File #: 210060    Version:
Type: Resolution Status: Passed
File created: 5/4/2021 In control: COMMON COUNCIL
On agenda: Final action: 5/25/2021
Effective date:    
Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $9,018,800 for a total estimated cost of these projects being $10,608,800
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS

 

Number

210060

Version

Substitute 1

Reference

191786

Sponsor

THE CHAIR

Title

Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $9,018,800 for a total estimated cost of these projects being $10,608,800

Analysis

This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works.  The City cost of the projects approved by this resolution is estimated to be $9,018,800.  The total estimated cost of these projects is $10,601,800.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and

 

Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:

 

1st Aldermanic District

 

W. Fairmount Ave. - N. 51st Blvd. to N. 60th St. (WT410210671) File Number 191786: Relaying water main and Extending water main.  (Nonassessable Water Fund Budget Line 5010 -- $0; Nonassessable Water Fund Budget Line 6410 -- $640,000). The total estimated cost of this project including the requested amount is $680,000.  This project is anticipated to be completed during the 2021 construction season.

 

W. Lancaster Ave. - N. 31st St to N. 33rd St. (WT410210678) File Number 191786: Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $0; Nonassessable Water Fund Budget Line 6410 -- $150,000). The total estimated cost of this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2021 construction season.

 

2nd, 7th, and 10th Aldermanic Districts

 

N. 60th St. - W. Burleigh St. to W. Capitol Dr. (SM499190017) File Number 191008: Storm water Trees (Storm Water Quality - Nonassessable Water Quality Fund -- $300,000).  The total estimated cost of this project including the requested amount is $330,000.  This project is anticipated to be completed during the 2021 construction season.

 

3rd Aldermanic District

 

E.  Roadsmeet St. - N. Dousman St. to N. Gordon Pl. (WT410210622) File Number 191657: Relaying water main and Replacement of lead services.  (Nonassessable Water Fund Budget Line 5010 -- $0; Nonassessable Water Fund Budget Line 6410 -- $140,000). The total estimated cost of this project including the requested amount is $155,000.  This project is anticipated to be completed during the 2021 construction season.

 

N. Dousman St. - E. Locust St. to 125’ N/O E. Roadsmeet St. (WT410210624) File Number 191657: Relaying water main and replacement of lead services. (Nonassessable Water Fund Budget Line 5010 -- $0; Nonassessable Water Fund Budget Line 6410 -- $235,000). The total estimated cost of this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2021 construction season.

 

N. Gordon Pl. - E. Roadsmeet St. to 125’ N/O E. Roadsmeet St. (WT410210623) File Number 191657: Relaying water main and replacement of lead services. (Nonassessable Water Fund Budget Line 5010 -- $0; Nonassessable Water Fund Budget Line 6410 -- $70,000). The total estimated cost of this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2021 construction season.

 

N. Humboldt Ave. - E. North Ave. to E. Keefe Ave. (WT410210692) File Number 200596: replacement of lead services. (Nonassessable Water Fund Budget Line 5010 -- $0; Nonassessable Water Fund Budget Line 6410 -- $1,875,000). The total estimated cost of this project including the requested amount is $2,000,000.  This project is anticipated to be completed during the 2021 construction season.

 

7th Aldermanic District

 

N. 58th St. - W. Hampton Ave. to W. Custer Ave. (WT410210664) File Number 191786: Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $0; Nonassessable Water Fund Budget Line 6410 -- $1,160,000). The total estimated cost of this project including the requested amount is $1,220,000.  This project is anticipated to be completed during the 2021 construction season.

 

9th Aldermanic District

 

N. 46th St. - W. Woolworth Ave. to W. Mill Rd. (WT410210636) File Number 191657: Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $0; Nonassessable Water Fund Budget Line 6410 -- $80,000). The total estimated cost of this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2021 construction season.

 

N. 51st St. - W. Mill Rd. to W. Green Tree Rd. (WT410210637) File Number 191657: Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $0; Nonassessable Water Fund Budget Line 6410 -- $930,000). The total estimated cost of this project including the requested amount is $970,000.  This project is anticipated to be completed during the 2021 construction season.

 

W. Bradley Rd. - N. 87th St. to N. 91st St. (ST211200138) File Number 200706: Asphalt surface overlay, rubblize existing concrete pavement. (Nonassessable Reconstruction Paving fund- $350,000).  The total estimated cost of this project including the requested amount is $375,000. This project is anticipated to be completed during the 2021 construction season.

 

W. Brown Deer Rd. - N. 69th St to N. 73rd St. (SM499200007) File Number 191786: Constructing bioswales (Storm Water Quality - Nonassessable Water Quality Fund -- $16,000).  The total estimated cost of this project including the requested amount is $26,000.  This project is anticipated to be completed during the 2021 construction season.

