File #: 211861    Version:
Type: Resolution Status: Passed
File created: 3/22/2022 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 4/19/2022
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,755,000 for a total estimated cost of these projects being $19,005,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS

 

Number

211861

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,755,000 for a total estimated cost of these projects being $19,005,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $1,755,000 with the total cost estimated to be $19,005,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

1st Aldermanic District

 

N. 12th St. - W. Wilson Dr. to W. Birch Ave. (WT410230673): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2023 construction season. 

 

N. 13th St. - 330’ South of W. Lawn Ave. to W. Custer Ave. (WT410230677): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2023 construction season. 

 

N. 19th Pl. - W. Fairmount Ave. to W. Eggert Pl. (WT410230616): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost of this project including the requested amount is $220,000.  This project is anticipated to be completed during the 2023 construction season. 

 

N. 19th St. -W. Eggert Pl. to W. Villard Ave. (WT410230617): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2023 construction season. 

 

N. 19th St. - W. Fairmount Ave. to W. Eggert Pl. (WT410230614): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost of this project including the requested amount is $230,000.  This project is anticipated to be completed during the 2023 construction season. 

 

N. 20th St. - W. Custer Ave. to W. Neil Pl. (WT410230670): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2023 construction season. 

 

N. 22nd St. - W. Hampton Ave. to W. Linwal Ln. (WT410230657): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $120,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Birch Ave. - N. 11th St. to 100’ East of N. 13th St. (WT410230675): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Cornell St. - N. 20th St. to N. Teutonia Ave. (WT410230640): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $34,000).  The total estimated cost of this project including the requested amount is $590,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Custer Ave. - N. 13th St. to N. Green Bay Ave. (WT410230672): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $29,000).  The total estimated cost of this project including the requested amount is $495,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Custer Ave. - N. 20th St. to 100’ West of N. Long Island Dr. (WT410230669): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Eggert Pl. - N. 19th St. to N. 19th Pl. (WT410230615): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Linwal Ln. - N. 22nd St. to N. 24th St. (WT410230656): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2023 construction season. 

 

N. Milwaukee River Pkwy. - 760’ Southwest of W. Birch Ave. to W. Birch Ave.  (WT410230676): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost of this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Neil Pl. - N. 20th St. to 215’ Northwest of N. Long Island Dr. (WT410230671): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost of this project including the requested amount is $270,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Stark St. - N. 20th St. to N. 24th St. (WT410230658): Relaying water main and water main extension (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $24,000).  The total estimated cost of this project including the requested amount is $310,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Wilson Dr. - N. 12th St. to N. 13th St. (WT410230674): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2023 construction season. 

 

2nd Aldermanic District

 

N. 63rd St. and W. Baldwin St. - 250’ South of W. Ruby Ave. to W. Medford Ave. (WT410230635): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2023 construction season. 

 

N. 65th St. - W. Melvina St. to W. Capitol Dr. (WT410230620): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2023 construction season. 

 

N. 66th St. - W. Carmen Ave. to W. Bobolink Ave. (WT410230689): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2023 construction season. 

 

N. 67th St. - W. Carmen Ave. to W. Bobolink Ave. (WT410230690): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2023 construction season.

 

N. 68th St. - W. Congress St. to W. Glendale Ave. (WT410230638): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $24,000).  The total estimated cost of this project including the requested amount is $335,000.  This project is anticipated to be completed during the 2023 construction season. 

 

N. 68th St. - W. Grantosa Dr. to 425’ South of W. Grantosa Dr. (WT410230642): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $105,000.  This project is anticipated to be completed during the 2023 construction season. 

 

N. 79th St. - W. Silver Spring Dr. to W. Carmen Ave. (WT410230693): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $24,000).  The total estimated cost of this project including the requested amount is $325,000.  This project is anticipated to be completed during the 2023 construction season.

 

