File #: 171854    Version:
Type: Resolution Status: Passed
File created: 3/27/2018 In control: COMMON COUNCIL
On agenda: Final action: 4/17/2018
Effective date:    
Title: Resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $2,129,000 for a total estimated cost of these projects being $28,018,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS

Number

171854

Version

Substitute 1

Sponsor

THE CHAIR

Title

Resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $2,129,000 for a total estimated cost of these projects being $28,018,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $2,129,000 with the total cost estimated to be $28,018,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

1st Aldermanic District

 

Alley between W. Fairmount Ave., N. 51st St. and N. 53rd St. (SM499180006): Install permeable pavers (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $1,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 11th St. - W. Birch Ave. to W. Silver Spring Dr. (WT410190674)  Relaying water main.(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 27th St.-W. Capitol Dr. to W. Roosevelt Dr. (SM499180008): Bioretention maintenance contract (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $1,000).  The total estimated cost for this project including the requested amount is $21,000.  This project is anticipated to be completed during the 2018 construction season.

 

2nd Aldermanic District

 

W. Colfax Ct. - W. Kathryn Ave. to 500’ West of  W. Kathryn Ave. (WT410190645) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000.  The total estimated cost for this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Fairmount Ave.  - W. Medford Ave. to N. 76th St. (WT410190653)  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost for this project including the requested amount is $305,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Gertrude Dr./ W. Lancaster Ave. - W. Palmetto Ave. to N. 83rd St. (WT410190646) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $22,000).  The total estimated cost for this project including the requested amount is $495,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Herbert Ave. --  W. Kathryn Ave. to N. 84th St.  (WT410190648)  Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $30,000).  The total estimated cost for this project including the requested amount is $630,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Kathryn Ave./ W. Fairmount Ave. - N.77th St. to N. 84th St. (WT410190649)  Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $30,000).  The total estimated cost for this project including the requested amount is $660,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Kathryn Ct. - W. Kathryn Ave. to 225’ West of W. Kathryn Ave. (WT410190650) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000.) The total estimated cost for this project including the requested amount is $55,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Lancaster Ave. - N. 64th St. to N. 69th St. (WT410190619) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000.) The total estimated cost for this project including the requested amount is $385,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 65th St. - W. Silver Spring Dr. to W. Carmen Ave.  (WT410190662) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000.  The total estimated cost for this project including the requested amount is $315,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 66th St. - W. Lancaster Ave. to W. Villard Ave.  (WT410190618)  Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $15,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 66th St. - W. Silver Spring Dr. to W. Thurston Ave. (WT410190663) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000).  The total estimated cost for this project including the requested amount is $155,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 68th St. - W. Silver Spring Dr. to W. Florist Ave. (WT410190664) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $30,000).  The total estimated cost for this project including the requested amount is $645,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 70th St. - W. Silver Spring Dr. to W. Bobolink Ave.  (WT410190661) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $22,000). The total estimated cost for this project including the requested amount is $475,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 74th St. - W. Hampton Ave. to W. Medford Ave.  (WT410190652) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $9,000; Nonassessable Water Fund Budget Line 6410 -- $26,000). The total estimated cost for this project including the requested amount is $515,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 82nd St. - W. Grantosa Dr. to W. Kathryn Ave.  (WT410190651) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $155,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 83rd St. - W. Fairmount Ave. to W. Sheridan Ave.  (WT410190647) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $9,000; Nonassessable Water Fund Budget Line 6410 -- $26,000).  The total estimated cost for this project including the requested amount is $580,000.  This project is anticipated to be completed during the 2019 construction season.

 

2nd and 5th Aldermanic District

Area bounded by W. Capitol Dr., W. Congress St., N. 68th St and  N. 76th St (SM494180015); Building  sanitary sewer lateral lining.  (Infiltration/Inflow Reduction Fund -- $20,000. The total estimated cost for this project including the requested amount is $2,739,000.  This project is anticipated to be completed during the 2019 construction season.

 

3rd Aldermanic District

 

N. Dousman St. - 100’ +/- N. of E. Auer Ave. to 475’ +/- North of E. Auer Ave. (SM495180017) Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000.  The total estimated cost for this project including the requested amount is $112,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. Newhall St. - E. Locust St. to E. Linnwood Ave. (WT410190600)  Relaying water main.(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000).  The total estimated cost for this project including the requested amount is $185,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. Prospect Ave. . - E. Knapp St. to easement East of N. Prospect Ave. (SM495180016) Sanitary sewer relay and lining and relaying storm sewer.(Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $189,000.  This project is anticipated to be completed during the 2019 construction season.  

