File #: 211997    Version:
Type: Resolution Status: Passed
File created: 4/19/2022 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 5/10/2022
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $15,000 for a total estimated cost of these projects being $415,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Number
211997
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $15,000 for a total estimated cost of these projects being $415,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $15,000 with the total cost estimated to be $415,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

6th Aldermanic District

PCB REMOVAL - 4132 N. Holton St. (SM495220014) Sanitary sewer PCB removal. (Nonassessable Sewer Maintenance Relay Fund - $5,000). The total estimated cost of this project including the requested amount is $400,000. This project is anticipated to be completed during the 2022 construction season.

City Wide

Water Alterations - Developer Funded (WT430210300) File Number 201139 Water main alteration. (Nonassessable Water Fund Budget Line 5010 -- $0; Nonassessable Water Fund Budget Line 6410 - additional funds $10,000). The total estimated cost of this project including the requested amount is $15,000. This project is anticipated to be completed during the 2022 construction season.

;and, be it

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

Further Resolved, That the City Comptroller is auth...