powered help
header-left header-center header-right
File #: 210946    Version:
Type: Resolution Status: Passed
File created: 10/12/2021 In control: COMMON COUNCIL
On agenda: Final action: 11/2/2021
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $75,000 for a total estimated cost of these projects being $1,075,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS

Number

210946

Version

Substitute 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $75,000 for a total estimated cost of these projects being $1,075,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $75,000 with the total cost estimated to be $1,075,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

13th Aldermanic District

 

W. Parnell Ave. - S. Marilyn St. to W. Ramsey Ave. (WT410220695)  File Number 201552:  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $0.  Nonassessable Water Fund Budget Line 6410 - $5,000 additional funding).  The total estimated cost of this project including the requested amount is $780,000.  This project is anticipated to be completed during the 2022 construction season. 

 

City Wide

 

Bridge Safety Inspection (BR100210102) File Number 201139: Federal and State mandated safety inspection of in-service bridges. (City share Non-assessable Structure Fund -- $50,000, Additional Funding). The total estimated cost for this project is $200,000.  This project is anticipated to be completed during the 2021 construction season.

 

Water Alterations - Developer Funded (WT430170300)  File Number 161153: Water Main Alterations. (Nonassessable Water Fund Budget Line 5010 -- $0.  Nonassessable Water Fund Budget Line 6410 - $20,000 additional funding).  The total estimated cost of this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2021 construction season. 

 

 

 

 

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/dl

Npr 3 Sub

10/05/2021