 

5th Aldermanic District

 

Alley between W. Burleigh St., W. Chambers St., N. 90th St., and N. 91st St.  (SM499180007): Install permeable pavers (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $1,000).  The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Auer Ave. - N. 88th St. to N. 89th St. (WT410190631) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Jeffrey Ct. - N. 110th St. to 250’ West of N.110th St. (WT410190604) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $65,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Jeffrey La. - N. 108th St. to N. 110th St. (WT410190601) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $15,000). The total estimated cost for this project including the requested amount is $235,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Keefe Ave. - N. 90th St. to N. 91st St. (WT410190636) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Marion St. - N. 80th St. to N. 82nd St. (WT410190633) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $180,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Metcalfe Pl. - 160’ East of N. 96th St. to N. 97th St. (WT410190606) Relaying water main.(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Nash St. - N. 96th St. to N. 100th St. (WT410190610) Relay and extension of water main. (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost for this project including the requested amount is $365,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Stark St. - N. 107th St. to N. 110th St. (WT410190602) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost for this project including the requested amount is $305,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 78th St. - W. Burleigh St. to W. Auer Ave. (WT410190680)  Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000.)  The total estimated cost for this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 78th St. - W. Lisbon Ave. to W. Nash St.  (WT410190615)  Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $9,000; Nonassessable Water Fund Budget Line 6410 -- $26,000.)  The total estimated cost for this project including the requested amount is $510,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 79th St. - W. Auer Ave. to W. Lisbon Ave. (WT410190681)  Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 80th St. - W. Townsend St. to W. Nash St. (WT410190614) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost for this project including the requested amount is $335,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 82nd St. - W. Keefe Ave. to 250’ North of W. Nash St.  (WT410190613) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $15,000). The total estimated cost for this project including the requested amount is $220,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 82nd St. - W. Marion St. to 300’ North of W. Marion St. (WT410190632) Relaying water main.(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 82nd St. - W. Vienna Ave to W. Melvina St. (WT410190682) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 84th St. - W. Vienna Ave. to W. Capitol Dr. (WT410190612) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost for this project including the requested amount is $325,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 86th St. - W. Keefe Ave. to W. Capitol Dr. (WT410190611) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $30,000). The total estimated cost for this project including the requested amount is $655,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 87th St. - W. Auer Ave. to W. Concordia Ave. (WT410190629) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 88th St. - W. Auer Ave. to W. Concordia Ave. (WT410190630) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 90th St. - W. Townsend St. to W. Metcalf Pl.  (WT410190635) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $15,000). The total estimated cost for this project including the requested amount is $210,000.  This project is anticipated to be completed during the 2019 construction season.

                     

N. 95th St. - W. Burleigh St. to W. Auer Ave.  (WT410190634) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 97th Pl. - W. Nash St. to W. Metcalf Pl.  (WT410190608) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $15,000). The total estimated cost for this project including the requested amount is $220,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 97th St. - W. Nash St. to W. Metcalf Pl. (WT410190607) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $180,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 108th St. - W. Jeffrey La.  to W. Villard Ave. (WT410190603) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $9,000; Nonassessable Water Fund Budget Line 6410 -- $26,000).  The total estimated cost for this project including the requested amount is $565,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 110th St. - W. Hampton Ave. to W. Cameron Ave.  (WT410190605) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $15,000.)  The total estimated cost for this project including the requested amount is $235,000.  This project is anticipated to be completed during the 2019 construction season.

 

6th Aldermanic District

 

W. Capitol Dr. - N.1st St. to N. 2nd St. (WT410190671) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $10,000). The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2019 construction season.

 

7th Aldermanic District

 

N. 47th St. - W. Capitol Dr. to W. Fiebrantz Ave. (WT410190654) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 48th St. - W. Capitol Dr. to W. Marion St. (WT410190670) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $22,000). The total estimated cost for this project including the requested amount is $480,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 49th St. - W. Capitol Dr. to W. Fiebrantz Ave. (WT410190673) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $155,000.  This project is anticipated to be completed during the 2019 construction season.

 

7th and 15th Aldermanic Districts

 

N. Sherman Blvd. - W. North Ave. to W. Congress St. (SM499180009): Bioretenton maintenance contract (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $1,000). The total estimated cost for this project including the requested amount is $45,000.  This project is anticipated to be completed during the 2018 construction season.

