powered help
header-left header-center header-right
File #: 181468    Version:
Type: Resolution Status: Passed
File created: 1/14/2019 In control: COMMON COUNCIL
On agenda: Final action: 2/5/2019
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $12,796,662.42.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Official Notice #56, 2. Signed letter.pdf, 3. 181468 - Vliet Certificate.pdf, 4. 181468 - Teutonia Certificate.pdf
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
2/15/20191 MAYOR SIGNED   Action details Meeting details Not available
2/5/20191 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
1/23/20190 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW Aldermanic Districts 4 and 15 W. Vliet St. – N. 12th St. to N. 27th St. (ST320140901) Concrete pavement reconstruction, replace all curb and gutter, sidewalk and driveway approaches, sodding (No tree border), and grading. Ald. Borkowski moved approval. (Prevailed 5-0) Aldermanic Districts 6 and 15 N. Teutonia Ave. – W. Garfield Ave. to W. Groeling Ave. (ST320140701) Concrete pavement reconstruction, replace all curb and gutter, sidewalk and driveway approaches, sodding (No tree border), and grading. Ald. Kovac moved approval. (Prevailed 5-0) Ald. Murphy moved approval. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
1/14/20190 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number
181468
Version
SUBSTITUTE 1
Reference
140427
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $12,796,662.42.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $12,796,662.42.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

4th and 15th Aldermanic Districts

W. Vliet St. - N. 27th St. to N. 12th St. (ST320140901) (2984-00-03) File Number 140427: Concrete pavement reconstruction, replace curb and gutter, sidewalk and driveway approaches as necessary, signals, street lighting and storm sewer.

Grantor Non-Reimbursable Paving Fund -- $2,419,116.52
Grantor Reimbursable Paving Fund -- $362,867.48
City Share Assessable Paving Fund -- $32,000.00
City Share Non Assessable Paving Fund --$2,110,871.99

These funds are to be transferred to the construction account (ST3201409xx) (2984-00-73)

Street Lighting (ST240190400) Funded in Resolution 181196 -- $450,000.00
Underground Conduit (ST280190200) Funded in Resolution 181194 -- $650,000.00

Previously authorized for project construction: $0.00

Current estimated cost of total project including this resolution: $6,499,355.99
Original estimated cost of the project: (File Number 140427): $4,095,480.00

This project is anticipated to be completed during the 2019...

Click here for full text