Number
211200
Version
SUBSTITUTE 1
Reference
190519
Sponsor
THE CHAIR
Title
Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $6,643,409.26 for a total estimated cost of these projects being $8,778,674.35.
Analysis
This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works. The City cost of the projects approved by this resolution is estimated to be $6,643,409.26. The total estimated cost of these projects is $8,778,674.35.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and
Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:
4th Aldermanic District
Alley betw. W. Clybourn St., W. St Paul Av., N. 28th St., N. 29th St. (new e/w leg to N. 29th St.) (MKE playground)(ST212180117) File Number 190519: Concrete alley construction. (Nonassessable Alley paving fund -- $10,000 additional funds) This project was completed in 2020 and the funds are needed to close out the contract.
6th Aldermanic District
W. Capitol Dr. - N. 10th St. to N. 16th St. (WT410210901) File Number 211199: Water main joint repair. (Nonassessable Water Fund Budget Line 5010 -- $0; Nonassessable Water Fund Budget Line 6410 -- $300,000). The total estimated cost of this project including the requested amount is $325,000. This project is anticipated to be completed during the 2021 construction season.
5th and 9th Aldermanic Districts
W. Calumet Road - Bridge over the Little Menomonee River (BR3201809XX/ST3201809XX) (2984-50-70) File Number 181112: Bridge replacement and approach roadways. This project is anticipated to be constructed in the 2022 construction season.
Grantor Non-Reimbursable Paving Fund -- $347,826.09
Grantor Reimbursable Paving Fund -- $52,173.91
City Share Non Assessable Paving Fund -- $140,731.08
Grantor Non-Reimbursable Structure Fund -- $677,846.96
Grantor Reimbursable Structure Fund -- $101,677.04
City Share Non Assessable Structure Fund -- $442,678.18
These funds are to be transferred to the construction accounts (BR3201809XX/ST3201809XX) (2984-50-70)
Previously authorized for project construction: $0.00
Current estimated cost of total project including this resolution: $2,035,848.26
Original estimated cost of the project: (File Number 181112): $1,897,320.00
11th Aldermanic District
W. Oklahoma Ave. - S. 74th St. to S. 76th St. (WT410190500) File Number 181686: Water main extension. (Nonassessable Water Fund Budget Line 5010 -- $0; Nonassessable Water Fund Budget Line 6410 -- $2,170,000). The total estimated cost of this project including the requested amount is $2,205,000. This project is anticipated to be completed during the 2022 construction season.
W. Oklahoma Ave. - S. 76th St. to S. 84th St. (WT410190501) File Number 181686: Water main extension. (Nonassessable Water Fund Budget Line 5010 -- $0; Nonassessable Water Fund Budget Line 6410 -- $3,645,000). The total estimated cost of this project including the requested amount is $3,680,000. This project is anticipated to be completed during the 2022 construction season.
W. Oklahoma Ave. - S. 84th St. to S. 100th St. (WT410190502) File Number 181686: Water main extension. (Nonassessable Water Fund Budget Line 5010 -- $0; Nonassessable Water Fund Budget Line 6410 -- $35,000). The total estimated cost of this project including the requested amount is $50,000. This project is anticipated to be completed during the 2022 construction season.
now, therefore, be it
Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
Mary Dziewiontkoski/dl
Nfr 5
11/12/2021