Number
220406
Version
SUBSTITUTE 1
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $269,495 for a total estimated cost of $673,100.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $269,495. The total estimated cost of these projects is $673,100.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:
1st Aldermanic District
N. 28th St. - N. Teutonia Ave. to W. Fairmount Ave. (ST211220210) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $760; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,000. This project is anticipated to be completed during the 2022 construction season.
N. 47th St. - W. Fairmount Ave. to W. Eggert Pl. (ST211220165) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $3,515; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $15,400. This project is anticipated to be completed during the 2022 construction season.
W. Luscher Ave. - N. 48th St. to N. 49th St. (ST211220164) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $940; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,300. This project is anticipated to be completed during the 2022 construction season.
2nd Aldermanic District
N. 61st St. - W. Capitol Dr. to W. Hope Ave. (ST211210234) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $4,595; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $15,000. This project is anticipated to be completed during the 2022 construction season.
N. 61st St. - W. Hope Ave. to W. Marion St. (ST211190146) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,480; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,300. This project is anticipated to be completed during the 2022 construction season.
N. 62nd St. - W. Fiebrantz Ave. to W. Hope Ave. (ST211220183) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,365; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,300. This project is anticipated to be completed during the 2022 construction season.
N. 64th St. - W. Fiebrantz Ave. to W. Marion St. (ST211220184) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,355; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $16,200. This project is anticipated to be completed during the 2022 construction season.
N. 69th St. - W. Glendale Ave. to W. Courtland Ave. (ST211220212) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,770; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,300. This project is anticipated to be completed during the 2022 construction season.
N. 71st St. - W. Hampton Ave. to W. Stark St. (ST211220175) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,030; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $10,300. This project is anticipated to be completed during the 2022 construction season.
N. 72nd St. - W. Congress St. to W. Ruby Ave. (ST211220206) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,080; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,300. This project is anticipated to be completed during the 2022 construction season.
N. 92nd St. - W. Custer Ave. to W. Birch Ave. (ST211220199) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,460; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $10,200. This project is anticipated to be completed during the 2022 construction season.
N. 101st St. - W. Bender Rd. to W. Mill Rd. (ST211220201) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,400; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,700. This project is anticipated to be completed during the 2022 construction season.
W. Courtland Ave. - N. 69th St. to N. 70th St. (ST211220213) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $0; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,800. This project is anticipated to be completed during the 2022 construction season.
W. Tallmadge Pl. - N. 69th St. to W. Tallmadge Ct. (ST211220211) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,570; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,300. This project is anticipated to be completed during the 2022 construction season.
W. Thurston Ave. - N. 80th St. to N. 82nd Ct. (ST211220205) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,530; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $15,500. This project is anticipated to be completed during the 2022 construction season.
3rd Aldermanic District
N. Bremen St. - E. North Ave. to E. Meinecke Ave. (ST211220181) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,220; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,800. This project is anticipated to be completed during the 2022 construction season.
N. Dousman St. - E. Burleigh St. to E. Auer Ave. (ST211220208) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,220; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,100. This project is anticipated to be completed during the 2022 construction season.
E. Meinecke Ave. - N. Fratney St. to N. Pierce St. (ST211220185) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $520; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,900. This project is anticipated to be completed during the 2022 construction season.
N. Terrace Ave. - E. Bradford Ave. to N. Wahl Ave. (ST211220223) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $4,030; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $16,800. This project is anticipated to be completed during the 2022 construction season.
N. Warren Ave. - N. Arlington Pl. to E. Brady St. (ST211220180) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,335; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,800. This project is anticipated to be completed during the 2022 construction season.
4th Aldermanic District
E. Erie St. - N. Young St. to N. Jefferson St. (ST211220157) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,295; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $16,600. This project is anticipated to be completed during the 2022 construction season.
5th Aldermanic District
W. Silver Spring Dr. (Southside Frontage Road) - N. 103rd St. to N. 107th St. ST211220220) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,210; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $13,700. This project is anticipated to be completed during the 2022 construction season.
6th Aldermanic District
N. 9th St. - W. Keefe Ave. to W. Atkinson Ave. (ST211160144) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,600; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,300. This project is anticipated to be completed during the 2022 construction season.
N. 19th St. - W. Finn Pl. to W. Nash St. (ST211210263) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,530; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,600. This project is anticipated to be completed during the 2022 construction season.
N. 23rd St. - W. Vienna Ave. to W. Melvina St. (ST211210264) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,110; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,600. This project is anticipated to be completed during the 2022 construction season.
