powered help
header-left header-center header-right
File #: 180158    Version:
Type: Resolution Status: Passed
File created: 5/8/2018 In control: COMMON COUNCIL
On agenda: Final action: 5/30/2018
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $8,500,800.05 for a total estimated cost of $10,865,657.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. LTR-AFR - signed.pdf, 2. Official Notice.pdf, 3. Notice Published on June 15
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
6/15/20181 CITY CLERK PUBLISHED   Action details Meeting details Not available
6/8/20181 MAYOR SIGNED   Action details Meeting details Not available
5/30/20181 COMMON COUNCIL ADOPTEDPass12:0 Action details Meeting details Video Video
5/16/20181 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 6th Aldermanic District N. Buffum St. – E. North Ave. to E. Meinecke Ave. (ST211170138) Install traffic calming speed hump(s). Ald. Borkowski moved approval. (Prevailed 4-0) N. Palmer St. – E. Vine St. to E. Reservoir Ave. (ST211180131) Install traffic calming speed hump(s). Ald. Murphy moved approval. (Prevailed 4-0) N. Richards St. – E. Capitol Dr. to a point north of E. Hope Ave. (ST211150156) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding ( 4’ width of tree border area), and grading. Earl Gruenewald 4105 N Richards stated he owns several properties in the area and he believes the sidewalk looks good. Ald. Donovan moved to hold to the call of the chair. (Prevailed 5-0) N. 1st St. – E. Vine St. to E. Reservoir Ave. (ST211180122) Install traffic calming speed hump(s). Ald. Borkowski moved approval. (Prevailed 5-0) N. 5th St. – W. North Ave. to W. Wright St. (ST211160125) Install traffic calming speed hump(s). Teresa Garrison 2808 N 5th St stated no one stops at the 4 way stop Betty Coleman 2355 N 5th St stated she is in support of the speed humps. Shirley Daniels 507A W Meinecke is in favor of the speed humps. Ald. Kovac moved approval. (Prevailed 5-0) 7th Aldermanic District W. Hope Ave.-- N. Sherman Blvd. to N. 51st Blvd. (ST211180111) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding ( 5’ width of tree border area), and grading. Sherman Morton – 7th District Legislative Assistant stated Ald. Rainey is in support. Ald. Kovac moved approval. (Prevailed 5-0) N. 38th St. – N. Elmhurst Rd. to N. Montreal St. (ST211180103) Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding ( 6’ width of tree border area), and grading. Sherman Morton – 7th District Legislative Assistant stated Ald. Rainey is in support. Ald. Borkowski moved approval. (Prevailed 5-0) 10th Aldermanic District N. 52nd St. -- W. Lisbon Ave. to W. Center St. (ST211180116) Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (5’ width of tree border area), and grading. Ald. Murphy moved approval. (Prevailed 5-0) 13th Aldermanic District S. Howell Ave. – W. Grange Ave. to a point north of E./W. Layton Ave. (ST320070201) Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (4’ width of tree border area), and grading. Ald. Donovan moved approval. (Prevailed 5-0) S. 19th St. - W. Edgerton Ave. to a point 100’ North of W. Halsey Ave. (ST211150108) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7’ width of tree border area), and grading. Tom Balistreri 5000 S 19th St stated he does not want the sidewalk. Ald. Murphy moved approval. (Prevailed 5-0) S. 23rd St. - W. Clayton Crest Ave. to W. Abbott Ave. (ST211160130) Install traffic calming speed hump(s). Karen Francis 2361 S 23rd St stated she objects because she wants a stop sign. Scott Spiker 13th District Legislative Assistant stated most residents were in support based on the postcard survey. Ald. Kovac moved approval. (Prevailed 5-0) 14th Aldermanic District S. Clement Ave. - S. Kinnickinnic Ave. to E. Russell Ave. (ST211180117) Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (5’ width of tree border area), and grading. Susan Ali 2683 S Clement Ave stated she does not want her sidewalk redone. Ald. Murphy moved approval. (Prevailed 5-0) Ald. Kovac moved approval as amended. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
5/8/20180 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
180158
Version
SUBSTITUTE 1
Reference
140037
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $8,500,800.05 for a total estimated cost of $10,865,657.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $8,500,800.05. The total estimated cost of these projects is $10865,657.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

6th Aldermanic District

N. Buffum St. - E. North Ave. to E. Meinecke Ave. (ST211170138) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,500; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,500. This project is anticipated to be completed during the 2018 construction season.

N. Palmer St. - E. Vine St. to E. Reservoir Ave. (ST211180131) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $5,100; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $7,100. This project is anticipated to be completed during the 2018 construction season.

N. 1st St. - E. Vine St. to E. Reservoir Ave. (ST211180122) Install traffic calming speed hump(s). (Assessable Reconstructio...

Click here for full text