powered help
header-left header-center header-right
File #: 090194    Version:
Type: Resolution Status: Passed
File created: 6/16/2009 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 7/7/2009
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $576,000 for a total estimated cost of these projects being $14,916,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Cover Letter, 2. Fiscal note, 3. Hearing Notice List

Number

090194

Version

SUBSTITUTE 2

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $576,000 for a total estimated cost of these projects being $14,916,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $576,000 with the total cost estimated to be $14,916,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

1st Aldermanic District

 

W. Villard Ave. - N. 32nd St. to a point west of N. 32nd St. (ST211090149): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $15,000).  The total estimated cost for this project is $15,000.  This project is anticipated to be completed during the 2009 construction season.

 

1st, 6th and 7th Aldermanic Districts

 

Area bounded by W. Capitol Dr., W. Nash St., N. 27th St. and N. 31st St. (SM495090063): Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $609,000.  This project is anticipated to be completed during the 2009 construction season.

 

2nd, 5th and 10th Aldermanic Districts

 

Alley bounded by W. Hampton Ave., W. Nash St., N. 68th St., and N. 91st St. (SM495090056): Install storm sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $2,673,000.  This project is anticipated to be completed during the 2010 construction season.

 

3rd and 4th Aldermanic Districts

 

Juneau Avenue Bascule Bridge over the Milwaukee River (BR100090106): Structural steel repairs and painting. (City Share Nonassessable Structure Fund -- $300,000).  The total estimated cost for this project including the requested amount is $8,300,000.  This project is anticipated to be completed during the 2010-2011 construction season.

 

6th Aldermanic District

 

Alley bounded by E. Fiebrantz Ave., N. Hubbard St., N. Richards St., Lands North (SM495090058): Installing storm sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2010 construction season.

 

8th Aldermanic District

 

N. 25th St. at W. Canal St. (SM493090107): Maintenance of Bioretention Facility at N. 25th St. and W. Canal St. (Nonassessable TSS (Total Suspended Solids) Removal Fund -- $1,000).  The total estimated cost for this project including the requested amount is $26,000.  This project is anticipated to be completed during the 2009 construction season.

 

10th Aldermanic District

 

N. 59th St. - 300 feet m/l south of W. St. Paul Ave. to W. Blue Mound Rd. (SM495090060): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $141,000.  This project is anticipated to be completed during the 2009 construction season.

 

11th Aldermanic District

 

Area bounded by W. Wilbur Ave to W. Howard Ave. and S. 51st St. to S. 53rd St. (SM495090062): Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $932,000.  This project is anticipated to be completed during the 2009 construction season.

 

12th Aldermanic District

 

S. Cesar E. Chavez Dr. - W. Greenfield Ave. to a point north of W. Pierce St. (ST320XXXXXX): Paving the roadway with asphalt, curb and gutter, sidewalk and other amenities. (Nonassessable Major Street Improvement Fund -- $145,000).  The total estimated cost for this project, including the requested amount is $1,250,000.  This project will be constructed in 2010 using 100 percent ARRA Funds for construction.

 

13th Aldermanic District

 

S. 6th St. - 1700 feet north of W. College Ave. to 300 feet north of W. College Ave. (WT410100016): Relaying water main. (Nonassessable Water Fund -- $25,000).  The total estimated cost for this project including the requested amount is $380,000.  This project is anticipated to be completed during the 2010 construction season.

 

S. 17th St. - W. Ohio Ave. to W. Crawford Ave. (SM495090059): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $520,000.  This project is anticipated to be completed during the 2010 construction season.

 

; and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

MLD:dr

Npr 14

06/19/09