Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,222,000 for a total estimated cost of $1,300,800.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Signed Letter Cycle 1.pdf, 2. Official Notice #23 -- September 11, 2019.pdf, 3. Proof of Publication
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
10/4/20191 MAYOR SIGNED   Action details Meeting details Not available
9/24/20191 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
9/11/20191 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 4th Aldermanic District N. 34th St. - W. Kilbourn Ave. to W. State St. (ST211190147) Install traffic calming speed hump(s). Paul McClain 3434 W Kilbourn Ave stated he doesn't see the need for the speed hump. Ald. Borkowski moved approval. (Prevailed 5-0) 6th Aldermanic District N. 2nd St. -- W. North Ave. to W. Center St. (ST211140116). Concrete pavement reconstruction, replace all curb and gutter, sidewalk and driveway approaches, narrow the roadway from 40 feet to 38 feet, sodding (12’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 5-0) N. 11th St. - W. Abert Pl. to W. Capitol Dr. (ST211190121) Install traffic calming speed hump(s). Ald. Kovac moved approval. (Prevailed 5-0) 12th Aldermanic District W. Becher St. - S. 18 th St. to S. 19 th St. (ST211190163) Install traffic calming speed hump(s). Ald. Murphy moved approval. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
9/4/20190 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

190741

Version

SUBSTITUTE 1

Reference

120112

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,222,000 for a total estimated cost of $1,300,800.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $1,222,000.  The total estimated cost of these projects is $1,300,800.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

4th Aldermanic District

 

N. 34th St. - W. Kilbourn Ave. to W. State St.  (ST211190147)  Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $6,000; Nonassessable Reconstruction Paving Fund -- $2,000) The total estimated cost for this project including the requested amount is $8,000.  This project is anticipated to be completed during the 2019 construction season.

 

6th Aldermanic District

 

N. 2nd St. -- W. North Ave. to W. Center St. (ST211140116)  Concrete pavement reconstruction, replace all curb and gutter, sidewalk and driveway approaches, narrow the roadway from 40 feet to 38 feet, sodding ( 12’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $91,200; Nonassessable Reconstruction Paving Fund -- $1,100,000). The total estimated cost for this project including the requested amount is $1,270,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 11th St. - W. Abert Pl. to W. Capitol Dr. (ST211190121)    Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $11,300; Nonassessable Reconstruction Paving Fund -- $2,000) The total estimated cost for this project including the requested amount is $13,300.  This project is anticipated to be completed during the 2019 construction season.

 

12th Aldermanic District

W. Becher St. - S. 18th St. to S. 19th St. (ST211190163)  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $4,000; Nonassessable Reconstruction Paving Fund -- $5,500) The total estimated cost for this project including the requested amount is $9,500.  This project is anticipated to be completed during the 2019 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That project   N. 34th St. (ST211190147); N. 11th St. (ST211190121); W. Becher St. (ST211190163) will be billed after January 1, 2021, but not before 12 months after the project contract has been completed;

 

Further Resolved, That project N. 2nd St. (ST211140116) will be billed after January 1, 2022, but not before 12 months after the project contract has been completed;

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/dl

Afr 1

09/05/2019