File #: 090012    Version:
Type: Resolution Status: Passed
File created: 5/5/2009 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 5/27/2009
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $220,000 for a total estimated cost of these projects being $2,879,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Cover Letter, 2. Fiscal note, 3. Hearing Notice List
Number
090012
Version
SUBSTITUTE 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $220,000 for a total estimated cost of these projects being $2,879,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $220,000 with the total cost estimated to be $2,879,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

1st and 7th Aldermanic Districts

W. Hampton Ave. - N. Sherman Blvd. to N. 55th St. (ST211090145): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $25,000). The total estimated cost for this is $25,000. This project is anticipated to be completed during the 2009 construction season.

5th Aldermanic District

Hartung Quarry Water Quality Detention Facility (SM493090103): (Nonassessable Sewer Fund-TSS Removal Fund -- $20,000). The total estimated cost for this project including the requested amount is $750,000. This project is anticipated to be completed during the 2009 construction season.

8th Aldermanic District

W. Pierce St. - S. 38th St. to S. 39th St. (WT410100014): Relaying water main. (Nonassessable Water Fund -- $15,000). The total estimated cost for this project including the requested amount is $64,000. This project is anticipated to be completed during the 2010 construction season.

S. 39th St. - W. Pierce...