File #: 170478    Version:
Type: Resolution Status: Passed
File created: 7/11/2017 In control: COMMON COUNCIL
On agenda: Final action: 7/31/2017
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,959,500 for a total estimated cost $2,109,700.
Sponsors: THE CHAIR
Indexes: ASSESSMENTS, PUBLIC IMPROVEMENTS
Attachments: 1. Official Notice, 2. LTR-AFR 15 CE Signature.pdf, 3. Notice Published on 8-16-17
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
8/9/20171 MAYOR SIGNED   Action details Meeting details Not available
7/31/20171 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
7/19/20170 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 2nd Aldermanic District N. 57th St.- W. Villard Ave. toW. Custer Ave. (ST211170161): Install traffic calming speed hump(s). Michael Gradus, 2nd District Legislative Assistant, stated that Ald. Johnson received 3 ayes, 7 noes and is not in support of the project. Ald. Bohl moved to delete the project. (Prevailed 5-0) 4th Aldermanic District N. Astor St. – E. Kilbourn Ave. to E. State St. (TD08284500/ST211160122): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (13-foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $6,400; TID - 82 Funds -- $125,000. The total estimated cost for this project including the requested amount is $156,000. This project is anticipated to be completed during the 2017-18 construction season. Ald. Bauman moved approval. (Prevailed 5-0) 5th Aldermanic District W. Metcalf Pl. – N. 92nd St. to N. 97th St. (Including W. Nash St.) (ST211150138) File Number 140037: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7-foot width of tree border area), and grading. Ald. Bohl moved approval. (Prevailed 5-0) 6th Aldermanic District W. Garfield Ave. – N. Dr. Martin Luther King Jr. Dr. to N. 4th St. (ST211150150) File Number 131739: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8-foot width north side of tree border area), and grading. Ald. Donovan moved approval. (Prevailed 5-0) 7th Aldermanic District W. Auer Ave. – N. 50th St. to N. 51st Blvd. (ST211170168): Install traffic calming speed hump(s). David Cohen 5126 W Concordia Ave stated that he is in opposition. Eukhil Penske 3204 N 51st Blvd stated that there were 6 accidents and 2 deaths on this corner and is in support. Jim Hiller 3291 N 51st Blvd stated that he has witnessed speeding and is in support. Sherman Morton, 7th District Legislative Assistant, stated that Ald. Rainey is in support. Ald. Donovan moved approval. (Prevailed 5-0) W. Concordia Ave. – N. 50th St. to N. 52nd St. (ST211170170): Install traffic calming speed hump(s). Sherman Morton, 7th District Legislative Assistant, stated that Ald. Rainey is in support. Ald. Donovan moved approval. (Prevailed 5-0) W. Hadley St. – N. 50th St. to N. 51st St. (ST211170149): Install traffic calming speed hump(s). Sherman Morton, 7th District Legislative Assistant, stated that Ald. Rainey is in support. Ald. Donovan moved approval. (Prevailed 5-0) N. 24th St. – W. Auer Ave. to W. Concordia Ave. (ST211170205): Install traffic calming speed hump(s). Sherman Morton, 7th District Legislative Assistant, stated that Ald. Rainey is in support. Ald. Donovan moved approval. (Prevailed 5-0) N. 42nd St. – W. Capitol Dr. to W. Fiebrantz Ave. (ST211170179): Install traffic calming speed hump(s). Phyllis Price 4067 N 42nd St stated that she is in opposition. Patricia Bend 4061 N 42nd St stated that the block is quiet, besides drug dealing and is in opposition. Oscar Bond 4035 N 42nd St stated that he has witnessed issues with traffic, speeding, drug dealing, accidents, and is in support. Sherman Morton, 7th District Legislative Assistant, stated that Ald. Rainey is in support. Ald. Bohl moved approval. (Prevailed 5-0) N. 44th St. – W. Leon Terr./W. Roosevelt Dr. to W. Capitol Dr. (ST211170101) File Number 150716: Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (7-foot width of tree border area), and tree removal where necessary. Sherman Morton, 7th District Legislative Assistant, stated that Ald. Rainey is in support. Ald. Bohl moved approval. (Prevailed 5-0) 8th Aldermanic District S. 31st St. – W. Becher St. to W. Rogers St. (ST211170208): Install traffic calming speed hump(s). Blanca Lopez 2071 S 31st St stated that there are issues with speeding and is in support. Ald. Donovan moved approval. (Prevailed 5-0) S. 33rd St. – W. Becher St. to W. Rogers St. (ST211170209):Install traffic calming speed hump(s). Blanca Lopez 2071 S 31st St stated that she is in support. Ald. Donovan moved approval. (Prevailed 5-0) S. 38th St.