Number
220408
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $180,000 for a total estimated cost of these projects being $1,549,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $180,000 with the total cost estimated to be $1,549,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:
3rd Aldermanic District and Village of Shorewood
E. Edgewood Ave. - N. Lake Dr. to N. Oakland Ave. (ST216220107) Asphalt pavement resurfacing and replace ADA ramps. (Nonassessable High Impact Paving Fund -- $15,000). The total estimated cost of this project including the requested amount is $630,000. This project is anticipated to be completed during the 2023-24 construction season.
10th Aldermanic District
E. Lisbon Ave. - W. Burleigh St. to N. 76th St. (SM495220020) Relaying storm sewer. (Nonassessable Sewer Maintenance Relay Fund - $20,000). The total estimated cost of this project including the requested amount is $456,000. This project is anticipated to be completed during the 2023 construction season.
12th Aldermanic District
S.Bettinger Ct. - W. Pierce St. to 170’ South of W. Pierce St. (WT410220920) Water main extension. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $95,000. This project is anticipated to be completed during the 2023 construction season.
15th Aldermanic District
N. 20th St. - W. Center St. to W. Hadley St. (SM495220021) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund - $15,000). The total estimated cost of this project including the requested amount is $218,000. This project is anticipated to be completed during the 2022 construction season.
N. 24th St. - W. Galena St. to W. Walnut St. (WT410220919) Abandoning water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $50,000. This project is anticipated to be completed during the 2022 construction season.
City Wide
2022 Speed Hump Construction Administration (ST211220235) (Nonassessable Reconstruction Paving Fund -- $100,000). The total estimated cost for this project including the requested amount is $100,000. This project is anticipated to be completed during the 2022 construction season.
;and, be it
Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
Holly Rutenbeck/TW
NPR 15 Sub
7/15/2022