 

8th Aldermanic District

 

City of Milwaukee Lincoln Yards (Tow Lot) 3801 W. Lincoln Ave. (SM499160126): Removal of Accumulated Materials and Sediment from the Lincoln Yards Storm Water Pond.  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $50,000).  The total estimated cost for this project including the requested amount is $310,000.  This project is anticipated to be completed during the 2018 construction season.

 

9th Aldermanic District

 

W. Acacia St. - N. Hastings St. to N. 89th St. (WT410190658) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $180,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Bobolink Ave. - N. 61st St. to N. 63rd St. (WT410190669) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $155,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Brentwood Ave. - N. 86th St. to N. 89th St. (WT410190656) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $15,000).  The total estimated cost for this project including the requested amount is $295,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Brown Deer Rd. - N. 91st St. to N. 124th St. (SM499160123) File Number 161153: Install  Bioswales. (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $15,000 additional funds).  The total estimated cost for this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Daphne St. - N. Hastings St. to N. 89th St. (WT410190660) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $15,000). The total estimated cost for this project including the requested amount is $245,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. Fresno St. - W. Brentwood Ave. to N. 89th St. (WT410190655) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $15,000). The total estimated cost for this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. Hastings St. - W. Acacia St. to W. Kiehnau Ave. (WT410190659) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2019 construction season.

W. Kaul Ave. - N. 60th St. to N. 64th St. (WT410190668) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost for this project including the requested amount is $320,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Kiehnau Ave. - N. Hastings St. to N. 89th St. (WT410190657) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $15,000). The total estimated cost for this project including the requested amount is $215,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 61st St. - W. Carmen Ave. to W. Kaul Ave. (WT410190665) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $22,000). The total estimated cost for this project including the requested amount is $485,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 62nd St. - W. Bobolink Ave. to W. Kaul Ave. (WT410190666) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $15,000). The total estimated cost for this project including the requested amount is $295,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 63rd St. - W. Florist Ave. to W. Kaul Ave. (WT410190667) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the

requested amount is $135,000.  This project is anticipated to be completed during the 2019 construction season.

 

10th Aldermanic District

 

W. Keefe Ave. -- N. 60th St. to W. Appleton Ave. (SM499180005):  Install bioswales (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $25,000.)  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. State St. at N. 54th St. (ST211180194): Replace curb and gutter  (Nonassessable Reconstruction Paving Fund -- $15,000) The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Vienna Ct. - 200’ Southwest of N. 75th St. to N. 75th St. (WT410190617) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 75th St. - W. Nash St. to W. Melvina St. (WT410190616) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost for this project including the requested amount is $350,000.  This project is anticipated to be completed during the 2019 construction season.

 

11th Aldermanic District

 

S. 36th St. - W. Lakefield Dr. to W. Ruskin St.  (WT410190677) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000.)  The total estimated cost for this project including the requested amount is $155,000.  This project is anticipated to be completed during the 2019 construction season.

 

S. 38th St. - W. Euclid Ave. to W. Ruskin St. (WT410190679) Relaying water main.(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2019 construction season.

 

S.60th St. - W. Morgan Ave. to W. Kinnickinnic River Pkwy (SM499180114) Install Bioswales.  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $5,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 64th - W. Arthur Ave. to W. Cleveland Ave. (WT410190627) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $15,000).  The total estimated cost for this project including the requested amount is $295,000.  This project is anticipated to be completed during the 2019 construction season.

 

S. 67th St. - 150’ North of W. Finger Pl. to W. Harrison Ave. (WT410190626) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000).  The total estimated cost for this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2019 construction season.

 

S. 67th St. - W. Fremont Pl. to W. Dakota St. (WT410190620) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $15,000.The total estimated cost for this project including the requested amount is $230,000.  This project is anticipated to be completed during the 2019 construction season.

S. 69th St. - W. Arthur Ave. to W. Cleveland Ave.  (WT410190623) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost for this project including the requested amount is $300,000.  This project is anticipated to be completed during the 2019 construction season.

 

S. 70th St. - W. Arthur Ave. to W. Kinnickinnic River Pk. (WT410190621) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $11,000; Nonassessable Water Fund Budget Line 6410 -- $34,000).  The total estimated cost for this project including the requested amount is $770,000.  This project is anticipated to be completed during the 2019 construction season.

 

S. 71st St. - W. Arthur Ave. to W. Dakota St. (WT410190622) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $30,000).  The total estimated cost for this project including the requested amount is $645,000.  This project is anticipated to be completed during the 2019 construction season.

 

S. 85th St. - W. Morgan Ave. to W. Wilbur Ave. (WT410190689) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost for this project including the requested amount is $335,000.  This project is anticipated to be completed during the 2019 construction season.