- W. Branting Ln. to W. Orchard St. (ST211171125): Install traffic calming speed hump(s). Ald. Donovan moved to Hold to the Call of the Chair based on a split in votes. (Prevailed 5-0) 10th Aldermanic District W. Blue Mound Ct. – 400 feet m/l east of N. Story Pkwy. to 50 feet m/l east of N. Story Pkwy. (ST211150101) File Number 131375: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (10-foot width of tree border area), and grading. Edwin Huertas, 10th District Legislative Assistant, stated that Ald. Murphy is in support. Ald. Donovan moved approval. (Prevailed 5-0) W. St. Paul Ave. – N. 92nd St. to N. 95th St. (ST211150163): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8-foot width of tree border area), and grading. Edwin Huertas, 10th District Legislative Assistant, stated that Ald. Murphy is in support. He stated that out of 12 survey cards mailed, there were 8 ayes and 2 noes. Ald. Donovan moved approval. (Prevailed 5-0) N. 58th St. - W. Wright St. toW. Clarke St. (ST211170214): Install traffic calming speed hump(s). Edwin Huertas, 10th District Legislative Assistant, stated that out of 8 postcards returned, there was 3 ayes, 5 noes, and Ald. Murphy is in opposition. Ald. Donovan moved to delete the project. (Prevailed 5-0) 14th Aldermanic District S. California St. – E. Euclid Ave. to E. Oklahoma Ave. (ST211150161): Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (7-foot width of tree border area), and tree removal where necessary. Scott Herman 3151 S California St stated that he is in support of the project, but is opposed to the payment. Carol Hazard 3147 S California St stated that she is in support of the project, but is opposed to the payment. Ald. Zielinski stated that he is in support. Ald. Bohl moved approval. (Prevailed 4-0) E. Montana St. – S. Austin St. to S. Burrell St. (ST211170210): Install traffic calming speed hump(s). Ald. Zielinski stated that he is in support. Ald. Donovan moved approval. (Prevailed 5-0) S. Shore Dr. – E. Nock St. to E. Iron St. (ST211170211): Install traffic calming speed hump(s). Ald. Zielinski stated that he is in support. Ald. Donovan moved approval. (Prevailed 5-0) S. Taylor Ave. – E. Norwich Ave. to E. Howard Ave. (ST211170212): Install traffic calming speed hump(s). Ald. Zielinski stated that he is in support. Ald. Donovan moved approval. (Prevailed 5-0) E. Wilson St. – S. Kinnickinnic Ave. to S. Howell Ave. (ST211170213): Install traffic calming speed hump(s). Ald. Zielinski stated that he is in support. Ald. Donovan moved approval. (Prevailed 5-0) S. 12th St. – W. Holt Ave. to W. Ohio Ave. (ST211170207): Install traffic calming speed hump(s). Chris Novac 3344 S 12th St stated that she has witnessed some speeding, but not excessive speeding and is in opposition. Omar Bravo 3406 S 12th St stated that he has witnessed speeding and is in support. Ald. Zielinski stated that he is in support. Ald. Donovan moved approval. (Prevailed 5-0) S. 12th St. – W. Morgan Ave. to W. Holt Ave. (ST211170206): Install traffic calming speed hump(s). Ald. Zielinski stated that he is in support. Ald. Donovan moved approval. (Prevailed 5-0) 15th Aldermanic District N. 34th St. – W. Center St. to W. Locust St. (ST211150203): Install traffic calming speed hump(s). Mary Dziewiontkoski stated that Ald. Stamper is in support. Ald. Donovan moved approval. (Prevailed 5-0) N. 47th St. - W. Wright St. toW. Clarke St. (ST211170202): Install traffic calming speed hump(s). Dione Anderson 2551 N 47th St stated that she is in opposition and 16 out of 24 neighbors are in opposition. Mary Dziewiontkoski stated that Ald. Stamper would like to delete the project based on the postcard survey. Ald. Donovan moved to delete based on the postcard survey. (Prevailed 5-0) Ald. Donovan moved approval as amended. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
7/11/20170 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