N. Buffum St. - E. Chambers St. to E. Burleigh St. (ST211220147) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,675; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $10,700. This project is anticipated to be completed during the 2022 construction season.
N. Buffum St. - E. Townsend St. to E. Keefe Ave. (ST211220148) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,190; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,800. This project is anticipated to be completed during the 2022 construction season.
W. Chambers St. - N. 11th St. to N. 11th Ln. (ST211220207) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $405; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $10,200. This project is anticipated to be completed during the 2022 construction season.
W. Christine Ln. - N. Vel R. Phillips Ave. to N. 5th St. (ST211220187) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $975; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,300. This project is anticipated to be completed during the 2022 construction season.
E. Clarke St. - N. Palmer St. to N. 2nd St. (ST211220160) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,100; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $15,800. This project is anticipated to be completed during the 2022 construction season.
E. Meinecke Ave. - N. Booth St. to N. Holton St. (ST211220161) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $715; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,900. This project is anticipated to be completed during the 2022 construction season.
N. Palmer St. - E. Brown St. to E. Lloyd St. (ST211220186) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,520; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,900. This project is anticipated to be completed during the 2022 construction season.
N. Richards St. - E. Hadley St. to E. Locust St. (ST211220171) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,960; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $10,200. This project is anticipated to be completed during the 2022 construction season.
N. Richards St. - E. Townsend St. to E. Keefe Ave. (ST211220172) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,445; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $10,700. This project is anticipated to be completed during the 2022 construction season.
7th Aldermanic District
N. 37th St. - W. Glendale Ave. to N. Hopkins St. (ST211220194) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,020; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,800. This project is anticipated to be completed during the 2022 construction season.
N. 38th St. - W. Marion St. to W. Congress St. (ST211220188) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,515; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,800. This project is anticipated to be completed during the 2022 construction season.
N. 40th St. - W. Congress St. to W. Ruby Ave. (ST211220173) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,445; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,800. This project is anticipated to be completed during the 2022 construction season.
N. 40th St. - W. Courtland Ave. to W. Hampton Ave. (ST211220215) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,515; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,800. This project is anticipated to be completed during the 2022 construction season.
N. 40th St. - W. Glendale Ave. to W. Courtland Ave. (ST211220174) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,405; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,800. This project is anticipated to be completed during the 2022 construction season.
N. 41st St. - W. Keefe Ave. to W. Nash St. (ST211220189) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,400; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,800. This project is anticipated to be completed during the 2022 construction season.
N. 46th St. - W. Chambers St. to W. Burleigh St. (ST211220214) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,320; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,700. This project is anticipated to be completed during the 2022 construction season.
N. 49th St. - W. Concordia Ave. to W. Townsend St. (ST211220190) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,695; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,800. This project is anticipated to be completed during the 2022 construction season.
N. 56th St. - W. Nash St. to W. Vienna Ave. (ST211220224) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,505; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,800. This project is anticipated to be completed during the 2022 construction season.
8th Aldermanic District
S. 26th St. - W. Orchard St. to W. Greenfield Ave. (ST211210111) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,275; Nonassessable Reconstruction Paving Fund -- $7,825). The total estimated cost for this project including the requested amount is $10,100. This project is anticipated to be completed during the 2022 construction season.
S. 26th St. - W. Pierce St. to W. National Ave. (ST211220217) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,175; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,100. This project is anticipated to be completed during the 2022 construction season.
W. Orchard St. - S. 26th St. to S. Layton Blvd. (ST211200150) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $3,120; Nonassessable Reconstruction Paving Fund -- $6,780). The total estimated cost for this project including the requested amount is $9,900. This project is anticipated to be completed during the 2022 construction season.
W. Pierce St. - S. Shea Ave. to S. 38th St. (ST211220222) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $5,340; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $39,500. This project is anticipated to be completed during the 2022 construction season.
9th Aldermanic District
W. Carmen Ave. - N. 57th St. to N. 60th St. (ST211220218) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,415; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $14,900. This project is anticipated to be completed during the 2022 construction season.
10th Aldermanic District
W. Valley Forge Dr. - N. 58th St. to N. 59th St. (ST211220225) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $845; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,700. This project is anticipated to be completed during the 2022 construction season.
11th Aldermanic District
W. Warnimont Ave. - S. 61st St. to S. 63rd St. (ST211220221) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,435; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $15,700. This project is anticipated to be completed during the 2022 construction season.
12th Aldermanic District
S. 12th St. - W. Lincoln Ave. to W. Grant St. (ST211220182) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,025; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $11,200. This project is anticipated to be completed during the 2022 construction season.