N. 82nd Ct. - 165’ Northeast of W. Thurston Ave. to W. Thurston Ave. (WT410230695): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $45,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Bobolink Ave. - N. 65th St. to N. 68th St. (WT410230691): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost of this project including the requested amount is $240,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Capitol Dr. Southside - N. 60th St. to N. 76th St. (WT410230619): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $74,000).  The total estimated cost of this project including the requested amount is $1,350,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Carmen Ave. - N. 65th St. to N. 68th St.  (WT410230688): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost of this project including the requested amount is $235,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Carmen Ave. - N. 76th St. to N. 80th St. (WT410230692): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $24,000).  The total estimated cost of this project including the requested amount is $315,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Congress St. - N. 60th St. to N. 63rd St. (WT410230633): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost of this project including the requested amount is $255,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Fond du Lac Ave. - N. 95th St. to 350’ Northwest of N. 95th St. (WT410230659): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $105,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Fond Du Lac Ave. - W. Baldwin St. to W. Hampton Ave. (WT410230639): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $39,000).  The total estimated cost of this project including the requested amount is $650,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Herbert Ave. - W. Tallmadge Pl. to N. 74th St. (WT410230643): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $195,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Medford Ave. and N. 61st St. - W. Congress St. to N. 64th St. (WT410230634): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $29,000).  The total estimated cost of this project including the requested amount is $410,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Ruby Ave. - N. 63rd St. to N. 65th St. (WT410230636): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $175,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Ruby Ave. - N. 66th St. to N. 68th St. (WT410230637): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Tallmadge Pl. - W. Grantosa Dr. to W. Custer Ave. (WT410230644): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Thurston Ave. - N. 80th St. to W. Carmen Ave. (WT410230694): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $24,000).  The total estimated cost of this project including the requested amount is $320,000.  This project is anticipated to be completed during the 2023 construction season. 

 

3rd Aldermanic District

 

E. Belleview Pl. - N. Maryland Ave. to N. Stowell Ave. (WT410230608): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost of this project including the requested amount is $245,000.  This project is anticipated to be completed during the 2023 construction season. 

 

N. Dousman St. - E. Meinecke Ave. to E. Clarke St. (WT410230605): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $24,000).  The total estimated cost of this project including the requested amount is $330,000.  This project is anticipated to be completed during the 2023 construction season.

 

E. Hampshire St. - N. Marietta Ave. to N. Lake Dr. (WT410230647): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2023 construction season.

 

N. Lake Dr. - E. Kenwood Blvd. to E. Hampshire St. (WT410230648): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2023 construction season.

 

N. Lake Dr. - E. Newberry Blvd. South Line to E. Locust St. (WT410230628): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $190,000.  This project is anticipated to be completed during the 2023 construction season.

 

N. Lake Dr. - E. Newport Ct. to E. Edgewood Ave. (WT410230629): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $24,000).  The total estimated cost of this project including the requested amount is $300,000.  This project is anticipated to be completed during the 2023 construction season.

 

N. Prospect Ave. - E. Belleview Pl. to E. Park Pl. (WT410230609): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $135,000.  This project is anticipated to be completed during the 2023 construction season.

 

N. Stowell Ave. - E. Belleview Pl. to E. Park Pl. (WT410230607): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $135,000.  This project is anticipated to be completed during the 2023 construction season.

 

4th Aldermanic District

 

N. 18th St. - W. McKinley Ave. to W. Vliet St. (WT410230660): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2023 construction season. 

 

N. 20th St. - W. Juneau Ave. to W. Vliet St.  (WT410230662): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost of this project including the requested amount is $240,000.  This project is anticipated to be completed during the 2023 construction season. 

 

N. 23rd St. - W. Kilbourn Ave. to W. State St. (WT410230664): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2023 construction season. 

 

N. 26th St. - W. Michigan St. to W. Wisconsin Ave. (WT410230683): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Juneau Ave. - N. 18th St. to N. 20th St.  (WT410230663): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Kilbourn Ave. - N. 20th St. to N. 24th St. (WT410230665): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $24,000).  The total estimated cost of this project including the requested amount is $310,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. McKinley Ave. - N. 18th St. to N. 20th St. (WT410230661): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Michigan St. - N. 26th St. to N. 27th St.  (WT410230684): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2023 construction season. 

 

5th Aldermanic District

 

N. 83rd St. - W. Melvina St. South to W. Capitol Dr. (WT410230626): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $155,000.  This project is anticipated to be completed during the 2023 construction season.

 

N. 94th St. - W. Center St. to 400’ Northeast of W. Center St. (WT410230666): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $110,000.  This project is anticipated to be completed during the 2023 construction season. 

 

N. 95th St./W. Lorraine Pl./N. 97th St. - W. Center St. to W. Center St. (WT410230668): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $24,000).  The total estimated cost of this project including the requested amount is $305,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Capitol Dr. Southside - N. 82nd St. to N. 84th St. (WT410230625): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Capitol Dr. Southside - N. 86th St. to N. 88th St. (WT410230627): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost of this project including the requested amount is $220,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Hadley St. - 320’ West of N. 92nd St. to N. Colonial Dr. (WT410230667): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $24,000).  The total estimated cost of this project including the requested amount is $310,000.  This project is anticipated to be completed during the 2023 construction season. 

 

6th Aldermanic District

 

N. Dr. Martin Luther King Jr. Dr. - W. Keefe Ave. to N. 7th St. (WT410230613): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost of this project including the requested amount is $235,000.  This project is anticipated to be completed during the 2023 construction season.