170478

Version

SUBSTITUTE 1

Reference

140037

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,959,500 for a total estimated cost $2,109,700.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $1,959,500.  The total estimated cost of these projects is $2,109,700.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

4th Aldermanic District

 

N. Astor St. - E. Kilbourn Ave. to E. State St. (TD08284500/ST211160122):

Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (13-foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $6,400; TID - 82 Funds -- $125,000.  The total estimated cost for this project including the requested amount is $156,000.  This project is anticipated to be completed during the 2017-18 construction season.

 

5th Aldermanic District

 

W. Metcalf Pl. - N. 92nd St. to N. 97th St. (Including W. Nash St.) (ST211150138) File Number 140037: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7-foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $26,400; Nonassessable Reconstruction Paving Fund -- $325,000).  The total estimated cost for this project including the requested amount is $376,000.  This project is anticipated to be completed during the 2017-18 construction season.

 

6th Aldermanic District

 

W. Garfield Ave. - N. Dr. Martin Luther King Jr. Dr. to N. 4th St. (ST211150150) File Number 131739: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8-foot width north side of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $18,400; Nonassessable Reconstruction Paving Fund -- $ 125,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2017-18 construction season.

 

7th Aldermanic District

 

W. Auer Ave. - N. 50th St. to N. 51st Blvd. (ST211170168): Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $1,200; Nonassessable Reconstruction Paving Fund -- $5,000).  The total estimated cost for this project including the requested amount is $6,200.  This project is anticipated to be completed during the 2017-18 construction season.

 

W. Concordia Ave. - N. 50th St. to N. 52nd St. (ST211170170): Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $2,600; Nonassessable Reconstruction Paving Fund -- $9,500).  The total estimated cost for this project including the requested amount is $12,100.  This project is anticipated to be completed during the 2017-18 construction season.

 

W. Hadley St. - N. 50th St. to N. 51st St. (ST211170149): Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $1,100; Nonassessable Reconstruction Paving Fund -- $6,000).  The total estimated cost for this project including the requested amount is $7,100.  This project is anticipated to be completed during the 2017-18 construction season.

 

N. 24th St. - W. Auer Ave. to W. Concordia Ave. (ST211170205): Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $8,100; Nonassessable Reconstruction Paving Fund -- $5,100).  The total estimated cost for this project including the requested amount is $13,200.  This project is anticipated to be completed during the 2017-18 construction season.

 

N. 42nd St. - W. Capitol Dr. to W. Fiebrantz Ave. (ST211170179): Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $6,500; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $8,500.  This project is anticipated to be completed during the 2017-18 construction season.

 

N. 44th St. - W. Leon Terr./W. Roosevelt Dr. to W. Capitol Dr. (ST211170101) File Number 150716: Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (7-foot width of tree border area), and tree removal where necessary. (Assessable Reconstruction Paving Fund -- $42,100; Nonassessable Reconstruction Paving Fund -- $600,000).  The total estimated cost for this project including the requested amount is $667,000.  This project is anticipated to be completed during the 2017 construction season.

 

8th Aldermanic District

 

S. 31st St. - W. Becher St. to W. Rogers St. (ST211170208): Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,600; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $9,600.  This project is anticipated to be completed during the 2017-18 construction season.