S. 20th St. - W. Lapham St. to W. Orchard St. (ST211220138) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,135; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,100. This project is anticipated to be completed during the 2022 construction season.
W. Scott St. - S. 10th St. to S. 11th St. (ST211220139) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,120; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $10,500. This project is anticipated to be completed during the 2022 construction season.
W. Scott St. - S. 14th St. to S. 15th Pl. (ST211200151) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $5,935; Nonassessable Reconstruction Paving Fund -- $12,765). The total estimated cost for this project including the requested amount is $18,700. This project is anticipated to be completed during the 2022 construction season.
13th Aldermanic District
S. 14th St. - W. Edgerton Ave. to W. Vogel Ave. (ST211160176) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $815; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,500. This project is anticipated to be completed during the 2022 construction season.
15th Aldermanic District
N. 19th St. - W. Walnut St. to W. Vine St. (ST211130159) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,575; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,400. This project is anticipated to be completed during the 2022 construction season.
N. 22nd St. - W. Vine St. to W. Brown St. (ST211220226) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,555; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,900. This project is anticipated to be completed during the 2022 construction season.
N. 23rd St. - W. Walnut St. to W. Vine St. (ST211220219) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,190; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,600. This project is anticipated to be completed during the 2022 construction season.
N. 30th St. - W. Wright St. to W. Clarke St. (ST211220196) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $1,765; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,800. This project is anticipated to be completed during the 2022 construction season.
N. 46th St. - W. North Ave. to W. Meinecke Ave. (ST211220197) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,280; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $11,100. This project is anticipated to be completed during the 2022 construction season.
N. Grant Blvd. - W. Center St. to W. Hadley St. (ST211220168) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund - $2,400; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,700. This project is anticipated to be completed during the 2022 construction season.
; and
Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and
Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it
Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it
Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it
Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it
Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it
Further Resolved That a portion of the speed hump projects will be utilizing ARPA (American Rescue Plan Act) funds: The project/grant number is RG1515236103; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That projects N. 28th St. (ST211220210), N. 47th St. (ST211220165), W. Luscher Ave. (ST211220164), N. 61st St. (ST211210234), N. 61st St. (ST211190146), N. 62nd St. (ST211220183), N. 64th St. (ST211220184), N. 69th St. (ST211220212), N. 71st St. (ST211220175), N. 72nd St. (ST211220206), N. 92nd St. (ST211220199), N. 101st St. (ST211220201), W. Courtland Ave. (ST211220213), W. Tallmadge Pl. (ST211220211), W. Thurston Ave. (ST211220205), N. Bremen St. (ST211220181), N. Dousman St. (ST211220208), E. Meinecke Ave. (ST211220185), N. Terrace Ave. (ST211220223), N. Warren Ave. (ST211220180), E. Erie St. (ST211220157), W. Silver Spring Dr. (Southside Frontage Road) (ST211220220), N. 9th St. (ST211160144), N. 19th St. (ST211210263), N. 23rd St. (ST211210264), N. Buffum St. (ST211220147), N. Buffum St. (ST211220148), W. Chambers St. (ST211220207), W. Christine Ln. (ST211220187), E. Clarke St. (ST211220160), E. Meinecke Ave. (ST211220161), N. Palmer St. (ST211220186), N. Richards St. (ST211220171), N. Richards St. (ST211220172), N. 37th St. (ST211220194), N. 38th St. (ST211220188), N. 40th St. (ST211220173), N. 40th St. (ST211220215), N. 40th St. (ST211220174), N. 41st St. (ST211220189), N. 46th St. (ST211220214), N. 49th St. (ST211220190), N. 56th St. (ST211220224), S. 26th St. (ST211210111), S. 26th St. (ST211220217), W. Orchard St. (ST211200150), W. Pierce St. (ST211220222), W. Carmen Ave. (ST211220218), W. Valley Forge Dr. (ST211220225), W. Warnimont Ave. (ST211220221), S. 12th St. (ST211220182), S. 20th St. (ST211220138), W. Scott St. (ST211220139), W. Scott St. (ST211200151), S. 14th St. (ST211160176), N. 19th St. (ST211130159), N. 22nd St. (ST211220226), N. 23rd St. (ST211220219), N. 30th St. (ST211220196), N. 46th St. (ST211220197), N. Grant Blvd. (ST211220168) will be billed after January 1, 2024, but not before 12 months after the project contract has been completed; and, be it
Further Resolved, That the following project be deleted from the 2022 Paving Program: W. Potomac Ave. (ST211220159)
Requestor
Infrastructure Services Division
Drafter
Holly Rutenbeck/TW
Afr15
7/20/2022