powered help
header-left header-center header-right
File #: 181653    Version: 0
Type: Resolution Status: Passed
File created: 2/5/2019 In control: COMMON COUNCIL
On agenda: Final action: 3/26/2019
Effective date:    
Title: Resolution granting an easement to the Wisconsin Electric Power Company on City of Milwaukee owned property at 2275 North Lincoln Memorial Drive (Milwaukee Water Works North Point Pumping Station), and authorizing the proper City officers to execute the easement document. (Milwaukee Water Works)
Sponsors: THE CHAIR
Indexes: EASEMENTS, WISCONSIN ELECTRIC POWER COMPANY
Attachments: 1. Distribution Easement

Number

181653

Version:

Original

Reference

 

Sponsor

The Chair

Title

Resolution granting an easement to the Wisconsin Electric Power Company on City of Milwaukee owned property at 2275 North Lincoln Memorial Drive (Milwaukee Water Works North Point Pumping Station), and authorizing the proper City officers to execute the easement document.

(Milwaukee Water Works)

Analysis

This resolution grants an easement to the Wisconsin Electric Power Company, for the

construction, installation, operation, maintenance, repair, replacement and extension of underground utility facilities, conduit and cables, electric pad-mounted transformers, manhole, electric pad-mounted switch-fuse units, electric pad-mounted vacuum fault interrupter, concrete slabs, power pedestals, riser equipment, terminals and markers, together with all necessary and appurtenant equipment under and above ground as deemed necessary by Grantee, all to transmit electric energy, signals, television and telecommunication services, including the customary growth and replacement thereof at 2275 North Lincoln Memorial Drive (Milwaukee Water Works North Point Pumping Station).

Body

Whereas, the Wisconsin Electric Power Company provides electric energy, signals, television, and telecommunication services to the City of Milwaukee owned property at 2275 North Lincoln Memorial Drive (Milwaukee Water Works North Point Pumping Station); and

 

Whereas, The Wisconsin Electric Power Company requires a permanent easement, as shown on Exhibit “A” and described on Exhibit “B” of the attached easement document, on said property; and

 

Whereas, the Department of Public Works has reviewed the above document; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that said easement document, a copy of which has been made part of this file, is hereby approved and granted to the Wisconsin Electric Power Company and the proper City officials, including the Commissioner of Public Works, are hereby authorized to execute the easement document on the City’s behalf, and, be it

 

Further Resolved, That after said easement document has been executed by the proper City officials, it shall be forwarded to the Department of Public Works for further processing.

 

 

Requestor

Department of Public Works

Milwaukee Water Works

Drafter

Water Engineering Section

Patrick W. Pauly                     

February 5, 2019