File #: 180294    Version:
Type: Resolution Status: Passed
File created: 5/30/2018 In control: COMMON COUNCIL
On agenda: Final action: 6/20/2018
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $50,000 for a total estimated cost of these projects being $2,024,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS

Number

180294

Version

Substitute 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $50,000 for a total estimated cost of these projects being $2,024,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $50,000 with the total cost estimated to be $2,024,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

6th Aldermanic District

 

N. Port Washington Rd. - W. Hampton Ave. to 150’ north of W. Hampton Ave.  (WT410180015) Hydrant alteration.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000.)  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2018 construction season.

 

13th  Aldermanic District

 

S. 3rd St. - W. Grange Ave. to W. Edgerton Ave. (SM499180116) Bioswales (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $15,000). The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2019 construction season.

 

15th Aldermanic District

 

N. 26th St. - 200’+/- north of W. North Ave. to W. Wright St.  (SM495180034) Slip lining combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $20,000.  The total estimated cost for this project including the requested amount is $1,864,000.  This project is anticipated to be completed during the 2018 construction season.

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/dl

Npr13 Sub

05/22/2018