powered help
header-left header-center header-right
File #: 170141    Version:
Type: Resolution Status: Passed
File created: 5/9/2017 In control: COMMON COUNCIL
On agenda: Final action: 5/31/2017
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $890,500 for a total estimated cost of $934,500.
Sponsors: THE CHAIR
Attachments: 1. Cover Letter, 2. Official Notice
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
6/16/20171 CITY CLERK PUBLISHED   Action details Meeting details Not available
6/9/20171 MAYOR SIGNED   Action details Meeting details Not available
5/31/20171 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
5/17/20170 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 1st Aldermanic District N. 27th St. - W. Villard Ave. to a point 600 feet m/l north of W. Silver Spring Dr. (ST211060102) File Number 131474: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (20-foot width of tree border area), and grading. Mike Zimmerman 2730 W Silver Spring Dr stated the project will affect their business. This is the only access to their business. Mary stated that they will work out a plan with Mr. Zimmerman and include it in the contract. Ald. Borkowski moved approval. (Prevailed 4-0) 8th Aldermanic District S. 30th St. - W. Hayes Ave. to W. Lincoln Ave. (ST211170143) File Number 170140: Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $5,500; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,500. This project is anticipated to be completed during the 2017 construction season. Ald. Bohl moved approval. (Prevailed 4-0) 11th Aldermanic District S. 53rd St. - W. Nebraska Ave./S. Utah Ave. to W. Oklahoma Ave. (ST211150167) File Number 140278: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8-foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $16,000; Nonassessable Reconstruction Paving Fund -- $260,000). The total estimated cost for this project including the requested amount is $300,000. This project is anticipated to be completed during the 2017 construction season. Warner Schumalowski 5300 W Euclid Ave. stated he supports the repairs. Ald. Borkowski moved approval. (Prevailed 4-0)
Pass4:0 Action details Meeting details Video Video
5/9/20170 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

170141

Version

SUBSTITUTE 1

Reference

131474

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $890,500 for a total estimated cost of $934,500.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $890,500.  The total estimated cost of these projects is $934,500.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

1st Aldermanic District

 

N. 27th St. - W. Villard Ave. to a point 600 feet m/l north of W. Silver Spring Dr. (ST211060102) File Number 131474:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (20-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $107,000; Nonassessable Reconstruction Paving Fund -- $500,000).  The total estimated cost for this project including the requested amount is $625,000.  This project is anticipated to be completed during the 2017 construction season.

 

8th Aldermanic District

 

S. 30th St. - W. Hayes Ave. to W. Lincoln Ave. (ST211170143) File Number 170140:  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $5,500; Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $9,500.  This project is anticipated to be completed during the 2017 construction season.

 

11th Aldermanic District

 

S. 53rd St. - W. Nebraska Ave./S. Utah Ave. to W. Oklahoma Ave. (ST211150167) File Number 140278:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $16,000; Nonassessable Reconstruction Paving Fund -- $260,000).  The total estimated cost for this project including the requested amount is $300,000.  This project is anticipated to be completed during the 2017 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That projects:  N. 27th St. (ST211060102), S. 30th St. (ST211170143), and S. 53rd St. (ST211150167) will be billed after January 1, 2019, but not before 12 months after the project contract has been completed.

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/Denise Reinholtz

Afr 12

05/18/2017