powered help
header-left header-center header-right
File #: 090107    Version:
Type: Resolution Status: Passed
File created: 5/27/2009 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 6/16/2009
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $65,000 for a total estimated cost of these projects being $503,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Revised Fiscal note, 2. Fiscal Note, 3. Cover Letter, 4. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
6/25/20091 MAYOR SIGNED   Action details Meeting details Not available
6/16/20091 COMMON COUNCIL ADOPTEDPass14:0 Action details Meeting details Not available
6/3/20091 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Individual present: Clark Wantoch, Dept. of Public Works, Infrastructure
Pass5:0 Action details Meeting details Not available
5/29/20090 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
5/27/20090 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

090107

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $65,000 for a total estimated cost of these projects being $503,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $65,000 with the total cost estimated to be $503,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

2nd and 9th Aldermanic Districts

 

N. 56th St. - W. Custer Ave. to W. Sheridan Ave. (SM495090055): Relaying sanitary and storm sewers. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $228,000.  This project is anticipated to be completed during the 2010 construction season.

 

3rd and 4th Aldermanic Districts

 

N. Prospect Ave. at E. Royall Pl. (ST211090147): Install traffic calming devices. (Nonassessable Reconstruction Paving Fund -- $5,000).  The total estimated cost for this project including the requested amount is $20,000.  This project is anticipated to be completed during the 2009 construction season.

 

4th Aldermanic District

 

N. 25th St. - W. St. Paul Ave. to W. Clybourn St. (WT410091015): Relaying water main and lining. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2009 construction season.

 

6th Aldermanic District

 

N. Port Washington Ave. - W. Vienna Ave. to W. Abert Pl. (SM495090054): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $105,000.  This project is anticipated to be completed during the 2010 construction season.

 

13th Aldermanic District

 

S. Louisiana Ave. (Ext’d) - A point 15 feet m/l south of W. Van Norman Ave. to a point 625 feet m/l south of W. Van Norman Ave. (SM495090053): Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $63,000.  This project is anticipated to be completed during the 2010 construction season.

 

; and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

MLD:dr

Npr 13

05/29/09

 

6/8/09 Techncial corrections made to the total estimated cost, from $50,000 to $65,000. TJM.