 

S. 33rd St. - W. Becher St. to W. Rogers St. (ST211170209):Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,000; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $9,000.  This project is anticipated to be completed during the 2017-18 construction season.

 

10th Aldermanic District

 

W. Blue Mound Ct. - 400 feet m/l east of N. Story Pkwy. to 50 feet m/l east of N. Story Pkwy. (ST211150101)  File Number 131375: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (10-foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $4,500; Nonassessable Reconstruction Paving Fund -- $100,000).  The total estimated cost for this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2017-18 construction season.

 

W. St. Paul Ave. - N. 92nd St. to N. 95th St. (ST211150163) File Number 140146:

Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8-foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $25,900; Nonassessable Reconstruction Paving Fund -- $260,000).  The total estimated cost for this project including the requested amount is $305,000.  This project is anticipated to be completed during the 2017-18 construction season.

 

14th Aldermanic District

 

S. California St. - E. Euclid Ave. to E. Oklahoma Ave. (ST211150161) File Number 140146: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7-foot width of tree border area), and tree removal where necessary. (Assessable Reconstruction Paving Fund -- $12,100; Nonassessable Reconstruction Paving Fund -- $150,000).  The total estimated cost for this project including the requested amount is $182,000.  This project is anticipated to be completed during the 2017-18 construction season.

 

E. Montana St. - S. Austin St. to S. Burrell St. (ST211170210): Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $4,100; Nonassessable Reconstruction Paving Fund -- $3,000).  The total estimated cost for this project including the requested amount is $7,100.  This project is anticipated to be completed during the 2017-18 construction season.

 

S. Shore Dr. - E. Nock St. to E. Iron St. (ST211170211): Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $6,300; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $8,300.  This project is anticipated to be completed during the 2017-18 construction season.

 

S. Taylor Ave. - E. Norwich Ave. to E. Howard Ave. (ST211170212): Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,700; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $9,700.  This project is anticipated to be completed during the 2017-18 construction season.

 

E. Wilson St. - S. Kinnickinnic Ave. to S. Howell Ave. (ST211170213): Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $5,700; Nonassessable Reconstruction Paving Fund -- $5,900).  The total estimated cost for this project including the requested amount is $11,600.  This project is anticipated to be completed during the 2017-18 construction season.

 

S. 12th St. - W. Holt Ave. to W. Ohio Ave. (ST211170207): Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,800; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $9,800.  This project is anticipated to be completed during the 2017-18 construction season.

 

S. 12th St. - W. Morgan Ave. to W. Holt Ave. (ST211170206): Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,900; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $9,900.  This project is anticipated to be completed during the 2017-18 construction season.

 

15th Aldermanic District

 

N. 34th St. - W. Center St. to W. Locust St. (ST211150203): Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $14,600; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $16,600.  This project is anticipated to be completed during the 2017-18 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That projects:   N. Astor St. (TD08284500); W. Metcalf Pl. (ST211150138); W. Garfield Av. (ST211150150); W. Auer Av. (ST211170168); W. Concordia Av. (ST211170170); W. Hadley St. (ST211170149); N. 24th St. (ST211170205); N. 42nd St. (ST211170179); N. 44th St. (ST211170101); S. 31st St. (ST211170208); S. 33rd St. (ST211170209); W. Blue Mound Ct. (ST211150101); W. St. Paul Av. (ST211150163); S. California Av. (ST211150161); E. Montana St. (ST211170210); S. Shore Dr. (ST211170211); S. Taylor Dr. (ST211170212); E. Wilson St. (ST211170213); S. 12th St. (ST211170207); S. 12th St. (ST211170206); and N. 34th St. (ST211150203) will be billed after January 1, 2019, but not before 12 months after the project contract has been completed; and, be it

 

Further Resolved, That the following projects be deleted from the 2017 Paving Program:  N. 57th St. (ST211170161); N. 58th St. (ST211170214); N. 47th St. (ST211170202).

 

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski

Afr 15

07/19/2017