powered help
header-left header-center header-right
File #: 220618    Version:
Type: Resolution Status: Passed
File created: 9/1/2022 In control: COMMON COUNCIL
On agenda: Final action: 9/20/2022
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $289,000 for a total estimated cost of these projects being $3,673,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS

Number

220618

Version

Substitute 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $289,000 for a total estimated cost of these projects being $3,673,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $289,000 with the total cost estimated to be $3,673,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

1st and 7th Aldermanic District

 

W. Hampton Ave. - N. Teutonia Ave. to N. 60th St. (WT410220004): Hydrant alterations. (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost of this project including the requested amount is $255,000.  This project is anticipated to be completed during the 2022 construction season.

 

8th Aldermanic District

 

S. 37th St. - W. Burnham St. to W. Grant St. (SM495220023) Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund - $15,000).  The total estimated cost of this project including the requested amount is $652,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Becher St.- S. 36th St. to S. 37th St. (SM495220022) Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund - $12,000).  The total estimated cost of this project including the requested amount is $114,000.  This project is anticipated to be completed during the 2023 construction season.

 

12th Aldermanic District

 

City of Milwaukee parking lot at 1657 S. 12th St. (SM499210010) File Number 210304: Installing Bioswales. (Nonassessable Water Quality Fund-additional funds $10,000).  The total estimated cost of this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2023 construction season.

 

City of Milwaukee parking lot at 1002 W. Maple St. (SM499210011) File Number 210304: Installing Bioswales. (Nonassessable Water Quality Fund-additional funds $10,000).  The total estimated cost of this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2023 construction season.

 

City of Milwaukee parking lot at 716 W. Windlake Ave. (SM499210012) File Number 210304: Installing Bioswales. (Nonassessable Water Quality Fund-additional funds $10,000).  The total estimated cost of this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2023 construction season.

 

City of St. Francis and 14th Aldermanic District

 

S. Brust Ave. - A point South of E. Norwich St. to E. Norwich St. (ST216220108) Asphalt pavement resurfacing (Nonassessable Reconstruction Paving Fund -- $7,000).  The total estimated cost for this project including the requested amount is $7,000.  This project is anticipated to be completed during the 2022 construction season.

 

City Wide

 

City wide building sanitary sewers full replacement. (SM494220011) Sewer lateral replacement (Nonassessable Infiltration/Inflow Reduction Fund - $55,000).  The total estimated cost of this project including the requested amount is $55,000.  This project is anticipated to be completed during the 2023 construction season.

 

ADA ramps for 2023 High impact paving north-side projects: (ST216220109) Replace curb and gutter and sidewalk as necessary (Nonassessable High Impact Paving Fund - $75,000).  The total estimated cost of this project including the requested amount is $1,000,000.  This project is anticipated to be completed during the 2023 construction season.

 

ADA ramps for 2023 High impact paving south-side projects: (ST216220110) Replace curb and gutter and sidewalk as necessary (Nonassessable High Impact Paving Fund -- $75,000).  The total estimated cost of this project including the requested amount is $1,000,000.  This project is anticipated to be completed during the 2023 construction season.

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Holly Rutenbeck/TW

NPR

9/2/2022