RG1515236105; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That projects N. 19th Pl. (ST211180237), N. 19th St. (ST211220255), N. 44th St. (ST211220243), N. 45th St. (ST211220248), N. 99th St. (ST211220103), N. 14th St. (ST211220246), N. 16th St. (ST211230111), N. 21st St. (ST211220247), W. Wright St. (ST211230112), N. 40th St. (ST211230114), N. 46th St. (ST211230115), N. 50th St. (ST211230113), S. 23rd St. (ST211230116), S. 24th St. (ST211230117), S. 33rd St. (ST211220249), W. Lapham St. (ST211230118), W. Orchard St. (ST211230119), N. 48th St. (ST211220260), N. 57th St. (ST211220239), N. 58th St. (ST211180287), N. 61st St. (ST211220240), N. Hartung Ave. (ST211220241), W. Van Norman Ave. (ST211220250), Euclid Ave. Alley (ST212210105), S. 14th St. (ST211230122), E. Montana St. (ST211220229), N. 15th St. (ST211220252) will be billed after January 1, 2025, but not before 12 months after the project contract has been completed.

 

Requestor

Infrastructure Services Division

Drafter

Holly Rutenbeck/TW

AFR 11

4/26/2023