Title: Resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $2,325,000 for a total estimated cost of these projects being $24,444,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS

 

Number

181588

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $2,325,000 for a total estimated cost of these projects being $24,444,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $2,325,000 with the total cost estimated to be $24,444,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

1st Aldermanic District

 

W. Rohr Ave. - 300’ east of N. 24th St. to N. 24th St. (WT410200606) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $3,000; (Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 24th St. - W. Rohr Ave. to W. Custer Ave. (WT410200605) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 27th St. - Bioretention Maintenance Contract

N. 27th St. - W. Capitol Dr. to W. Roosevelt Dr. (SM499190001) (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $1,000.  The total estimated cost of this project including the requested amount is $21,000.  This project is anticipated to be completed during the 2019 construction season. 

 

2nd Aldermanic District

 

W. Bobolink Ave. - N. 68th St. to N. 70th St. (WT410200637)  Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Florist Ave. - N. 65th St. to N. 76th St. (WT410200633) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $14,000;Nonassessable Water Fund Budget Line 6410 -- $41,000). The total estimated cost of this project including the requested amount is $900,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Glendale Ave. - N. 66th St. to N. 67th St. (WT410200662) Water main extension.

(Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Hope Ave. - N. 66th St. to N. 73rd St. (WT410200666) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $9,000; Nonassessable Water Fund Budget Line 6410 -- $26,000). The total estimated cost of this project including the requested amount is $555,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Marion St. - N. 60th St. to N. 66th St. (WT410200667) Relaying and extending water main.

(Nonassessable Water Fund Budget Line 5010 -- $9,000; Nonassessable Water Fund Budget Line 6410 -- $26,000). The total estimated cost of this project including the requested amount is $500,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Stark St. - N. 64th St. to N. 67th St. (WT410200646) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $16,000). The total estimated cost of this project including the requested amount is $240,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 63rd St. - W. Fiebrantz Ave. to W. Hope Ave. (WT410200657) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $145,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 63rd St. - W. Marion St. to W. Congress St. (WT410200658) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 66th St. - W. Congress St. to W. Medford Ave. (WT410200659) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $22,000).

 The total estimated cost of this project including the requested amount is $495,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 67th St. - W. Congress St. to W. Glendale Ave. (WT410200661) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $335,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 67th St. - W. Hope Ave to W. Marion St. - (WT410200660) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 67th St. - W. Fond du Lac Ave to W. Stark St. (WT410200647) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $175,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 69th St. - W. Marion St. to W. Glendale Ave. (WT410200663) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $22,000). The total estimated cost of this project including the requested amount is $495,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 70th St. - W. Capitol Dr. to W. Congress St. (WT410200664) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $10,000;Nonassessable Water Fund Budget Line 6410 -- $30,000).The total estimated cost of this project including the requested amount is $650,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 71st St. - W. Bobolink Ave. to W. Florist Ave.  (WT410200634) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 71st St. - W. Capitol Dr. to W. Congress St. (WT410200665) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $30,000). The total estimated cost of this project including the requested amount is $650,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 72nd St. - W. Bobolink Ave. to W. Florist Ave. (WT410200635) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $155,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 73rd St. - W. Bobolink Ave. to W. Florist Ave. (WT410200636)  Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $175,000.  This project is anticipated to be completed during the 2020 construction season. 

 

3rd Aldermanic District

 

E. Kenwood Blvd. - N. Lake Dr. to 950’ east of N. Lake Dr. (WT410200643) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $16,000). The total estimated cost of this project including the requested amount is $240,000.  This project is anticipated to be completed during the 2020 construction season.  

 

E. Linnwood Ave. - N. Downer Ave. to N. Lake Dr. (WT410200642) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $385,000.  This project is anticipated to be completed during the 2020 construction season. 

 

4th Aldermanic District

 

W. St. Paul Ave. - N. 27th St. to N. 35th St. (SM495190012) Relaying combined sewer.

(Nonassessable Sewer Maintenance Relay Fund -- $20,000).  The total estimated cost of this project including the requested amount is $1,816,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 19th St. - W. McKinley Ave. to W. 19th Ct. (WT410200655) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 32nd St. - W. Mt. Vernon Ave. to W. St. Paul Ave.(SM495190010) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).   

The total estimated cost of this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2020 construction season. 

 

5th Aldermanic District

 

W. Auer Ave. - N. 89th St. to N. 97th St. (WT410200624) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $30,000). The total estimated cost of this project including the requested amount is $675,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Beckett Ave. - W. Ruby Ave. to W. Glendale Ave. (WT410200628) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000).The total estimated cost of this project including the requested amount is $185,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. Colonial Dr. - W. Auer Ave. to W. Concordia Ave. (WT410200623) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $3,000).

(Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $190,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Concordia Ave. - N. 82nd St. to N. 87th St. (WT410200619) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $22,000). The total estimated cost of this project including the requested amount is $425,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Concordia Ave. - N. 89th St. to N. 98th St. (WT410200620) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $11,000; Nonassessable Water Fund Budget Line 6410 -- $34,000). The total estimated cost of this project including the requested amount is $775,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Congress St. - N. 91st St. to N. 92nd St. (WT410200672) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Fiebrantz Ave. (Include Cul de Sac) - N. 100th St. to W. Grantosa Dr. (WT410200627) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $16,000). The total estimated cost of this project including the requested amount is $225,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Glendale Ave. - N. 76th to N. 82nd St. (WT410200632) Relaying water main

Water main extension. (Nonassessable Water Fund Budget Line 5010 -- $9,000; Nonassessable Water Fund Budget Line 6410 -- $26,000).The total estimated cost of this project including the requested amount is $525,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Glendale Ct. - N. Houston Ave. to 270’ west of N. Houston Ave. (WT410200631) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $3,000); Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $65,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Hampton Ave. (south side) - N. 84th St. to N. 90th St. (WT410200644) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $9,000; Nonassessable Water Fund Budget Line 6410 -- $26,000). The total estimated cost of this project including the requested amount is $500,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. Houston Ave. - W. Congress St. to W. Courtland Ave. (WT410200630) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $22,000).  The total estimated cost of this project including the requested amount is $490,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Lawrence Ave. - N. 88th St. to N. 91st St. (WT410200671) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $16,000). The total estimated cost of this project including the requested amount is $255,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Vienna Ave. - N. 76th St. to N. 80th St. (WT410200645) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000).The total estimated cost of this project including the requested amount is $325,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 83rd St. - W. Burleigh St. to W. Concordia Ave. (WT410200621) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $325,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 88th St. - W. Congress St. to W. Lawrence Ave. (WT410200670) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 96th St. - N. Colonial Dr. to 240’ north of W. Auer Ave.  (WT410200622) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Water Fund Budget Line 6410 -- $16,000). The total estimated cost of this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2020 construction season. 

 

6th Aldermanic District

 

W. Columbia St. - N. 13th St. to N. 14th St. (SM495190011) Relaying combined sewer.

(Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost of this project including the requested amount is $122,000.  This project is anticipated to be completed during the 2020 construction season. 

 

7th Aldermanic District

 

W. Hampton Ave. (south side) - N. Sherman Blvd. to N. 46th St. (WT410200648) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $16,000). The total estimated cost of this project including the requested amount is $230,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Hampton Ave. (south side) - N. 48th St. to N. 51st Blvd. (WT410200649) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $16,000). The total estimated cost of this project including the requested amount is $225,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 48th St. -W. Parkway Dr. to W. Glendale Ave. (WT410200651) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $190,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 49th St. - W. Parkway Dr. to W. Hampton Ave. (WT410200650) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $22,000). The total estimated cost of this project including the requested amount is $440,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 53rd St. - W. Glendale Ave. to W. Hampton Ave. (WT410200652) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $330,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 56th St. - W. Parkway Dr. to W. Hampton Ave. (WT410200653) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $330,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 57th St. - W. Parkway Dr. to W. Hampton Ave. (WT410200654) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $16,000). The total estimated cost of this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2020 construction season. 

 

7th and 15th Aldermanic Districts

 

N. Sherman Blvd. Bioretention Maintenance Contract

N. Sherman Blvd. - W. North Ave. to W. Congress St.  (SM499190002)  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $1,000.

The total estimated cost of this project including the requested amount is $45,000.  This project is anticipated to be completed during the 2019 construction season. 

 

8th Aldermanic District

 

W. Grant St. - S. 33rd St. to S. 34th St. (SM494190012) Relaying sanitary sewer.

 (Infiltration/Inflow Reduction Fund -- $12,000).   The total estimated cost of this project including the requested amount is $101,000.  This project is anticipated to be completed during the 2019 construction season.

 

 W. Lincoln Ave. - S. 33rd St. to S. 34th St. (SM494190010)  Relaying sanitary sewer

 (Infiltration/Inflow Reduction Fund -- $12,000.  The total estimated cost of this project including the requested amount is $89,000.  This project is anticipated to be completed during the 2019 construction season. 

 

S. 34th St. - W. Grant St. to W. Arthur Ave. (SM494190011) Relaying sanitary sewer

 (Infiltration/Inflow Reduction Fund -- $15,000.  The total estimated cost of this project including the requested amount is $375,000.  This project is anticipated to be completed during the 2019 construction season. 

