File #: 090662    Version:
Type: Resolution Status: Passed
File created: 9/22/2009 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 10/13/2009
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $150,000 for a total estimated cost of these projects being $1,350,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Cover Letter, 2. Sub 2 Fiscal note, 3. Fiscal note, 4. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
10/15/20092 MAYOR SIGNED   Action details Meeting details Not available
10/13/20092 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
9/30/20092 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
9/30/20091 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Individual present: Clark Wantoch, Dept. of Public Works Mr. Wantoch offered a proposed substitute A.
Pass5:0 Action details Meeting details Not available
9/30/20092 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass5:0 Action details Meeting details Not available
9/25/20091 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
9/24/20090 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
9/24/20090 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
9/22/20090 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
090662
Version
SUBSTITUTE 2
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $150,000 for a total estimated cost of these projects being $1,350,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $150,000 with the total cost estimated to be $1,350,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

9th Aldermanic District

Destiny School Biofiltration Project - 7210 N. 76th St. (SM493090108): Installation of biofiltration areas and a porous pavement. (Nonassessable Sewer Maintenance Relay Fund -- $25,000, TSS Removal Fund). The total estimated cost for this project including the requested amount is $250,000. This project is anticipated to be completed during the 2010 construction season.

12th and 14th Aldermanic Districts

Scour Protection for the S. 1st Street Bridge over the Kinnickinnic River (BR100090108), (City Share Non-assessable Structure Fund -- $100,000). The total estimated cost of this project, including the requested amount, is $100,000. This project is anticipated to be completed during the 2009 construction season.

City Wide

Sanitary manhole inspection (SM494090105): (Nonassessable Sewer Maintenance Relay Fund -- $15,000, I/I Reduction Fund). The total estimated cost for this project including the requested amount is $200,000. This project is anticipated to be completed during the 2010 construction season.

Various Locations

Stormwater Q...