File #: 181863    Version:
Type: Resolution Status: Passed
File created: 3/26/2019 In control: COMMON COUNCIL
On agenda: Final action: 4/16/2019
Effective date:    
Title: Substitute resolution authorizing city-wide sidewalk replacement at scattered sites, and various areas and appropriating funds for these purposes with the city construction cost estimated to be $1,705,000 for a total estimated cost of these projects being $1,855,000.
Sponsors: THE CHAIR
Indexes: SIDEWALK IMPROVEMENTS, SIDEWALKS
Number
181863
Version
SUBSTITUE 1
Reference
181226
Sponsor
THE CHAIR
Title
Substitute resolution authorizing city-wide sidewalk replacement at scattered sites, and various areas and appropriating funds for these purposes with the city construction cost estimated to be $1,705,000 for a total estimated cost of these projects being $1,855,000.

Analysis
To provide the necessary authority for sidewalk repairs at scattered sites, and various areas. The City cost of these projects approved by this resolution is estimated to be $1,705,000. The total estimated cost of these projects is $1,855,000.

Whereas, It is necessary and in the public interest to replace those sidewalk stones which are cracked, broken, out of grade or otherwise a hazard to pedestrians; and

Whereas, It is proposed that sidewalk replacement work be done in the following locations at the indicated cost:

2019 Scattered Sites (ST230190160) File Number 181226 : Laying concrete walk. Doing all necessary grading pertaining to said work. (Assessable Sidewalk Reconstruction Paving Fund -- $100,000; Nonassessable Sidewalk Reconstruction Paving Fund -- $430,000). The total estimated cost for this project including the requested amount is $530,000. This project is anticipated to be completed during the 2019 construction season.

Area 1: Area bounded by E. Locust St., N. Maryland Ave., E. Kenwood Blvd., and N. Downer Ave. (ST230190157) File Number 181226: Laying concrete walk. Doing all necessary grading pertaining to said work. (Assessable Sidewalk Reconstruction Paving Fund -- $75,000; Nonassessable Sidewalk Reconstruction Paving Fund -- $188,000). The total estimated cost for this project including the requested amount is $263,000. This project is anticipated to be completed during the 2019 construction season.

Area 2: Area bounded by N. 47th St., W. Vliet St., N. 50th St./W. Hi Mount Blvd., and W. Vine St. (ST230190158) File Number 181226: Laying concrete walk. Doing all necessary g...

Click here for full text