10/21/2019 | 0 |
CITY PLAN COMMISSION
| APPROVED
Minutes note: Individuals appearing:
Katherine Kawczynski, VJS Construction Services
Bryan Bedford, Bedford Development
Testifying with concerns:
Dennis Hasenfang, resident
A letter with concerns from Christine Heavey, resident, was read into the record.
Member Johnson moved conditional approval, seconded by member Washington. (Prevailed 5-0)
Condition:
Submittal of final documents that include the following changes:
1. Lighten the tone of the metal in the parking area along Water Street so that it blends in better with the balance of the building.
2. On the Water Street elevation, consolidate the two vents under the one window to the south of the main entrance into one and center it beneath the window. All vents should be painted to match the building materials.
3. Change the material at the entrance (corner of Pittsburgh and Water) from metal to masonry and change the shadow lines around the windows in the stair tower adjacent to the entrance so that they don't appear to be protruding from the brick.
4. Note the area along the first floor on the river-facing elevation where the future art component will be installed.
5. The rooftop HVAC screen should be a lighter tone metal.
6. Confirm that, while the balcony systems have changed from glass inset to a cable rail, the glass insets will remain at the points where the building steps back to create the roof terraces.
7. Provide additional details on the Riverwalk, including a zoomed-in cross section and how the planters and green screen will look along the Riverwalk. Provide plans that show the lighting, as previously requested.
8. Establish a maintenance agreement for the green screen. | Pass | 5:0 |
Action details
|
Meeting details
|
Video
|