 

10th Aldermanic District

 

W. Burleigh St. - W. Lisbon Ave. to W. Appleton Ave. (SM499190018) File Number 191008: Storm water Trees (Storm Water Quality - Nonassessable Water Quality Fund -- $50,000).  The total estimated cost of this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2021 construction season.

 

11th Aldermanic District

 

W. Honey Creek Dr. - W. Morgan Ave. to W. River Bend Dr. (SM499200013) File Number 200707: Constructing bioswales (Storm Water Quality - Nonassessable Water Quality Fund -- $96,000).  The total estimated cost of this project including the requested amount is $111,000.  This project is anticipated to be completed during the 2021 construction season.

 

W. Morgan Ave. - S. 75th St. to S. Honey Creek Dr. (SM499200014) File Number 200817: Constructing Bioswales (Storm Water Quality - Nonassessable Water Quality Fund -- $265,800).  The total estimated cost of this project including the requested amount is $285,800.  This project is anticipated to be completed during the 2021 construction season.

 

15th Aldermanic District

 

N. 24th Pl. - 220’+/- S. of W. Walnut St. to W. Walnut St. (SM495200027) File Number 200229: Combined sewer relay (Nonassessable Sewer Maintenance Relay Fund -- $49,000).  The total estimated cost of this project including the requested amount is $61,000.  This project is anticipated to be completed during the 2021 construction season.

 

N. 29th St. - W. Cherry St. to W. Galena St. (SM495200028) File Number 200229: Combined sewer relay (Nonassessable Sewer Maintenance Relay Fund -- $130,000).  The total estimated cost of this project including the requested amount is $142,000.  This project is anticipated to be completed during the 2021 construction season.

 

N. 37th St. - W. Sarnow St. to W. Lisbon Ave. (SM495200073) File Number 201139: Combined sewer relay (Nonassessable Sewer Maintenance Relay Fund -- $121,000).  The total estimated cost of this project including the requested amount is $133,000.  This project is anticipated to be completed during the 2021 construction season.

 

N. 39th St. - W. Garfield Ave. to W. North Ave. (SM495200055) File Number 201065: Combined sewer relay (Nonassessable Sewer Maintenance Relay Fund -- $147,000).  The total estimated cost of this project including the requested amount is $159,000.  This project is anticipated to be completed during the 2021 construction season.

 

N. 39th St. - W. Roberts St. to W. Sarnow St. (SM495200072) File Number 201139: Combined sewer relay (Nonassessable Sewer Maintenance Relay Fund -- $201,000).  The total estimated cost of this project including the requested amount is $213,000.  This project is anticipated to be completed during the 2021 construction season.

 

N. 40th St. - 350’ +/- S. of W. Lisbon Ave. to W. Brown St. (SM495200038) File Number 200817: Combined sewer relay (Nonassessable Sewer Maintenance Relay Fund -- $236,000).  The total estimated cost of this project including the requested amount is $248,000.  This project is anticipated to be completed during the 2021 construction season.

 

N. 41st St. - W. Lisbon Ave. to W. Lloyd St. (SM495200039) File Number 200817: Combined sewer relay (Nonassessable Sewer Maintenance Relay Fund -- $119,000).  The total estimated cost of this project including the requested amount is $131,000.  This project is anticipated to be completed during the 2021 construction season.

 

W. Brown St. - N. 37th St. to N. 41st St. (SM495200042) File Number 200817: Combined sewer relay (Nonassessable Sewer Maintenance Relay Fund -- $107,000).  The total estimated cost of this project including the requested amount is $119,000.  This project is anticipated to be completed during the 2021 construction season.

 

W. Sarnow St. - N. 35th St. to N. 36th St. (SM495200063) File Number 201139: Combined sewer relay (Nonassessable Sewer Maintenance Relay Fund -- $66,000).  The total estimated cost of this project including the requested amount is $78,000.  This project is anticipated to be completed during the 2021 construction season.

 

Various Aldermanic Districts

 

ADA ramps for 2021 High impact paving central projects: (ST216210109) File Number 201552: Replace curb and gutter and sidewalk as necessary (Nonassessable High Impact Paving Fund -- $100,000 additional funds).  The total estimated cost of this project including the requested amount is $1,100,000.  This project is anticipated to be completed during the 2021 construction season.

 

Permanent Pavement repairs: (SM495210031) File Number 201669: Permanent Pavement replacement at Various locations (Nonassessable Sewer Maintenance Relay Fund -- $1,385,000). The total estimated cost of this project including the requested amount is $1,400,000. This project is anticipated to be completed during the 2021 construction season.

 

now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/dl

Nfr12 sub

05/04/2021