 

10th Aldermanic District

 

N. 94th St. - W. Blue Mound Rd. to W. Wisconsin Ave. (WT410200604)  Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $16,000  The total estimated cost of this project including the requested amount is $225,000.  This project is anticipated to be completed during the 2020 construction season. 

 

11th Aldermanic District

 

W. Paine St. - W. Lakefield Dr. to S. 33rd St. (WT410200626) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2020 construction season. 

 

S. Sunset Dr. - W. Morgan Ave. to S. Massachusetts Ave. (WT410200638) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $22,000). The total estimated cost of this project including the requested amount is $490,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Tripoli Ave. - S. Massachusetts Ave. to S. 73rd St. (WT410200639) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $390,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Warnimont Ave. - S. 78th St. to S. 81st St. (WT410200656) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $16,000). The total estimated cost of this project including the requested amount is $240,000.  This project is anticipated to be completed during the 2020 construction season. 

 

S. 33rd St.-- W. Paine St. to W. Verona Ct. (WT410200625) Relaying water main. Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2020 construction season.

 

S. 74th St. - W. Van Beck Ave. to W. Waterford Ave. (WT410200640) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $16,000). The total estimated cost of this project including the requested amount is $220,000.  This project is anticipated to be completed during the 2020 construction season. 

 

S. 75th St. - W. Van Beck Ave. to W. Waterford  Ave.  (WT410200641) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $16,000). The total estimated cost of this project including the requested amount is $225,000.  This project is anticipated to be completed during the 2020 construction season. 

 

S. 95th St. - W. Oklahoma Ave. to W. Beloit Rd. (WT410200668) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $16,000).The total estimated cost of this project including the requested amount is $290,000.  This project is anticipated to be completed during the 2020 construction season. 

 

S. 98th St. - W. Oklahoma Ave. to W. Beloit Rd. (WT410200669) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $22,000). The total estimated cost of this project including the requested amount is $490,000.  This project is anticipated to be completed during the 2020 construction season. 

 

13th Aldermanic District

 

W. Alvina Ave. - S. 1st St. to 640’ west of S.1st St. (WT410200601) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Fardale Ave. - W. Loomis Rd. to S. Miner St. (WT410200618) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $16,000). The total estimated cost of this project including the requested amount is $220,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Grange Ave.- 900’ east of S. 20th St. to S. 27th St. (WT410200608) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $14,000; Nonassessable Water Fund Budget Line 6410 -- $41,000). The total estimated cost of this project including the requested amount is $935,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Mangold Ave. --  S. 1st St. to 570’ west of S. 1st St. (WT410200602) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $3,000;Nonassessable Water Fund Budget Line 6410 -- $12,000).  The total estimated cost of this project including the requested amount is $145,000.  This project is anticipated to be completed during the 2020 construction season. 

 

W. Maplewood Ct. - S. 14th St. to S. 15th Pl. (WT410200615) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $16,000). The total estimated cost of this project including the requested amount is $210,000.  This project is anticipated to be completed during the 2020 construction season. 

 

S. Miner St. - W. Fardale Ave. to W. Howard Ave. (WT410200617) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $175,000.  This project is anticipated to be completed during the 2020 construction season. 

 

S. 3rd St. - W. Uncas Ave. to W. College Ave. (WT410200603) Relaying water main

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $16,000).  The total estimated cost of this project including the requested amount is $230,000.  This project is anticipated to be completed during the 2020 construction season. 

 

S. 15th Pl. - W. Mallory Ave. to W. Maplewood Ct. (WT410200616) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2020 construction season. 

 

City of Greenfield

 

S. 27th St. - W. Abbot Ave. to W. Grange Ave. (WT410200607) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $9,000; Nonassessable Water Fund Budget Line 6410 -- $26,000). The total estimated cost of this project including the requested amount is $500,000.  This project is anticipated to be completed during the 2020 construction season. 

 

City Wide

 

Bridge indirect and Administration (BR100190101)  Preliminary engineering and administration of bridge projects.  (City share Non-assessable Structure Fund $100,000).  The total estimated cost of this project is $100,000.  This project is anticipated to be completed during the 2019 construction season. 

 

Bridge Safety Inspection (BR100190102): Federal and State mandated safety inspection of in-service bridges. (City share Non-assessable Structure Fund $125,000). The total estimated cost for this project is $125,000. This project is anticipated to be completed during the 2019 construction season.

 

Handicap Ramp work to meet ADA requirements for 2016 High Impact Projects (ST216170109):  (Nonassessable High Impact Streets -- $500,000, additional funds).  The total estimated cost for this project including the requested amount is $1,500,000.  This project is anticipated to be completed during the 2019 construction season.

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/dl

Npr 8 Sub

01/29/2019