 

S. 86th St. - W. Morgan Ave. to 275’ South of W. Wilbur Ave. (WT410190688) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $8,000; Nonassessable Water Fund Budget Line 6410 -- $22,000).  The total estimated cost for this project including the requested amount is $405,000.  This project is anticipated to be completed during the 2019 construction season.

 

S. 87th St. - W. Morgan Ave. to W. Tripoli Ave.  (WT410190687) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $9,000; Nonassessable Water Fund Budget Line 6410 -- $26,000).  The total estimated cost for this project including the requested amount is $580,000.  This project is anticipated to be completed during the 2019 construction season.

 

S. 88th St. - W. Morgan Ave. to W. Crawford Ave.  (WT410190686) Relaying water main.(Nonassessable Water Fund Budget Line 5010 -- $9,000; Nonassessable Water Fund Budget Line 6410 -- $26,000). The total estimated cost for this project including the requested amount is $500,000.  This project is anticipated to be completed during the 2019 construction season.

 

S. 89th St. - W. Warnimont Ave. to W. Crawford Ave. (WT410190685) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost for this project including the requested amount is $325,000.  This project is anticipated to be completed during the 2019 construction season.

 

S. 90th St. W. Wilbur Ave. to W. Crawford Ave.  (WT410190684) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2019 construction season.

 

S. 91st St. - W. Wilbur Ave. to W. Crawford Ave. (WT410190683) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Harrison Ave. - S. 67th St. to S. 71st St. (WT410190625) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost for this project including the requested amount is $370,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Ruskin St. - S. 36th St. to S. 38th St. (WT410190678) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2019 construction season.

 

12th Aldermanic District

 

S. 16th St. -- W. Cleveland Ave. to 400’ +/- South of W. Cleveland Ave.  (SM499180115) Install Bioswales.  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $5,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2018 construction season.

 

13th Aldermanic District

 

W. Barnard Ave. -- S. 20th St. to S. 21st St. (WT410190644) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Barnard Ave. - S. 26th St. to S. 27th St. (WT410190641) Relaying water main.

(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2019 construction season.

 

W. Marilyn Ave. -- W. Ramsey to W. Iona Terr. (SM499180003) Install bioswales:  (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $25,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Parnell Ave. - W. Ramsey Ave. to S. 27th St. (SM499180002): Install bioswales (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $25,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 20th St. - W. Howard Ave. to W. Morgan Ave. (SM499180004):Install bioswales (Storm Water Quality - Nonassessable Water Quality Projects to meet TMDL Requirements -- $25,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 21st St. - 300’ North of W. Barnard Ave. to W. Barnard Ave. (WT410190643) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2019 construction season.

 

S. 22nd Pl. - W. Layton Ave. to W. Barnard Ave.  (WT410190637) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $155,000.  This project is anticipated to be completed during the 2019 construction season.

 

S. 24th St. - W. Barnard Ave. to W. Carpenter Ave.  (WT410190638) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2019 construction season.

 

S. 26th St. - W. Barnard Ave. to 250’ South of W. Barnard Ave. (WT410190639) Relaying water main.(Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $65,000.  This project is anticipated to be completed during the 2019 construction season.

 

14th Aldermanic District

 

S. Logan Ave. - E. Howard Ave. to E. Norwich Ave. (WT410190628) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2019 construction season.

 

15th Aldermanic District

 

W. Vine St. - N. 29th St. to N. 30th St. (SM495180020) Relaying combined sewer.

(Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $122,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 31st St. - W. Garfield Ave. to W. North Ave. (SM495180019) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000.  The total estimated cost for this project including the requested amount is $128,000.  This project is anticipated to be completed during the 2019 construction season.

 

N. 34th St. - W. Garfield Ave. to W. North Ave  (SM495180018) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost for this project including the requested amount is $132,000.  This project is anticipated to be completed during the 2019 construction season.

 

City of St. Francis

 

E. Bottsford Ave. - S. Pennsylvania Ave. to 300’ East of S. Illinois Ave. (WT410190676) Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $6,000; Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost for this project including the requested amount is $385,000.  This project is anticipated to be completed during the 2019 construction season.

 

S. New York Ave. - E. Bottsford Ave. to E. Van Norman Ave. (WT410190675) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $11,000). The total estimated cost for this project including the requested amount is $185,000.  This project is anticipated to be completed during the 2019 construction season.

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/Dee  La Belle

Npr10 Sub

03 /29/2018

dkf technical corrections 5/4/18