 

7th Aldermanic District

 

N. 30th St. - W. Locust St. to W. Auer Ave. (WT410230610): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $29,000).  The total estimated cost of this project including the requested amount is $490,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Auer Ave. - N. 29th St. to N. 31st St. (WT410230611): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Chambers St. - N. 30th St. to 400’ West of N. 30th St. (WT410230612): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $40,000.  This project is anticipated to be completed during the 2023 construction season.

 

9th Aldermanic District

 

N. 63rd St. - W. Thurston Ave. to 330’ North of W. Thurston Ave. (WT410230686): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Carmen Ave. - N. 60th St. to N. 62nd St. (WT410230687): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Thurston Ave. - N. 62nd St. to N. 64th St. (WT410230685): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $185,000.  This project is anticipated to be completed during the 2023 construction season. 

 

10th Aldermanic District

 

N. 70th St. - W. Melvina St. to W. Capitol Dr. (WT410230621): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $180,000.  This project is anticipated to be completed during the 2023 construction season.

 

N. 71st St. - W. Beckett Ave. to W. Capitol Dr. (WT410230622): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost of this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2023 construction season.

 

N. 77th St. - W. Melvina St. to W. Capitol Dr. (WT410230624): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $155,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Capitol Dr. Southside - N. 76th St. to N. 78th St. (WT410230623): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Locust St. - N. 50th St. to N. 57th St. (WT410230645): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $34,000).  The total estimated cost of this project including the requested amount is $545,000.  This project is anticipated to be completed during the 2023 construction season.

 

11th Aldermanic District

 

S. 69th St. - W. Howard Ave. to 355’ South of W. Howard Ave. (WT410230679): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2023 construction season. 

 

S. 71st St. - S. Sunset Dr. to S. Massachusetts Ave. (WT410230652): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost of this project including the requested amount is $275,000.  This project is anticipated to be completed during the 2023 construction season.

 

S. 75th St. - W. Honey Creek Dr. to W. Ohio Ave. (WT410230682): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $135,000.  This project is anticipated to be completed during the 2023 construction season. 

 

S. 79th St.- W. Ohio Ave. to W. Verona Ct. (WT410230654): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost of this project including the requested amount is $240,000.  This project is anticipated to be completed during the 2023 construction season. 

 

S. 80th St. - W. Van Beck Ave. to W. Norwich St. (WT410230631): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2023 construction season.

 

S. 81st St.- W. Burdick Ave. to W. Ohio Ave. (WT410230655): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Burdick Ave. - W. River Bend Dr. to S. 75th St. (WT410230680): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost of this project including the requested amount is $210,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Eden Ct. - S. Massachusetts Ave. to 145’ West of S. Massachusetts Ave. (WT410230649): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Eden Pl. - W. Warnimont Ave. to S. Massachusetts Ave. (WT410230651): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Howard Ave. (South side) - S. 68th St. to 125’ West of S. 69th St. (WT410230678): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2023 construction season. 

 

S. Massachusetts Ave. - W. Morgan Ave. to W. Warnimont Ave. (WT410230650): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Norwich St. - 200’ East of S. 80th St. to S. 80th St. (WT410230630): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $55,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. River Bend Dr. - W. Burdick Ave. to W. Honey Creek Dr. (WT410230681): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2023 construction season. 

 

W. Van Beck Ave. - 180’ East of S. 80th St. to S. 80th St. (WT410230632): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $55,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Wilbur Ct. - S. 71st St. to 140’ West of S. 71st St. (WT410230653): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $45,000.  This project is anticipated to be completed during the 2023 construction season.

 

13th Aldermanic District

 

S. Adams Ave. - E. Plainfield Ave. to 300’ South of E. Plainfield Ave. (WT410230697): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2023 construction season.

 

S. Griffin Ave. - E. Plainfield Ave. to 350’ South of E. Plainfield Ave. (WT410230696): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2023 construction season.

 

W. Whitaker Ave. - W. Bottsford Ave. to S. 27th St. (WT410230641): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost of this project including the requested amount is $270,000.  This project is anticipated to be completed during the 2023 construction season.

 

14th Aldermanic District

 

E. Falling Heath Pl. - S. Kinnickinnic Ave. to S. Pennsylvania Ave. (WT410230618): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2023 construction season.

 

E. Potter Ave. - E. Russell Ave. to S. Kinnickinnic Ave. (WT410230606): Relaying water main and lead replacement of service (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $24,000).  The total estimated cost of this project including the requested amount is $320,000.  This project is anticipated to be completed during the 2023 construction season.

 

City of Saint Francis

 

S. Troy Ave. - E. Howard Ave. to 360’ South of E. Howard Ave. (WT410230646): Relaying water main (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $14,000).  The total estimated cost of this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2023 construction season.

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Holly Rutenbeck:MSA

Npr10 Sub

4/1/2022